← Back
BuildNYC
Three families
1766 BAY RIDGE PARKWAY
BROOKLYN · Bensonhurst · BIN 3160235
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R5Zoning
2,480 sfGross Floor Area
3Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Three families · 2,517 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Cellar and 2nd floor mechanical work4p · 2 filings · 20 docs
Floor 1Cellar and 2nd floor mechanical work3p · 2 filings · 20 docs
CellarCellar and 2nd floor mechanical work3p · 2 filings · 20 docs
Site & exteriorCellar and 2nd floor mechanical work1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-Con Engineering407/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M J Design Build403/21/2026
Integrity UV 168203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cube Builders Group NYspecialty_contractor303/21/2026
PipestylistsPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-Con Engineering7341407/06/2022
Building Lifecycle
05/01/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
06/06/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
11/25/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
04/08/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/21/2023
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T Plumbing12/29/2021
DOB NOWMechanical SystemsSigned-offCube Builders Group NY12/28/2021
1 project · most recent 08/04/2022
General Wiring
FiledStatusContractorScope
08/04/2022CompleteW 8 ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/05/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
07/07/2022Mechanical SystemsMichelle Contrispecial
07/07/2022Fire-Resistant Penetrations and JointsMichelle Contrispecial
07/07/2022FinalMichelle Contriprogress
07/07/2022Energy Code Compliance InspectionsMichelle Contriprogress
07/07/2022Fire-Resistance Rated ConstructionMichelle Contriprogress
07/07/2022HVAC-R and service water heating system controlsMichelle Contrienergy_progress
07/07/2022HVAC-R and service water heating equipmentMichelle Contrienergy_progress
07/07/2022Fenestration and door U-factor and product ratingsMichelle Contrienergy_progress
07/07/2022Fenestration areasMichelle Contrienergy_progress
07/07/2022Air barrier - visual inspectionMichelle Contrienergy_progress
07/07/2022Insulation placement and R valuesMichelle Contrienergy_progress
07/07/2022HVAC-R and service water piping design and insulationMichelle Contrienergy_progress
06/30/2022Fire-Resistant Penetrations and JointsMichelle Contrispecial
06/30/2022Mechanical SystemsMichelle Contrispecial
06/30/2022Energy Code Compliance InspectionsMichelle Contriprogress
06/30/2022FinalMichelle Contriprogress
06/30/2022Fire-Resistance Rated ConstructionMichelle Contriprogress
06/30/2022HVAC-R and service water heating equipmentMichelle Contrienergy_progress
06/30/2022Fenestration areasMichelle Contrienergy_progress
06/30/2022Fenestration and door U-factor and product ratingsMichelle Contrienergy_progress
06/30/2022Air barrier - visual inspectionMichelle Contrienergy_progress
06/30/2022HVAC-R and service water piping design and insulationMichelle Contrienergy_progress
06/30/2022HVAC-R and service water heating system controlsMichelle Contrienergy_progress
06/30/2022Insulation placement and R valuesMichelle Contrienergy_progress
04/11/2022Fire-Resistant Penetrations and JointsMichelle Contrispecial
Latest 25 of 29.
43 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account