← Back
Zoned commercial or Manhattan residential
1768 47 STREET
BROOKLYN · BIN 3128883
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R5Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned commercial or Manhattan residential · 3,005 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 1 filing · 20 docs
Floor 3Under Construction11p · 1 filing · 20 docs
Floor 2Under Construction11p · 1 filing · 20 docs
Floor 1Under Construction11p · 1 filing · 20 docs
CellarUnder Construction11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS907/08/2026
BUILDERS INC BLUE DREAM303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/29/2021$1.4M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHER ARCHITECT810/23/2025
ASHRAF CORP309/28/2024
EYAL LEVITT ARCHITECT PC102/27/2023
ME CONSULTING ENGINEERING110/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERETZ BUILDERS ASSISTANCE.1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE DREAM BUILDERS INCGeneral Contractor1207/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor207/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616210/23/2025
SHAHRISH SHUVO ENGINEERIN8524610/07/2024
Building Lifecycle
All (101)Filed (13)Permit Issued (15)Signed Off (11)Violation (3)Inspection (17)Objection (12)Special Inspection (30)
08/11/2026
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
07/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/18/2026
Signed off — New Building
Mechanical work filed in conjunction with GC Application Job #B00777921-I1
B00777921-I1
06/01/2026
Signed off — New Building
Mechanical work filed in conjunction with GC Application Job #B00777921-I1
B00777921-S6
05/07/2026
Signed off — New Building
Mechanical work filed in conjunction with GC Application Job #B00777921-I1
B00777921-S4
05/07/2026
Signed off — Alteration
PLUMBING PLAN FOR PIPING AND PLUMBING FIXTURES TO NEW 3 STORY 1 FAMILY BUILDING, FILED IN CONJUNCTION WITH GC#B00777921-I1
B00814732-I1
05/07/2026
Signed off — New Building
Mechanical work filed in conjunction with GC Application Job #B00777921-I1
B00777921-S5
05/07/2026
Signed off — New Building
Mechanical work filed in conjunction with GC Application Job #B00777921-I1
B00777921-S8
03/04/2026
Signed off — New Building
Mechanical work filed in conjunction with GC Application Job #B00777921-I1
B00777921-S1
03/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/02/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/06/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/19/2025
Signed off — New Building
Mechanical work filed in conjunction with GC Application Job #B00777921-I1
B00777921-S7
11/13/2025
Signed off — Alteration
B08016835-I1
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/23/2025
Filed — Alteration
PLUMBING PLAN FOR PIPING AND PLUMBING FIXTURES TO NEW 3 STORY 1 FAMILY BUILDING, FILED IN CONJUNCTION WITH GC#B00777921-I1
B00814732-P1
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/20/2025
Permit issued — General Construction
B00777921-I1-GC
08/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/30/2025
Permit issued — Curb Cut
B00777921-S1-CC
07/30/2025
Permit issued — Mechanical Systems
B00777921-S8-MS
05/27/2025
Signed off — Alteration
B01071191-I1
05/27/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01071200-I1
05/13/2025
Permit issued — Construction Fence
B08016835-I1-FN
04/22/2025
Permit issued — Sprinklers
B00777921-S6-EW-SP
04/09/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/17/2024
Permit issued — General Construction
B00777921-I1-GC
10/14/2024
Special inspection requirement — Duct leakage testing, insulation and design
Shahrish Shuvo
10/07/2024
Filed — New Building
Mechanical work filed in conjunction with GC Application Job #B00777921-I1
B00777921-S8
10/07/2024
Special inspection requirement — Maintenance information
Shahrish Shuvo
10/07/2024
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
10/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/07/2024
Special inspection requirement — Final
Shahrish Shuvo
10/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
10/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
10/07/2024
Special inspection requirement — Ventilation and air distribution system
Shahrish Shuvo
10/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
09/28/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01071200-P1
08/26/2024
Permit issued — Supported Scaffold
B01071200-I1-SF
08/23/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01071200-I1
08/06/2024
Permit issued — Plumbing
B00814732-I1-PL
06/27/2024
Permit issued — Sidewalk Shed
B01071191-I1-SH
06/26/2024
Filed — Alteration
B01071191-I1
05/22/2024
Permit issued — Construction Fence
B08016835-I1-FN
03/15/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/19/2024
Violation issued (ECB, closed)
Unknown
01/19/2024
Violation issued (ECB, closed)
Construction
01/19/2024
Violation issued (ECB, closed)
Unknown
12/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/15/2023
Filed — New Building
Mechanical work filed in conjunction with GC Application Job #B00777921-I1
B00777921-S1
10/30/2023
Permit issued — Foundation
B00777921-S7-FO
10/30/2023
Permit issued — Structural
B00777921-S5-ST
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBLUE DREAM BUILDERS INC10/20/2025
DOB NOWCurb CutSigned-offBLUE DREAM BUILDERS INC07/30/2025
DOB NOWMechanical SystemsSigned-offBLUE DREAM BUILDERS INC07/30/2025
DOB NOWConstruction FenceSigned-offBLUE DREAM BUILDERS INC05/13/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC04/22/2025
DOB NOWGeneral ConstructionPermit IssuedBLUE DREAM BUILDERS INC10/17/2024
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS08/26/2024
DOB NOWPlumbingSigned-offN AND S PLUMBING INC08/06/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS06/27/2024
DOB NOWConstruction FenceSigned-offBLUE DREAM BUILDERS INC05/22/2024
DOB NOWFoundationSigned-offBLUE DREAM BUILDERS INC10/30/2023
DOB NOWStructuralSigned-offBLUE DREAM BUILDERS INC10/30/2023
DOB NOWGeneral ConstructionPermit IssuedBLUE DREAM BUILDERS INC10/26/2023
DOB NOWSupport of ExcavationSigned-offBLUE DREAM BUILDERS INC10/24/2023
DOB NOWConstruction FenceSigned-offBLUE DREAM BUILDERS INC06/19/2023
BIS—ISSUEDHEXAGON INDUSTRIES INC08/02/2023
1 project · most recent 10/07/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/07/2024Permit IssuedBLUE DREAM BUILDERS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXSQ24TBVJUB 23,000 BTU · Condensing Unit ×8
RXTQ36TBVJUB 34,200 BTU · Vrf Outdoor ×8
RXTQ60TBVJUB 57,500 BTU · Vrf Outdoor ×8
RXTQ48TBVJUB 45,500 BTU · Vrf Outdoor ×4
Ventilation
Nutone 126313 50 CFM · Exhaust Fan ×32
Delta Breeze ITG100 100 CFM · Exhaust Fan ×8
1 project · most recent 10/07/2024
Sprinkler System
FiledStatusContractorScope
10/07/2024Signed-offPRIME PIPING & HEATING INSprinkler System
2 projects · most recent 11/17/2024
General Wiring
FiledStatusContractorScope
11/17/2024CompleteDAVRY ELECTRIC INCGeneral Wiring
06/21/2024CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
08/11/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
07/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/02/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/06/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/09/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/09/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
11/10/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/22/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/14/2024Duct leakage testing, insulation and designShahrish Shuvoenergy_progress
10/07/2024Maintenance informationShahrish Shuvoenergy_progress
10/07/2024Mechanical SystemsShahrish Shuvospecial
10/07/2024Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/07/2024FinalShahrish Shuvoprogress
10/07/2024HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
10/07/2024HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
10/07/2024Ventilation and air distribution systemShahrish Shuvoenergy_progress
10/07/2024HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
02/22/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
02/22/2023Sprinkler SystemsShahrish Shuvospecial
01/16/2023FinalShahrish Shuvoprogress
01/16/2023Concrete - Cast-In-PlaceShahrish Shuvospecial
01/16/2023Subsurface Conditions – Fill Placement & In-Place DensityShahrish Shuvospecial
01/16/2023Excavations - Sheeting, Shoring, and BracingShahrish Shuvospecial
01/16/2023Subgrade InspectionsShahrish Shuvospecial
01/16/2023Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
01/16/2023Concrete - Cast-In-PlaceShahrish Shuvospecial
01/16/2023Post-installed AnchorsShahrish Shuvospecial
01/16/2023Structural Cold-Formed SteelShahrish Shuvospecial
01/16/2023Structural Steel - DetailsShahrish Shuvospecial
01/16/2023Structural Steel - High Strength BoltingShahrish Shuvospecial
01/16/2023Structural Steel - WeldingShahrish Shuvospecial
Latest 25 of 40.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/28/2026B08016835-I1Request digital key ↗
08/27/2026B00777921-S8Request digital key ↗
08/27/2026B00777921-S7Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
01/08/2025340913426Open ↗
09/21/2022322111692Open ↗
▸BISWORK PERMIT APPLICATION1
08/03/2023322111692Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/01/2024340913426Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00777921-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/27/2026B00777921-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00777921-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026B08016835-I1Open ↗
08/27/2026B00777921-S8Open ↗
08/27/2026B00777921-S7Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00777921-I1Open ↗
08/28/2026B00814732-P1Open ↗
08/28/2026B00777921-S5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00777921-I1Open ↗
09/01/2026B00777921-I1Open ↗
08/28/2026B00777921-S5Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/01/2024340913426Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/01/2024340913426Open ↗
▸Trade Schedules & Equipment2
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
08/03/2023322111692Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00777921-I1Open ↗
▸Safety & Tenant Protection8
▸BISANTI-HARASSMENT CHECKLIST1
08/03/2023322111692Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/03/2023322111692Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/01/2024340913426Open ↗
▸BISSTREET TREE CHECKLIST1
11/01/2024340913426Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00777921-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/27/2026B00777921-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/27/2026B00777921-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/27/2026B00777921-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/03/2023322111692Open ↗
▸BISRODENT CONTROL1
08/03/2023322111692Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/27/2026B00777921-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/13/2026B00777921-S7Open ↗
08/13/2026B00777921-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00777921-S7Open ↗
08/13/2026B00777921-S4Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026B00777921-S7Open ↗
08/13/2026B00777921-S4Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION5
08/03/2023322111692Open ↗
08/03/2023322111692Open ↗
08/03/2023322111692Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/24/2026340913426Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/03/2023322111692Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
08/03/2023322111692Open ↗
09/21/2022322111692Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/01/2024340913426Open ↗
▸BISEFILING COVER SHEET1
09/21/2022322111692Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/01/2024340913426Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION5
01/08/2025340913426Open ↗
01/08/2025340913426Open ↗
01/08/2025340913426Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification1
08/27/2026B00777921-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00777921-I1Open ↗
▸DOB NOWFinal Survey1
08/27/2026B00777921-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00777921-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00777921-S4Open ↗