1768 79TH STREET
BROOKLYN · Bensonhurst · BIN 3162739
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R5Zoning
5,289 sfGross Floor Area
6Units
Rent Stabilized3 Active Violations 1 likely answered ▸FDNY Report ↗
Five to six families · 2,650 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Unit 3F4p · 1 filing · 18 docs
Floor 2Unit 2FT15p · 4 filings · 20 docs
Floor 1Unit 1FT, Unit 1RE15p · 4 filings · 20 docs
Cellar11p · 4 filings · 20 docs
Site & exterior2p · 1 filing · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2022$1.4M—Private party → Private party$274/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Huan Design309/13/2024
J&R Design and Inspection904/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
High Quality 3381403/21/2026
Highquality Construction VNW403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
American Standard P&H CororpPlumbing407/08/2026
High Quality ConstructionGeneral Contractor107/08/2026
NY Building AssociatesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Huan Design7669309/13/2024
NKM Engineering6244304/21/2023
J&R Design and Inspection6637603/23/2023
Building Lifecycle
All (82)Filed (12)Permit Issued (6)Signed Off (6)Violation (18)Inspection (10)Special Inspection (30)
05/01/2026
Violation issued (HPD, closed)
A
11/19/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2025
Violation issued (HPD, closed)
A
01/06/2025
Signed off — Alteration
INTERIOR RENOVATION ON 3RD FLOOR (APT. 3F) OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL,FLOOR DRAIN, REPLACE KITCHEN AND BATHROOM FIXTURE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01110894-I1
01/03/2025
Signed off — Alteration
INTERIOR RENOVATION ON 3RD FLOOR (APT. 3F) OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL,FLOOR DRAIN, REPLACE KITCHEN AND BATHROOM FIXTURE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01110894-S1
01/03/2025
Signed off — Alteration
INTERIOR RENOVATION ON 3RD FLOOR (APT. 3F) OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL,FLOOR DRAIN, REPLACE KITCHEN AND BATHROOM FIXTURE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01110894-S2
12/11/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/04/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/18/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/19/2024
Permit issued — Boiler Equipment
B01110894-S2-BE
09/18/2024
Permit issued — General Construction
B01110894-I1-GC
09/18/2024
Permit issued — Plumbing
B01110894-S1-PL
09/13/2024
Filed — Alteration
INTERIOR RENOVATION ON 3RD FLOOR (APT. 3F) OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL,FLOOR DRAIN, REPLACE KITCHEN AND BATHROOM FIXTURE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01110894-I1
09/13/2024
Filed — Alteration
INTERIOR RENOVATION ON 3RD FLOOR (APT. 3F) OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL,FLOOR DRAIN, REPLACE KITCHEN AND BATHROOM FIXTURE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01110894-S1
09/13/2024
Filed — Alteration
INTERIOR RENOVATION ON 3RD FLOOR (APT. 3F) OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL,FLOOR DRAIN, REPLACE KITCHEN AND BATHROOM FIXTURE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01110894-S2
09/13/2024
Special inspection requirement — Heating Systems
ZHENHUAN XU
09/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
09/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
09/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
09/13/2024
Special inspection requirement — Maintenance information
ZHENHUAN XU
09/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
09/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
09/13/2024
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
09/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
09/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
09/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
09/12/2024
Special inspection requirement — Interior lighting power
ZHENHUAN XU
09/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
09/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
ZHENHUAN XU
09/12/2024
Special inspection requirement — Final
ZHENHUAN XU
09/12/2024
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
09/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
09/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ZHENHUAN XU
09/12/2024
Special inspection requirement — Air barrier - visual inspection
ZHENHUAN XU
09/12/2024
Special inspection requirement — Fenestration areas
ZHENHUAN XU
09/12/2024
Special inspection requirement — Fenestration air leakage
ZHENHUAN XU
04/08/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
04/26/2023
Signed off — Alteration
INTERIOR RENOVATION ON APT. 1FT AND 1RE AND 2FT OF AN EXIST'G 3 STORY RESIDENTIAL BUILDING. REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B08030433-I1
04/26/2023
Signed off — Alteration
INTERIOR RENOVATION ON APT. 1FT AND 1RE AND 2FT OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL,FLOOR DRAIN, REPLACE KITCHEN AND BATHROOM FIXTURE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08030434-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
04/23/2023
Special inspection requirement — Final
Robert Truskosky
04/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
04/23/2023
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
04/21/2023
Filed — Alteration
INTERIOR RENOVATION ON APT. 1FT AND 1RE AND 2FT OF AN EXIST'G 3 STORY RESIDENTIAL BUILDING. REPAIR/NEW PARTITION, DOOR, CEILING, FLOOR, PAINTING AS PER PLAN.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B08030433-P2
04/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/07/2023
Signed off — Alteration
INTERIOR RENOVATION ON APT. 1FT AND 1RE AND 2FT OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08033165-I1
03/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/28/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/23/2023
Filed — Alteration
INTERIOR RENOVATION ON APT. 1FT AND 1RE AND 2FT OF AN EXIST'G RESIDENTIAL BUILDING. INSTALL NEW COMBI. BOILER WITH TANKLESS COIL AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08033165-P2
03/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
03/23/2023
Special inspection requirement — Maintenance information
Robert Truskosky
03/23/2023
Special inspection requirement — Heating Systems
Robert Truskosky
03/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
03/21/2023
Violation issued (HPD, closed)
A
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAmerican Standard P&H Cororp09/19/2024
DOB NOWGeneral ConstructionSigned-offNY Building Associates09/18/2024
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp09/18/2024
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp11/10/2022
DOB NOWBoiler EquipmentSigned-offAmerican Standard P&H Cororp11/10/2022
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction11/09/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/04/2024Pass-Final Boiler Equipment InspectionPassView ↗
11/18/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
09/13/2024Heating SystemsZHENHUAN XUspecial
09/13/2024Tenant Protection Plan ComplianceZHENHUAN XUspecial
09/13/2024HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
09/13/2024HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
09/13/2024Maintenance informationZHENHUAN XUenergy_progress
09/13/2024HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
09/13/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
09/13/2024Tenant Protection Plan ComplianceZHENHUAN XUspecial
09/13/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
09/13/2024HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
09/13/2024HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
09/13/2024HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
09/12/2024Interior lighting powerZHENHUAN XUenergy_progress
09/12/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
09/12/2024Tenant Protection Plan ComplianceZHENHUAN XUspecial
09/12/2024FinalZHENHUAN XUprogress
09/12/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
09/12/2024Fire-Resistance Rated ConstructionZHENHUAN XUprogress
09/12/2024Fenestration and door U-factor and product ratingsZHENHUAN XUenergy_progress
09/12/2024Air barrier - visual inspectionZHENHUAN XUenergy_progress
09/12/2024Fenestration areasZHENHUAN XUenergy_progress
09/12/2024Fenestration air leakageZHENHUAN XUenergy_progress
04/23/2023Fire-Resistance Rated ConstructionRobert Truskoskyprogress
04/23/2023FinalRobert Truskoskyprogress
04/23/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
Latest 25 of 60.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/28/2026B08033165-P2Request digital key ↗
08/28/2026B08033165-P1Request digital key ↗
08/28/2026B08033165-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026B01110894-S2Open ↗
09/23/2026B08033165-I1Open ↗
09/02/2026B08030434-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026B08033165-P1Open ↗
08/28/2026B08033165-I1Open ↗
08/27/2026B08030434-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026B08033165-I1Open ↗
09/23/2026B01110894-S2Open ↗
09/23/2026B01110894-S2Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/28/2026B08033165-P1Open ↗
08/28/2026B08033165-I1Open ↗
08/27/2026B08030434-P1Open ↗
Showing 3 of 12 on file for this type