Multi-story retail building (2+)
1769 86TH STREET
BROOKLYN · Bath Beach · BIN 3165744
💬 Discuss this project
1929Year Built
2Stories
K2Building Class
R5Zoning
33,600 sfGross Floor Area
3Units
LL97 Covered10 Active Violations 9 unresolved · 1 paperwork only 1 likely answered 6 old, status unconfirmed ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: 1769 Brooklyn · 12,200 sf lot · 2.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof5 Below, SantanderUnder Construction12p · 6 filings · 20 docs
Floor 25 BelowUnder Construction26p · 5 filings · 20 docs
Floor 15 Below, Santander +1Under Construction30p · 7 filings · 20 docs
MezzanineUnder Construction4p · 1 filing · 6 docs
Cellar5 BelowUnder Construction29p · 4 filings · 20 docs
Site & exteriorTashkent Supermarket, Bukhari Community Center +1Under Construction13p · 9 filings · 20 docs
Filed — no permit issuedSign structure support and calculations1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
207 Meat2307/08/2026
1769 Brooklyn1307/08/2026
Santander503/21/2026
Sovereign Bank403/21/2026
Banco Santander303/22/2026
Independent Savings Bank103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/09/2021$18.0M—1769 LLC → 1769 Brooklyn$536/sf building
07/21/2017$10.7M—— → —$318/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSMR Designs703/21/2026
All in Permit Consultants403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Impact BuildersGeneral Contractor807/08/2026
Neptune Signs & AwningsSign hanger707/08/2026
Chandrabali RamanandGeneral Contractor507/08/2026
Perry Mechanical ContractingGeneral Contractor303/21/2026
Bruche Mechanical NYFire Protection207/08/2026
Plumbing P & HPlumbing207/08/2026
Corji ContractingGeneral Contractor206/28/2026
Global Luxury ServicesGeneral Contractor203/21/2026
A.M.A. HoldingsSign hanger207/08/2026
Gregg NY PlumbingPlumbing107/08/2026
Mega PlumbingFire Protection107/08/2026
John Evan ContractingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alpha Engineering3448605/12/2026
Savoy York Consulting97891005/12/2026
Amka & Associates8239203/07/2026
Daetel6931312/26/2025
WW Engineering7502107/21/2023
Obaid Mian849107/13/2020
Building Lifecycle
All (233)Filed (32)Permit Issued (28)Signed Off (5)Violation (60)Inspection (4)Objection (74)Special Inspection (30)
08/27/2026
Filed — Alteration CO
No work under this application all work performed under applications: B01014765,B00116042,B08025735,B08007449,B00952207,B01299323,B01299310,B00967794,B00904622,B00903800,B00990714,B00990244,B00990238,B00984111,B00990197,B00987120,B00985261,B01286067,B0109
B01337759-P1
08/03/2026
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS SIGN FOR BUKHARI COMMUNITY CENTER.
B01286067-I1
07/06/2026
Signed off — Alteration
New Heating Systems, Ventilation Systems, Air Conditioning Systems and Associated Ducts and Piping to accommodate Arch Plans.
B00903800-I1
06/22/2026
Signed off — Alteration
PAA is being filed to remove previously proposed bulkhead work. Bulkhead is no longer being proposed to be created.
B00967794-I1
05/29/2026
Permit issued — General Construction
B08007449-S1-GC
05/20/2026
Special inspection requirement — Sprinkler Systems
Wing Wong
05/20/2026
Special inspection requirement — Post-installed Anchors
FARID ISMAYILOV
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARID ISMAYILOV
05/12/2026
Filed — Alteration
Modification to Plumbing to accommodate Architectural Plans including but not limited to Bathrooms, wash sinks, Cooking Equipment for Kitchen. Modification of Existing Sprinkler System to relocate sprinkler heads in accordance with new Arch Layout
B00904622-P6
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARID ISMAYILOV
05/12/2026
Special inspection requirement — Sprinkler Systems
AHMED ISA
05/12/2026
Special inspection requirement — Post-installed Anchors
FARID ISMAYILOV
05/05/2026
Special inspection requirement — Mechanical Systems
FARID ISMAYILOV
05/05/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
FARID ISMAYILOV
05/05/2026
Special inspection requirement — Final
FARID ISMAYILOV
04/13/2026
Objection raised — Cost
04/02/2026
Filed — Alteration
New Heating Systems, Ventilation Systems, Air Conditioning Systems and Associated Ducts and Piping to accommodate Arch Plans.
B00903800-P2
04/02/2026
Filed — Alteration
Modification to Plumbing to accommodate Architectural Plans including but not limited to Bathrooms, wash sinks, Cooking Equipment for Kitchen. Modification of Existing Sprinkler System to relocate sprinkler heads in accordance with new Arch Layout
B00904622-P5
03/26/2026
Permit issued — Structural
B00967794-I1-ST
03/07/2026
Filed — Alteration
PAA is being filed to remove previously proposed bulkhead work. Bulkhead is no longer being proposed to be created.
B00967794-P1
03/05/2026
Special inspection requirement — Final
FARID ISMAYILOV
03/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
AHMAD KHANZADA
03/05/2026
Special inspection requirement — Structural Steel - High Strength Bolting
AHMAD KHANZADA
03/05/2026
Special inspection requirement — Structural Steel - Welding
AHMAD KHANZADA
03/05/2026
Special inspection requirement — Masonry
FARID ISMAYILOV
03/05/2026
Special inspection requirement — Structural Cold-Formed Steel
FARID ISMAYILOV
03/05/2026
Special inspection requirement — Structural Steel - Details
FARID ISMAYILOV
03/04/2026
Permit issued — General Construction
B01337759-I1-GC
03/02/2026
Filed — No Work
B01366441-I1
03/02/2026
Special inspection requirement — Public Assembly Emergency Lighting
FARID ISMAYILOV
02/20/2026
Objection resolved — Addressed
02/19/2026
Objection resolved — Addressed
02/19/2026
Special inspection requirement — Final
SALVATOR CARADONNA
02/18/2026
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS SIGN FOR BUKHARI COMMUNITY CENTER.
B01286067-P1
02/17/2026
Filed — Alteration
New Heating Systems, Ventilation Systems, Air Conditioning Systems and Associated Ducts and Piping to accommodate Arch Plans.
B00903800-P1
02/12/2026
Permit issued — Plumbing
B00904622-I1-EW-SP
02/12/2026
Special inspection requirement — Final
SALVATOR CARADONNA
02/03/2026
Objection resolved — Addressed
01/27/2026
Filed — Alteration
Modification to Plumbing to accommodate Architectural Plans including but not limited to Bathrooms, wash sinks, Cooking Equipment for Kitchen. Modification of Existing Sprinkler System to relocate sprinkler heads in accordance with new Arch Layout
B00904622-P4
01/27/2026
Special inspection requirement — Post-installed Anchors
FARID ISMAYILOV
01/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARID ISMAYILOV
01/27/2026
Special inspection requirement — Sprinkler Systems
AHMED ISA
01/23/2026
Permit issued — Mechanical Systems
B00903800-I1-MS
01/15/2026
Objection raised — Scope
01/15/2026
Objection resolved — Addressed
01/15/2026
Objection resolved — Addressed
01/11/2026
Objection resolved — Addressed
01/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/02/2026
Filed — Alteration
Modification to Plumbing to accommodate Architectural Plans including but not limited to Bathrooms, wash sinks, Cooking Equipment for Kitchen. Modification of Existing Sprinkler System to relocate sprinkler heads in accordance with new Arch Layout
B00904622-P3
12/30/2025
Objection raised — Zoning
12/30/2025
Objection resolved — Addressed
12/30/2025
Objection raised — Zoning
12/30/2025
Objection resolved — Addressed
12/30/2025
Objection raised — Zoning
12/30/2025
Objection raised — Zoning
12/30/2025
Objection raised — Zoning
12/30/2025
Objection raised — Structural
12/30/2025
Objection raised — Scope
12/26/2025
Filed — Alteration
Modification to Plumbing to accommodate Architectural Plans including but not limited to Bathrooms, wash sinks, Cooking Equipment for Kitchen. Modification of Existing Sprinkler System to relocate sprinkler heads in accordance with new Arch Layout
B00904622-P2
12/26/2025
Special inspection requirement — Final
Adam Kandil
Latest 60 of 233 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJohn Evan Contracting05/29/2026
DOB NOWStructuralSigned-offChandrabali Ramanand03/26/2026
DOB NOWGeneral ConstructionPermit IssuedChandrabali Ramanand03/04/2026
DOB NOWSprinklersSigned-offReal Plumbing02/12/2026
DOB NOWMechanical SystemsSigned-offChandrabali Ramanand01/23/2026
DOB NOWGeneral ConstructionPermit IssuedCorji Contracting11/12/2025
DOB NOWGeneral ConstructionPermit IssuedCorji Contracting11/12/2025
DOB NOWPlumbingPermit IssuedGregg NY Plumbing10/14/2025
DOB NOWSignSigned-offDesthers, Joseph10/06/2025
DOB NOWSignPermit IssuedDesthers, Joseph09/25/2025
DOB NOWSignPermit IssuedDesthers, Joseph09/25/2025
DOB NOWSignPermit IssuedDesthers, Joseph09/23/2025
DOB NOWSignPermit IssuedDesthers, Joseph08/28/2025
DOB NOWSignPermit IssuedDesthers, Joseph08/28/2025
DOB NOWSignPermit IssuedDesthers, Joseph08/28/2025
DOB NOWGeneral ConstructionPermit IssuedChandrabali Ramanand06/24/2025
DOB NOWPlumbingPermit IssuedPlumbing P & H02/05/2025
DOB NOWSprinklersSigned-offBruche Mechanical NY02/05/2025
DOB NOWSignPermit IssuedA.M.A. Holdings04/19/2024
DOB NOWSignPermit IssuedA.M.A. Holdings04/19/2024
DOB NOWGeneral ConstructionPermit IssuedImpact Builders01/17/2024
DOB NOWMechanical SystemsSigned-offImpact Builders01/17/2024
DOB NOWMechanical SystemsSigned-offImpact Builders09/28/2023
DOB NOWPlumbingPermit IssuedPlumbing P & H09/19/2023
DOB NOWSprinklersSigned-offBruche Mechanical NY09/19/2023
DOB NOWGeneral ConstructionPermit IssuedImpact Builders04/05/2023
DOB NOWGeneral ConstructionSigned-offGlobal Luxury Services10/13/2022
DOB NOWMechanical SystemsSigned-offPerry Mechanical Contracting07/17/2020
BISSPISSUEDSirina Fire Protection06/12/2017
BISPLISSUEDLab Plumbing & Heating Co06/05/2017
BISMHISSUEDVericon Construction Co05/31/2017
BISOTISSUEDVericon Construction Co05/31/2017
BISOTISSUEDVericon Construction Co05/31/2017
BISOTISSUEDVericon Construction Co05/25/2017
BISOTISSUEDVericon Construction Co05/25/2017
BISMHISSUEDVericon Construction Co05/25/2017
BISEQISSUEDVericon Construction Co05/24/2017
BIS—ISSUEDAmerican Sign & Electrical Con08/20/2013
BIS—ISSUEDAmerican Sign & Electrical Con08/20/2013
BIS—ISSUEDAmerican Sign & Electrical Con08/20/2013
+ 12 more permits on file
1 project · most recent 04/02/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/02/2026Signed-offChandrabali RamanandAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric PURY-EP120TNU-A1 <H> 120,000 BTU · Vrf Outdoor ×9
PURY -EP144TNU-A1 <H> 144,000 BTU · Vrf Outdoor ×6
PUHY-EP96TNU-A <H> 96,000 BTU · Vrf Outdoor ×3
PURY -EP120TNU-A1 <H> 120,000 BTU · Vrf Outdoor ×3
PURY -EP96TNU-A1 <H> 96,000 BTU · Vrf Outdoor ×3
PURY-EP144TNU-A1 <H> 144,000 BTU · Vrf Outdoor ×3
PURY-EP96TNU-A1 <H> 96,000 BTU · Vrf Outdoor ×3
Heat / Cool
Mitsubishi Electric PEFY-P96NMHU-E-OA 57,000 BTU · Vrf Indoor ×3
Ventilation
Canarm BI-24RM 8,800 CFM · Exhaust Fan ×6
BI-22RM 8,200 CFM ×3
BI-36RM 22,900 CFM · Exhaust Fan ×3
Solar & Palau SQB42 22,545 CFM · Makeup Air ×3
1 project · most recent 05/12/2026
FiledStatusContractorScope
05/12/2026Signed-offReal Plumbing2,896 heads
1 project · most recent 05/12/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
05/12/2026Permit IssuedGregg NY PlumbingGas, Plumbing-Sprinkler, Water/Sanitary
6 projects · most recent 02/03/2026
General Wiring
FiledStatusContractorScope
02/03/2026Permit IssuedKwong Ming Electric—
01/27/2026CancelledKwong Ming Electric—
12/26/2025Permit IssuedProff Electrical—
10/06/2025Permit IssuedW 8 ElectricGeneral Wiring
10/21/2022Permit IssuedBruni ElectricGeneral Wiring
01/05/2019CompleteKwong Ming ElectricGeneral Wiring
1 project · most recent 03/07/2026
Steel Concrete Masonry
FiledStatusContractorScope
03/07/2026Signed-offChandrabali RamanandSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/20/2026Sprinkler SystemsWing Wongspecial
05/20/2026Post-installed AnchorsFARID ISMAYILOVspecial
05/20/2026Fire-Resistant Penetrations and JointsFARID ISMAYILOVspecial
05/12/2026Fire-Resistant Penetrations and JointsFARID ISMAYILOVspecial
05/12/2026Sprinkler SystemsAHMED ISAspecial
05/12/2026Post-installed AnchorsFARID ISMAYILOVspecial
05/05/2026Mechanical SystemsFARID ISMAYILOVspecial
05/05/2026Exhaust and Vent Systems in Plenums and DuctsFARID ISMAYILOVspecial
05/05/2026FinalFARID ISMAYILOVprogress
03/05/2026FinalFARID ISMAYILOVprogress
03/05/2026Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
03/05/2026Structural Steel - High Strength BoltingAHMAD KHANZADAspecial
03/05/2026Structural Steel - WeldingAHMAD KHANZADAspecial
03/05/2026MasonryFARID ISMAYILOVspecial
03/05/2026Structural Cold-Formed SteelFARID ISMAYILOVspecial
03/05/2026Structural Steel - DetailsFARID ISMAYILOVspecial
03/02/2026Public Assembly Emergency LightingFARID ISMAYILOVprogress
02/19/2026FinalSALVATOR CARADONNAprogress
02/12/2026FinalSALVATOR CARADONNAprogress
01/27/2026Post-installed AnchorsFARID ISMAYILOVspecial
01/27/2026Fire-Resistant Penetrations and JointsFARID ISMAYILOVspecial
01/27/2026Sprinkler SystemsAHMED ISAspecial
12/26/2025FinalAdam Kandilprogress
12/19/2025FinalAdam Kandilprogress
12/17/2025Fire-Resistant Penetrations and JointsAdam Kandilspecial
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Tashkent SupermarketRetailFloor 1
Project B01299310 Alteration · Permit Entire · 11/06/2025
Project B01299323 Alteration · Permit Entire · 11/06/2025
Project B00990197 Alteration · Permit Entire · 06/19/2024
Project B00990238 Alteration · Permit Entire · 06/19/2024
Project B00990244 Alteration · Permit Entire · 06/19/2024
Project B00984111 Alteration · Permit Entire · 02/01/2024
Project B00952207 Alteration · Approved · 12/02/2023
Bukhari Community CenterCommunity FacilityFloor 1
Project B01286067 Alteration · LOC Issued · 10/01/2025
207 MeatRetail—
Project B00985261 Alteration · Permit Entire · 02/01/2024
5 BelowRetailCellar, Floors 1, 2
Project B00903800 Alteration · LOC Issued · 07/24/2023
Project B00904622 Alteration · Permit Entire · 07/21/2023
SantanderBank / Financial branchFloor 1, Roof
Project B00366341 Alteration · LOC Issued · 07/13/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 304 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch27
08/27/2026B08007449-S1Request digital key ↗
08/27/2026B08007449-I1Request digital key ↗
08/27/2026B08007449-P1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/18/2026B01366441-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/14/2026B00840484-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00366341-I1Request digital key ↗
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION22
02/19/2026321983154Open ↗
01/27/2026320492659Open ↗
09/11/2019321983154Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION18
06/30/2017321572240Open ↗
06/13/2017321564623Open ↗
06/02/2017321564623Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK &amp; PERMITS - SUPPPORTING DOCUMENTATION2
12/28/2018321572222Open ↗
05/11/2018321572222Open ↗
▸Seals & Professional Certifications113
▸DOB NOWDPL-1: Design Professional Seal & Signature32
10/04/2026B01337759-I1Open ↗
10/04/2026B01337759-P1Open ↗
08/27/2026B08007449-S1Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
11/15/2019321564623Open ↗
11/15/2019321572240Open ↗
11/15/2019321572240Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/01/2026B00903800-I1Open ↗
09/01/2026B00903800-I1Open ↗
08/31/2026B00904622-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
05/25/2017321564623Open ↗
05/11/2017321572240Open ↗
06/11/2014320611218Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B00903800-I1Open ↗
09/01/2026B01286067-I1Open ↗
08/29/2026B01299310-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
08/30/2013320828440Open ↗
08/30/2013320828431Open ↗
08/28/2013320828459Open ↗
Showing 3 of 8 on file for this type
▸BISProfessional and Owner Certification (POC3)2
05/23/2017321564623Open ↗
05/23/2017321564623Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/23/2017321564623Open ↗
05/11/2017321572240Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING3
10/03/2012320611218Open ↗
08/22/2012320611218Open ↗
06/14/2012320492659Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
12/01/2012320611218Open ↗
10/22/2012320611218Open ↗
10/19/2012320611218Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/23/2017321564623Open ↗
05/11/2017321572240Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
09/11/2019321983154Open ↗
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
10/04/2026B01337759-I1Open ↗
10/04/2026B01337759-P1Open ↗
08/27/2026B08007449-S1Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
09/11/2019321983154Open ↗
05/23/2017321564623Open ↗
05/15/2017321572222Open ↗
Showing 3 of 11 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
11/21/2019321564623Open ↗
11/21/2019321564623Open ↗
09/11/2019321983154Open ↗
Showing 3 of 9 on file for this type
▸BISEN2 - As Built Energy Analysis2
12/08/2012320519113Open ↗
11/21/2019321564623Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/08/2012320519113Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026B00903800-I1Open ↗
▸Approvals, Objections & Sign-offs23
▸BISADMINISTRATIVE OBJECTIONS9
08/30/2013320828440Open ↗
08/30/2013320828431Open ↗
08/28/2013320828459Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST7
07/02/2014320828468Open ↗
07/02/2014320828440Open ↗
07/02/2014320828459Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
08/30/2013320828431Open ↗
08/30/2013320828431Open ↗
12/08/2012320619201Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
09/11/2019321983154Open ↗
06/14/2012320492659Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT19
11/21/2019321564623Open ↗
09/11/2019321983154Open ↗
05/23/2017321564623Open ↗
Showing 3 of 19 on file for this type
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET15
09/11/2019321983154Open ↗
05/23/2017321564623Open ↗
05/23/2017321564623Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION4
12/26/2017321564623Open ↗
01/05/2015320611218Open ↗
06/11/2014320611218Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
11/21/2019321564623Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
10/04/2026B01337759-I1Open ↗
10/04/2026B01337759-P1Open ↗
▸BISPLOT DIAGRAM1
06/14/2012320492659Open ↗