← Back
Elevator apt, fireproof with stores
1769 CONEY ISLAND AVENUE
BROOKLYN · Midwood · BIN 3429339
💬 Discuss this project
2022Year Built
8Stories
D6Building Class
R7AZoning
70,775 sfGross Floor Area
76Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 1775 CONEY ISLAND LLC · 15,000 sf lot · 4.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Floor 33p · 1 filing
Floor 2
Floor 12 filings
Site & exterior6 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1730 OCEAN AVENUE DEVELOPMENT7007/08/2026
OWNERS REP1707/08/2026
1775 CONEY ISLAND803/22/2026
MAJOR ELEVATOR CORP.103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/17/2020$4.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC812/01/2023
LMW ENGINEERING GROUP LLC310/31/2023
STUDIO GALLOS410/23/2023
PAUL PERDEK, PROF. ENG. PLLC1110/20/2022
HIGH POINT ENGINEERING109/22/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION2203/21/2026
LEVIN ENGINEERING PLLC1603/21/2026
RICHARD WAINER ARCHITECT, PLLC1403/21/2026
HIGH POINT ENGINEERING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JACOBS DEVELOPMENT CORPORATIONGeneral Contractor3207/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1407/08/2026
ROM PIPING & HEATING INCFire Protection607/08/2026
STUDIO GALLOSGeneral Contractor203/22/2026
ROM PIPING & HTG INCPlumbing207/08/2026
SHAI SHICLYElectrical203/21/2026
CITY ELECTRIC LLC 005198General Contractor203/22/2026
R.C.M. ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941712/01/2023
LEO Y LEE ASSOCIATES2481109/16/2022
Building Lifecycle
All (221)Filed (27)Permit Issued (30)Signed Off (14)Violation (30)Inspection (17)Objection (76)Special Inspection (27)
05/11/2026
Violation issued (HPD, closed)
A
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
09/27/2024
Signed off — Alteration
B00496341-S1
09/26/2024
Signed off — Alteration
B00496341-I1
08/12/2024
Signed off — Alteration
HOOD AND DUCT WORK IN THE 1ST FLOOR KITCHEN WORKING WITH COMMERICAL COOKING EQUIPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00535343-I1
08/09/2024
Signed off — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #340802073. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00535837-I1
08/07/2024
Signed off — Alteration
B00444667-I1
06/27/2024
Signed off — Alteration
B08004407-I1
12/04/2023
Objection raised — Scope
12/04/2023
Objection resolved — Addressed
12/01/2023
Filed — Alteration
HOOD AND DUCT WORK IN THE 1ST FLOOR KITCHEN WORKING WITH COMMERICAL COOKING EQUIPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00535343-P2
11/22/2023
Special inspection requirement — Duct leakage testing, insulation and design
Paul Raymond
11/22/2023
Special inspection requirement — Shutoff dampers
Paul Raymond
11/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
11/22/2023
Special inspection requirement — Heating Systems
Paul Raymond
11/22/2023
Special inspection requirement — Mechanical Systems
Paul Raymond
11/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
11/22/2023
Special inspection requirement — Final
Paul Raymond
11/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
11/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
11/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
11/22/2023
Special inspection requirement — Maintenance information
Paul Raymond
11/21/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Paul Raymond
11/21/2023
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
11/21/2023
Special inspection requirement — Footing and Foundation
Paul Raymond
11/21/2023
Special inspection requirement — Final
Paul Raymond
11/21/2023
Special inspection requirement — Structural Cold-Formed Steel
Paul Raymond
11/21/2023
Special inspection requirement — Post-installed Anchors
Paul Raymond
11/21/2023
Special inspection requirement — Subgrade Inspections
Paul Raymond
11/20/2023
Signed off — Alteration
B00566395-I1
11/20/2023
Signed off — Alteration
B00566393-I1
11/13/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/31/2023
Filed — Alteration
B00496341-P1
10/25/2023
Permit issued — Curb Cut
B00566395-I1-CC
10/25/2023
Permit issued — Curb Cut
B00566393-I1-CC
10/23/2023
Filed — Alteration
B00566395-P1
10/23/2023
Signed off — Alteration
INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #340802073. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00536712-I1
10/17/2023
Signed off — Alteration
B00586514-I1
10/10/2023
Objection resolved — Addressed
10/10/2023
Objection resolved — Addressed
10/10/2023
Objection resolved — Addressed
10/05/2023
Objection resolved — Addressed
10/04/2023
Objection raised — Scope
10/04/2023
Objection raised — Fire_Protection
10/04/2023
Objection raised — Inspections
10/04/2023
Objection raised — Scope
10/03/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
09/29/2023
Filed — Alteration
HOOD AND DUCT WORK IN THE 1ST FLOOR KITCHEN WORKING WITH COMMERICAL COOKING EQUIPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00535343-P1
09/29/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
09/29/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/13/2023
Objection raised — Inspections
09/13/2023
Objection resolved — Addressed
09/13/2023
Objection raised — Structural
09/13/2023
Objection resolved — Addressed
09/12/2023
Permit issued — Construction Fence
B00444667-I1-FN
09/11/2023
Filed — Alteration
INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #340802073. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00536712-P1
Latest 60 of 221 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJACOBS DEVELOPMENT CORPOR10/25/2023
DOB NOWCurb CutSigned-offJACOBS DEVELOPMENT CORPOR10/25/2023
DOB NOWConstruction FenceSigned-offJACOBS DEVELOPMENT CORPOR09/12/2023
DOB NOWPlumbingSigned-offROM PIPING & HTG INC07/24/2023
DOB NOWStandpipeSigned-offROM PIPING & HEATING INC04/08/2023
DOB NOWStandpipeSigned-offROM PIPING & HEATING INC04/08/2023
DOB NOWSprinklersSigned-offROM PIPING & HEATING INC04/08/2023
DOB NOWMechanical SystemsSigned-offJACOBS DEVELOPMENT CORPOR03/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offJACOBS DEVELOPMENT CORPOR11/10/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC11/09/2022
DOB NOWProtection and Mechanical MethodsSigned-offJACOBS DEVELOPMENT CORPOR10/27/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/11/2022
DOB NOWConstruction FenceSigned-offJACOBS DEVELOPMENT CORPOR09/12/2022
DOB NOWSupport of ExcavationSigned-offJACOBS DEVELOPMENT CORPOR05/11/2022
DOB NOWMechanical SystemsSigned-offJACOBS DEVELOPMENT CORPOR03/29/2022
DOB NOWPlumbingSigned-offROM PIPING & HTG INC03/17/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/14/2022
DOB NOWGeneral ConstructionSigned-offJACOBS DEVELOPMENT CORPOR02/24/2022
DOB NOWEarth WorkSigned-offJACOBS DEVELOPMENT CORPOR02/24/2022
DOB NOWStructuralSigned-offJACOBS DEVELOPMENT CORPOR02/24/2022
DOB NOWGeneral ConstructionSigned-offJACOBS DEVELOPMENT CORPOR02/24/2022
DOB NOWStandpipeSigned-offROM PIPING & HEATING INC02/20/2022
DOB NOWStandpipeSigned-offROM PIPING & HEATING INC02/18/2022
DOB NOWStandpipeSigned-offROM PIPING & HEATING INC02/18/2022
DOB NOWConstruction FenceSigned-offJACOBS DEVELOPMENT CORPOR02/09/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC11/12/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/13/2021
DOB NOWConstruction FenceSigned-offJACOBS DEVELOPMENT CORPOR10/13/2021
DOB NOWConstruction FenceSigned-offJACOBS DEVELOPMENT CORPOR02/02/2021
BIS—ISSUEDJACOBS DEVELOPMENT CORPORATION09/12/2023
BIS—ISSUEDJACOBS DEVELOPMENT CORPORATION12/13/2022
BIS—ISSUEDJACOBS DEVELOPMENT CORPORATION11/08/2022
BIS—ISSUEDJACOBS DEVELOPMENT CORPORATION09/09/2022
BIS—ISSUEDJACOBS DEVELOPMENT CORPORATION03/03/2022
BIS—ISSUEDMICHELLE KUO CORP03/11/2014
BISEQISSUEDMICHELLE KUO CORP03/11/2014
BISEQISSUEDMICHELLE KUO CORP01/03/2014
BISPLISSUEDBARGAIN PLUMBING INC01/02/2014
BIS—ISSUEDMICHELLE KUO CORP12/24/2013
+ 4 more permits on file
7 projects · most recent 08/18/2023
General Wiring
FiledStatusContractorScope
08/18/2023CompleteCITY ELECTRIC LLCGeneral Wiring
01/04/2023CompleteEMPIRE STATE ELECTL CORPGeneral Wiring
09/16/2022CompleteR.C.M. ELECTRIC CORP.—
07/12/2022CompleteSOLAS ELECTRICAL CORP—
07/08/2022CompleteEMPIRE STATE ELECTL CORP—
10/07/2021CompleteV. VASS ELECTRIC CORP—
09/23/2021CompleteA.L. ELECTRICAL CORP.1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
11/13/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/03/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
09/29/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
09/29/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/18/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
08/15/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/23/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/08/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/01/2022Pass-Final PL - UndergroundPassView ↗
05/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
11/22/2023Duct leakage testing, insulation and designPaul Raymondenergy_progress
11/22/2023Shutoff dampersPaul Raymondenergy_progress
11/22/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
11/22/2023Heating SystemsPaul Raymondspecial
11/22/2023Mechanical SystemsPaul Raymondspecial
11/22/2023Energy Code Compliance InspectionsPaul Raymondprogress
11/22/2023FinalPaul Raymondprogress
11/22/2023HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
11/22/2023HVAC-R and service water heating equipmentPaul Raymondenergy_progress
11/22/2023HVAC-R and service water heating system controlsPaul Raymondenergy_progress
11/22/2023Maintenance informationPaul Raymondenergy_progress
11/21/2023Excavations - Sheeting, Shoring, and BracingPaul Raymondspecial
11/21/2023Concrete - Cast-In-PlacePaul Raymondspecial
11/21/2023Footing and FoundationPaul Raymondprogress
11/21/2023FinalPaul Raymondprogress
11/21/2023Structural Cold-Formed SteelPaul Raymondspecial
11/21/2023Post-installed AnchorsPaul Raymondspecial
11/21/2023Subgrade InspectionsPaul Raymondspecial
09/08/2023Sprinkler SystemsPaul Raymondspecial
09/08/2023Standpipe SystemsPaul Raymondspecial
09/15/2022Post-installed AnchorsPaul Raymondspecial
09/15/2022Structural Stability – Alterations of existing buildingsPaul Raymondspecial
09/02/2022Structural Stability – Alterations of existing buildingsPaul Raymondspecial
09/02/2022Post-installed AnchorsPaul Raymondspecial
08/22/2022Post-installed AnchorsPaul Raymondspecial
Latest 25 of 27.
▾Documents — 259 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch25
09/01/2026B00535343-P1Request digital key ↗
09/01/2026B00535837-P1Request digital key ↗
09/01/2026B00586514-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00401600-I1Request digital key ↗
09/02/2026B00444667-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION20
11/19/2024340802073Open ↗
04/10/2024300618455Open ↗
04/10/2024340109858Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION4
12/15/2022340802073Open ↗
12/07/2022340802073Open ↗
03/03/2022340802073Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Stormwater Construction Permit2
09/01/2026B00535837-P1Open ↗
08/15/2026B00535837-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/05/2023340802073Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00496341-P1Open ↗
08/13/2026B00496341-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00496341-I1Open ↗
08/13/2026B00496341-P1Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/03/2024340802073Open ↗
▸BISPD-1 WITH TOPO STAMP1
02/10/2022340802073Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/03/2021340802073Open ↗
▸BISVERIFY TAX LOT1
10/28/2023340802073Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
10/28/2023340802073Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/28/2023340802073Open ↗
▸BISZONING DIAGRAM1
02/07/2022340802073Open ↗
▸Seals & Professional Certifications60
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/02/2026B00401600-I1Open ↗
09/02/2026B00444667-I1Open ↗
09/01/2026B00536712-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
08/31/2026B00650336-P1Open ↗
08/31/2026B00650336-P1Open ↗
08/29/2026B00496341-S1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026B00535343-P2Open ↗
08/28/2026B00535343-P2Open ↗
08/28/2026B00535343-P2Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/11/2021340818413Open ↗
01/20/2021340802073Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/11/2021340818413Open ↗
01/03/2014340109858Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/03/2014340109858Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/03/2014340109858Open ↗
▸Trade Schedules & Equipment10
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00496341-I1Open ↗
08/13/2026B00496341-P1Open ↗
▸BISHEATING SYSTEMS1
10/28/2023340802073Open ↗
▸BISSTANDPIPE WORK PERMIT1
02/23/2022340802073Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
10/28/2023340802073Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
01/21/2024340802073Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/28/2023340802073Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
08/16/2021340802073Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/22/2024340802073Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
02/22/2024340802073Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
11/15/2023340818413Open ↗
01/20/2021340802073Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/23/2022340802073Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/04/2022340802073Open ↗
▸Environmental & Asbestos16
▸DOB NOWOER: Notice to Proceed9
09/01/2026B00535343-P1Open ↗
09/01/2026B00535837-P1Open ↗
08/15/2026B00535343-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/15/2026B00535343-I1Open ↗
08/15/2026B00535837-I1Open ↗
08/13/2026B00496341-S1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
02/01/2022340802073Open ↗
08/11/2021340818413Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
08/06/2024340802073Open ↗
▸Energy Compliance17
▸DOB NOWEN2: As Built Energy Analysis.4
08/15/2026B00535343-I1Open ↗
08/15/2026B00535343-I1Open ↗
08/15/2026B00535837-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/23/2022340802073Open ↗
08/04/2021340802073Open ↗
01/03/2014340109858Open ↗
▸BISFENESTRATION AIR LEAKAGE1
10/28/2023340802073Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/28/2023340802073Open ↗
▸BISINTERIOR LIGHTING POWER1
10/28/2023340802073Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/23/2022340802073Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/28/2023340802073Open ↗
▸BISFENESTRATION AREAS1
10/28/2023340802073Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
11/01/2023340802073Open ↗
▸BISNYCECC ANALYSIS1
01/03/2014340109858Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/28/2023340802073Open ↗
▸BISLIGHTING IN DWELLING UNITS1
10/28/2023340802073Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
02/23/2022340802073Open ↗
02/01/2022340802073Open ↗
08/09/2021340802073Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
10/28/2023340802073Open ↗
02/23/2022340802073Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
10/28/2023340802073Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/28/2023340802073Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/28/2023340802073Open ↗
▸BIS2008 CODE TR1 REQUIRED1
01/03/2014340109858Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026B00496341-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE9
03/28/2024340802073Open ↗
10/03/2023340802073Open ↗
07/14/2023340802073Open ↗
Showing 3 of 9 on file for this type
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE2
12/15/2022340802073Open ↗
02/23/2022340802073Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
12/07/2022340802073Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00496341-I1Open ↗
▸DOB NOWHIC License or Affidavit1
08/15/2026B00535343-I1Open ↗
▸DOB NOWCertificate of Insurance Document1
08/15/2026B00535343-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00496341-I1Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION6
03/19/2024340802073Open ↗
03/19/2024340802073Open ↗
03/19/2024340802073Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/11/2021340818413Open ↗
01/20/2021340802073Open ↗
01/03/2014340109858Open ↗
▸BISBOROUGH INTAKE FORM1
12/07/2022340802073Open ↗
▸Other Documents21
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/09/2024340818413Open ↗
08/11/2021340818413Open ↗
08/09/2021340802073Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B00496341-I1Open ↗
08/13/2026B00496341-P1Open ↗
08/13/2026B00496341-S1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00496341-I1Open ↗
08/13/2026B00496341-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00496341-P1Open ↗
08/13/2026B00496341-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00496341-I1Open ↗
08/13/2026B00496341-S1Open ↗
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
10/28/2023340802073Open ↗
▸BISSHUTOFF DAMPERS1
10/28/2023340802073Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/28/2021340802073Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
10/28/2023340802073Open ↗
▸BISVESTIBULES1
10/28/2023340802073Open ↗
▸BISMAINTENANCE INFORMATION1
10/28/2023340802073Open ↗
▸BISPERMANENT CERTIFICATE1
10/28/2023340802073Open ↗
▸BISTCO - Supporting Documents1
03/19/2024340802073Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00496341-I1Open ↗