← Back
QUEENS
177-14 144 DRIVE
QUEENS · BIN 4625424
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATARI REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS101/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.103/21/2026
GERALD J CALIENDO R A A I A103/21/2026
Building Lifecycle
All (31)Filed (1)Objection (6)Special Inspection (24)
09/18/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
02/04/2025
Objection raised — Structural
02/04/2025
Objection raised — Zoning
02/04/2025
Objection raised — Zoning
01/17/2025
Filed — New Building
NEW TWO (2) STORY TWO (2) FAMILY DETACHED DWELLING.
Q01168563-I1
01/17/2025
Special inspection requirement — Concrete - Cast-In-Place
01/17/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
01/17/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
01/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/17/2025
Special inspection requirement — Masonry
01/17/2025
Special inspection requirement — Subgrade Inspections
01/17/2025
Special inspection requirement — Mechanical Systems
01/17/2025
Special inspection requirement — Final
01/17/2025
Special inspection requirement — Permanent certificate
01/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
01/17/2025
Special inspection requirement — Insulation placement and R values
01/17/2025
Special inspection requirement — Protection of exposed foundation insulation
01/17/2025
Special inspection requirement — Electric vehicle service equipment requirements
01/17/2025
Special inspection requirement — Ventilation and air distribution system
01/17/2025
Special inspection requirement — Interior lighting power
01/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
01/17/2025
Special inspection requirement — Fenestration air leakage
01/17/2025
Special inspection requirement — Air barrier — testing
01/17/2025
Special inspection requirement — Maintenance information
01/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
01/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
01/17/2025
Special inspection requirement — Fenestration areas
01/17/2025
Special inspection requirement — Air barrier - visual inspection
01/17/2025
Special inspection requirement — Metering
Nothing on file for this building.
1 project · most recent 01/17/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/17/2025——Air Conditioning Systems, Ventilation Systems
Cooling
Gree SKU MULTI42HP230V1EO MULTI18HP230V1EO MULTI36HP230V1CO 42,000 BTU · Heat Pump Outdoor ×3
Heating
Gree SKU MULTI42HP230V1EO 42,000 BTU · Split System ×3
Ventilation
Gree SKU MULTI42HP230V1EO 42,000 BTU · Heat Pump Outdoor ×3
1 project · most recent 01/17/2025
Fence
FiledStatusContractorScope
01/17/2025——Fence
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
01/17/2025Concrete - Cast-In-Place—special
01/17/2025Excavations - Sheeting, Shoring, and Bracing—special
01/17/2025Exterior Insulation and Finish Systems (EIFS)—special
01/17/2025Fire-Resistant Penetrations and Joints—special
01/17/2025Masonry—special
01/17/2025Subgrade Inspections—special
01/17/2025Mechanical Systems—special
01/17/2025Final—progress
01/17/2025Permanent certificate—energy_progress
01/17/2025HVAC-R and service water piping design and insulation—energy_progress
01/17/2025Insulation placement and R values—energy_progress
01/17/2025Protection of exposed foundation insulation—energy_progress
01/17/2025Electric vehicle service equipment requirements—energy_progress
01/17/2025Ventilation and air distribution system—energy_progress
01/17/2025Interior lighting power—energy_progress
01/17/2025HVAC-R and service water heating equipment—energy_progress
01/17/2025Fenestration air leakage—energy_progress
01/17/2025Air barrier — testing —energy_progress
01/17/2025Maintenance information—energy_progress
01/17/2025HVAC-R and service water heating system controls—energy_progress
01/17/2025Fenestration and door U-factor and product ratings—energy_progress
01/17/2025Fenestration areas—energy_progress
01/17/2025Air barrier - visual inspection—energy_progress
01/17/2025Metering—energy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01168563-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01168563-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01168563-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01168563-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01168563-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01168563-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/21/2026Q01168563-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01168563-I1Open ↗