← Back
Two family converted from one family
177-33 145 DRIVE
QUEENS · BIN 4285294
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R3-2Zoning
2,382 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.6 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Floor 24p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NCR CONSTRUCTION1607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/26/2024$1.2M—— → —$525/sf building
01/17/2023$510K—Private party → FOUR STAR DEVELOPMENT, INC.$214/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES201/10/2024
TABRIZ DESIGN GROUP209/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ DESIGN GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NCR CONSTRUCTION INCGeneral Contractor707/08/2026
METROPOLITAN ELEC OF NY IElectrical103/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252201/10/2024
TABRIZ GROUP ENTERPRISES3275301/10/2024
TRIANGLE INSPECTION & TES7495109/22/2023
Building Lifecycle
All (48)Filed (4)Permit Issued (4)Signed Off (2)Inspection (6)Objection (2)Special Inspection (30)
07/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/22/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT 1 APP # Q00845556. (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q00846935-I1
02/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/22/2024
Objection raised — Scope
01/22/2024
Objection resolved — Addressed
01/10/2024
Signed off — Alteration
TEMPORARY PLYWOOD CONSTRUCTION FENCE TO SECURE SITE FOR FUTURE CONSTRUCTION.
Q00816253-I1
01/10/2024
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO-FAMILY.
Q00845556-P1
12/05/2023
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
INDARDEO PARBHUNATH
12/05/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Mechanical Systems
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Subgrade Inspections
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/05/2023
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Final
HARI SONI
12/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Structural Wood Frame
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Duct leakage testing, insulation and design
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
12/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
BAKHTIAR SHAMLOO
10/10/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/10/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/10/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/27/2023
Permit issued — Plumbing
Q00846935-I1-PL
09/22/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT 1 APP # Q00845556. (The 3-fixture bathroom statement is mentioned in the comment section of the Certificate of Occupancy as BB 2011-10 part (C. Filing)(b))
Q00846935-I1
09/22/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
07/19/2023
Permit issued — Foundation
Q00845556-I1-GC-CX
04/21/2023
Permit issued — Construction Fence
Q00816253-I1-FN
03/21/2023
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO-FAMILY.
Q00845556-I1
01/26/2023
Permit issued — Construction Fence
Q00816253-I1-FN
01/23/2023
Filed — Alteration
TEMPORARY PLYWOOD CONSTRUCTION FENCE TO SECURE SITE FOR FUTURE CONSTRUCTION.
Q00816253-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR09/27/2023
DOB NOWFoundationPermit IssuedNCR CONSTRUCTION INC07/19/2023
DOB NOWConstruction FenceSigned-offNCR CONSTRUCTION INC04/21/2023
DOB NOWConstruction FenceSigned-offNCR CONSTRUCTION INC01/26/2023
1 project · most recent 01/10/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/10/2024Permit IssuedNCR CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Cooling
Comfort Aire RSG1448S1P, GUH955A 60,000 BTU · Furnace ×4
Ventilation
Delta Breeze DELTA BREEZ MODEL # SLM70 70 CFM · Exhaust Fan ×5
Glacier GLACIER MODEL # BCSQ130SS 300 CFM · Kitchen Exhaust ×2
1 project · most recent 09/22/2023
General Wiring
FiledStatusContractorScope
09/22/2023CompleteMETROPOLITAN ELEC OF NY IGeneral Wiring
1 project · most recent 01/10/2024
FiledStatusContractorScope
01/10/2024Permit IssuedNCR CONSTRUCTION INC1 scope_items
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/10/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/10/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
12/05/2023Permanent certificateBAKHTIAR SHAMLOOenergy_progress
12/05/2023Maintenance informationBAKHTIAR SHAMLOOenergy_progress
12/05/2023MeteringBAKHTIAR SHAMLOOenergy_progress
12/05/2023Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
12/05/2023Construction Operations Influencing Adjacent StructuresINDARDEO PARBHUNATHspecial
12/05/2023Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
12/05/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
12/05/2023MasonryBAKHTIAR SHAMLOOspecial
12/05/2023Mechanical SystemsBAKHTIAR SHAMLOOspecial
12/05/2023Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
12/05/2023Subgrade InspectionsBAKHTIAR SHAMLOOspecial
12/05/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/05/2023Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
12/05/2023FinalHARI SONIprogress
12/05/2023Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
12/05/2023Footing and FoundationBAKHTIAR SHAMLOOprogress
12/05/2023Structural Wood FrameBAKHTIAR SHAMLOOprogress
12/05/2023Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
12/05/2023Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
12/05/2023HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
12/05/2023Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
12/05/2023Fenestration areasBAKHTIAR SHAMLOOenergy_progress
12/05/2023Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
12/05/2023Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
12/05/2023Duct leakage testing, insulation and designBAKHTIAR SHAMLOOenergy_progress
Latest 25 of 31.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026Q00816253-I1Request digital key ↗
08/25/2026Q00845556-I1Request digital key ↗
08/24/2026Q00846935-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00845556-P1Open ↗
08/13/2026Q00845556-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00845556-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q00846935-I1Open ↗
09/01/2026Q00846935-I1Open ↗
08/25/2026Q00845556-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026Q00845556-P1Open ↗
08/25/2026Q00845556-I1Open ↗
08/24/2026Q00846935-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q00845556-P1Open ↗
08/25/2026Q00845556-P1Open ↗
08/25/2026Q00845556-P1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00845556-I1Open ↗
08/13/2026Q00845556-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026Q00845556-I1Open ↗
08/24/2026Q00846935-I1Open ↗
08/15/2026Q00845556-P1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q00845556-I1Open ↗
08/13/2026Q00845556-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00845556-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/13/2026Q00845556-I1Open ↗
08/13/2026Q00845556-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00845556-P1Open ↗
08/13/2026Q00845556-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00845556-I1Open ↗
08/13/2026Q00845556-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/25/2026Q00845556-I1Open ↗
08/15/2026Q00845556-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00845556-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00845556-I1Open ↗