BuildNYC
Office with commercial, 1-6 stories
177 EAST 87TH STREET
MANHATTAN · BIN 1048053
💬 Discuss this project
1915Year Built
6Stories
O5Building Class
C1-9Zoning
67,500 sfGross Floor Area
38Units
LL97 Covered0 Active Violations
Office with commercial, 1-6 stories · 12,659 sf lot · 5.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSchweiger Dermatology Group, Collina Italiano14p · 5 filings · 20 docs
Floor 6Collina Italiano5p · 2 filings · 10 docs
Floor 5Muss Development LLC4p · 1 filing · 7 docs
Floor 4Muss Development LLC1p · 1 filing · 5 docs
Floor 3Schweiger Dermatology Group, Professional P.T.90p · 3 filings · 20 docs
Floor 2Vivo Infusion, Three Off the Tee +1Under Construction25p · 6 filings · 20 docs
Floor 1Barnes & Noble54p · 6 filings · 20 docs
BasementBarnes & Noble3p · 1 filing · 20 docs
Sub-BasementBarnes & Noble42p · 4 filings · 20 docs
Site & exteriorBarnes & Noble, BARNES&NObLE BOOKSELLE! +14p · 5 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Muss Development6010/13/2026
Allied Third Avenue4303/22/2026
Victorian Properties1303/21/2026
Muss Devl103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SKY Management Group203/21/2026
Goin Fastrack103/21/2026
Concept Design Group803/21/2026
Frank Petrusora Aol Company403/21/2026
Burnham Nationwide1003/21/2026
Green Light Expediting1203/21/2026
New York Sign Consultants603/21/2026
Synergy Building Consultants103/21/2026
Garo Gumusyan303/21/2026
Expediting103/21/2026
Building Brothers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sova ConstructionGeneral Contractor1407/08/2026
Accubuild ConstructionGeneral Contractor403/21/2026
Melville Heating & Air CondGeneral Contractor303/21/2026
Mauceri Sign CoSign hanger307/08/2026
Frankie Plumbing & HeatingPlumbing207/08/2026
Tanachion Electrical Cont'g IElectrical203/21/2026
Maxwell Plumbing MechanicalPlumbing207/08/2026
Rosenwach Tank CoGeneral Contractor203/21/2026
Wesbuilt Construction ManGeneral Contractor203/21/2026
Genesis Plumbing and HeatingPlumbing107/08/2026
Just Plumbing & HeatingPlumbing108/14/2026
Mackler Master FireFire Protection107/08/2026
Mackler Master FirePlumbing107/08/2026
Nonstop PlumbersFire Protection107/08/2026
Plumbing NYCFire Protection107/08/2026
S & D Electric NYElectrical103/22/2026
Allied MD ConstructionGeneral Contractor107/08/2026
Prism PlusGeneral Contractor107/08/2026
ProbuilderoGeneral Contractor107/08/2026
Arsenal ScaffoldScaffold107/08/2026
JascoScaffold107/08/2026
Vallesigns & AwningsSign hanger107/08/2026
Bargain PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEP Inspections1102304/27/2026
CDG Architects LLC /Dba1327806/19/2025
A&B World Consulting5704105/01/2025
Cherico King Architect5674110/21/2024
Walter T. Gorman, P.E., P268402/07/2024
Frank Petruso Architect, P993111/15/2023
Asda Architecture + Desig2015111/23/2022
Architectural Engineering6111105/24/2022
Tan Engineering1291211/18/2020
Metric Consulting and Ins1803307/08/2020
Building Lifecycle
All (199)Filed (35)Permit Issued (31)Signed Off (23)Violation (49)Inspection (11)Objection (20)Special Inspection (30)
09/14/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING OFFICE SUITE INCLUDING NEW PARTITIONS, FINISHES, FURNITURE, AND MECHANICAL, ELECTRICAL, AND PLUMBING WORK TO ACCOMMODATE NEW LAYOUT.
M01389855-P1
08/13/2026
Permit issued — Plumbing
M01389855-S1-PL
07/27/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING OFFICE SUITE INCLUDING NEW PARTITIONS, FINISHES, FURNITURE, AND MECHANICAL, ELECTRICAL, AND PLUMBING WORK TO ACCOMMODATE NEW LAYOUT.
M01389855-S1
07/14/2026
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
06/08/2026
Permit issued — Mechanical Systems
M01389855-I1-GC
04/27/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING OFFICE SUITE INCLUDING NEW PARTITIONS, FINISHES, FURNITURE, AND MECHANICAL, ELECTRICAL, AND PLUMBING WORK TO ACCOMMODATE NEW LAYOUT.
M01389855-I1
04/21/2026
Signed off — Alteration
Installation of new HVAC system and associated ducts and piping.
M00991289-I1
04/21/2026
Signed off — Alteration
Installation of new HVAC system and associated ducts and piping.
M00991289-S3
04/20/2026
Special inspection requirement — Final
Nicolas Crosetto
04/20/2026
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
08/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/23/2025
Special inspection requirement — Shutoff dampers
06/23/2025
Special inspection requirement — Duct leakage testing, insulation and design
06/23/2025
Special inspection requirement — Final
Yongho Kim
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/23/2025
Special inspection requirement — Post-installed Anchors
06/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
06/23/2025
Special inspection requirement — Maintenance information
06/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
06/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
06/23/2025
Special inspection requirement — Mechanical Systems
Yongho Kim
06/20/2025
Signed off — Alteration
FILING HEREWITH DRAWINGS TO REPLACE (1) EXISTING COOLING TOWER WITH NEW ONE (1) CWT COOLING TOWER, RTCH-65A ON EXISTING CONCRETE PADS, IN-KIND. THIS APP DO NOTREQUIRE ANEW OR AMENDED C OF O AS THERE IS NO CHANGE IN USE, EXISTS OR OCCPY.
M01215950-I1
06/19/2025
Filed — Alteration
Installation of new HVAC system and associated ducts and piping.
M00991289-P4
06/05/2025
Signed off — Alteration
Installation of new HVAC system and associated ducts and piping.
M00991289-S2
06/02/2025
Special inspection requirement — Sprinkler Systems
Yongho Kim
05/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Yongho Kim
05/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Yongho Kim
05/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Yongho Kim
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
05/22/2025
Filed — Alteration
Installation of new HVAC system and associated ducts and piping.
M00991289-P2
05/22/2025
Filed — Alteration
Installation of new HVAC system and associated ducts and piping.
M00991289-P3
05/15/2025
Filed — Alteration
Installation of new HVAC system and associated ducts and piping.
M00991289-P1
05/02/2025
Permit issued — Mechanical Systems
M01215950-I1-MS
05/01/2025
Filed — Alteration
FILING HEREWITH DRAWINGS TO REPLACE (1) EXISTING COOLING TOWER WITH NEW ONE (1) CWT COOLING TOWER, RTCH-65A ON EXISTING CONCRETE PADS, IN-KIND. THIS APP DO NOTREQUIRE ANEW OR AMENDED C OF O AS THERE IS NO CHANGE IN USE, EXISTS OR OCCPY.
M01215950-I1
04/29/2025
Special inspection requirement — Lighting controls
Yongho Kim
04/29/2025
Special inspection requirement — Interior lighting power
Yongho Kim
04/29/2025
Special inspection requirement — Final
Yongho Kim
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
01/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/11/2024
Signed off — Alteration
M01124642-I1
11/19/2024
Permit issued — Sprinklers
M00991289-S3-EW-SP
10/29/2024
Permit issued — General Construction
M01124642-I1-GC
10/25/2024
Signed off — Alteration
Filing to renovate existing lobbies and storefront as per plans. No change in use, egress, or occupancy under this application.
M08036534-I1
10/21/2024
Filed — Alteration
M01124642-I1
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE MAREK
10/09/2024
Special inspection requirement — Final
LAWRENCE MAREK
08/24/2024
Objection resolved — Addressed
08/24/2024
Objection resolved — Addressed
08/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/19/2024
Objection resolved — Addressed
08/19/2024
Objection resolved — Addressed
08/19/2024
Objection resolved — Addressed
08/19/2024
Objection resolved — Addressed
08/19/2024
Objection resolved — Addressed
08/15/2024
Objection raised — Scope
08/15/2024
Objection raised — Structural
08/15/2024
Objection raised — Scope
08/15/2024
Objection raised — Inspections
Latest 60 of 199 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJust Plumbing & Heating08/13/2026
DOB NOWMechanical SystemsPermit IssuedProbuildero06/08/2026
DOB NOWMechanical SystemsSigned-offRosenwach Tank Co05/02/2025
DOB NOWSprinklersSigned-offPlumbing NYC11/19/2024
DOB NOWGeneral ConstructionSigned-offSova Construction10/29/2024
DOB NOWGeneral ConstructionSigned-offSova Construction07/30/2024
DOB NOWMechanical SystemsPermit IssuedSova Construction07/15/2024
DOB NOWPlumbingSigned-offFrankie Plumbing & Heating07/15/2024
DOB NOWPlumbingSigned-offBargain Plumbing01/31/2024
DOB NOWMechanical SystemsSigned-offPrism Plus12/01/2023
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold07/17/2023
DOB NOWPlumbingSigned-offMaxwell Plumbing Mechanical05/03/2023
DOB NOWGeneral ConstructionSigned-offWesbuilt Construction Man04/24/2023
DOB NOWSignSigned-offMauceri Sign Co03/13/2023
DOB NOWSignSigned-offMauceri Sign Co03/13/2023
DOB NOWSignSigned-offMauceri Sign Co03/10/2023
DOB NOWPlumbingSigned-offMaxwell Plumbing Mechanical01/27/2023
DOB NOWSprinklersSigned-offMackler Master Fire01/18/2023
DOB NOWPlumbingSigned-offMackler Master Fire01/17/2023
DOB NOWGeneral ConstructionSigned-offAccubuild Construction01/05/2023
DOB NOWMechanical SystemsSigned-offAccubuild Construction01/05/2023
DOB NOWMechanical SystemsSigned-offAllied MD Construction06/01/2022
DOB NOWSidewalk ShedSigned-offJasco10/19/2021
DOB NOWMechanical SystemsSigned-offSova Construction11/24/2020
DOB NOWMechanical SystemsSigned-offSova Construction11/24/2020
DOB NOWMechanical SystemsSigned-offSova Construction07/16/2020
DOB NOWMechanical SystemsSigned-offMelville Heating & Air Cond06/18/2020
DOB NOWSprinklersSigned-offNonstop Plumbers02/21/2020
DOB NOWPlumbingSigned-offGenesis Plumbing and Heating02/20/2020
DOB NOWPlumbingSigned-offFrankie Plumbing & Heating11/20/2019
DOB NOWSignSigned-offVallesigns & Awnings12/11/2017
BIS—ISSUEDAllied Thrid Ave02/10/2022
BISOTISSUEDGalco Contracting02/03/2020
BISOTISSUEDSova Construction10/18/2019
BISOTISSUEDAction Chutes04/04/2019
BISOTISSUEDDDG Development03/22/2019
BISPLISSUEDTriple Crown Plumbing & Heating11/02/2017
BISOTISSUEDAA Jedson Company10/10/2017
BISMHISSUEDUnique Mechanical08/24/2017
BISMHISSUEDAfgo Mechanical Services06/02/2017
+ 41 more permits on file
3 projects · most recent 09/14/2026
Air Conditioning Systems Heating Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/14/2026Permit IssuedProbuilderoAir Conditioning Systems, Heating Systems
Cooling
Goodman A-VXP48SA-1 48,000 BTU · Heat Pump Outdoor ×1
Heating
Goodman B-VXP48SA-1 79,200 BTU · Ahu ×1
06/19/2025Signed-offSova ConstructionAir Conditioning Systems
Cooling
Hitachi TVAHP060B21S 55,000 BTU · Vrf Outdoor ×4
02/07/2024Signed-offAccubuild ConstructionHeating and Air Conditioning Systems
Heat / Cool
Climatemaster AC-1-1 MODEL #TC-060 AC-1-2 MODEL #TC-060 AC-1-3 MODEL #TC-060 5,990 BTU · Wshp ×6
TC-018 1,730 BTU · Wshp ×2
Aaon SB-018-8-0-E80A-000 22,540 BTU · Wshp ×4
1 project · most recent 06/19/2025
Sprinkler System
FiledStatusContractorScope
06/19/2025Signed-offPlumbing Works NYCSprinkler System
2 projects · most recent 09/14/2026
Water/Sanitary
FiledStatusContractorScope
09/14/2026Permit IssuedJust Plumbing & HeatingWater/Sanitary
06/19/2025Signed-offFrankie Plumbing & HeatingWater/Sanitary
8 projects · most recent 07/08/2026
General Wiring
FiledStatusContractorScope
07/08/2026Permit IssuedTitanium ElectricalGeneral Wiring
03/10/2026Permit IssuedS & D Electric NYGeneral Wiring
07/29/2024Permit IssuedS & D Electric NYGeneral Wiring
03/27/2024Permit IssuedS & D Electric NYGeneral Wiring
01/17/2023CompleteAllstate ElectricGeneral Wiring
10/25/2021Permit IssuedRichard Neu—
07/07/2020CompleteBass ElectricalGeneral Wiring
03/27/2019CompleteTrince ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
08/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/26/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
07/14/2026Sprinkler SystemsNicolas Crosettospecial
04/20/2026Mechanical SystemsNicolas Crosettospecial
04/20/2026FinalNicolas Crosettoprogress
06/23/2025Shutoff dampers—energy_progress
06/23/2025Maintenance information—energy_progress
06/23/2025Duct leakage testing, insulation and design—energy_progress
06/23/2025HVAC-R and service water heating system controls—energy_progress
06/23/2025HVAC-R and service water heating equipment—energy_progress
06/23/2025Mechanical SystemsYongho Kimspecial
06/23/2025Fire-Resistant Penetrations and Joints—special
06/23/2025Post-installed Anchors—special
06/23/2025FinalYongho Kimprogress
06/23/2025HVAC-R and service water piping design and insulation—energy_progress
06/02/2025Sprinkler SystemsYongho Kimspecial
05/28/2025HVAC-R and service water piping design and insulationYongho Kimenergy_progress
05/28/2025HVAC-R and service water heating system controlsYongho Kimenergy_progress
05/28/2025HVAC-R and service water heating equipmentYongho Kimenergy_progress
05/28/2025Fire-Resistant Penetrations and JointsYongho Kimspecial
04/29/2025Fire-Resistant Penetrations and JointsYongho Kimspecial
04/29/2025Interior lighting powerYongho Kimenergy_progress
04/29/2025Lighting controlsYongho Kimenergy_progress
04/29/2025FinalYongho Kimprogress
10/10/2024Fire-Resistant Penetrations and JointsLAWRENCE MAREKspecial
10/09/2024FinalLAWRENCE MAREKprogress
02/08/2024HVAC-R and service water heating equipmentAbbas Familyenergy_progress
Latest 25 of 90.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Vivo InfusionMedical / HealthcareFloor 2
Project M01389855 Alteration · Permit Issued · 04/27/2026
Barnes & NobleRetailSub-basement, Floor 1
Project M01215950 Alteration · LOC Issued · 05/01/2025
Project M00832516 Alteration · LOC Issued · 03/13/2023
Project M00832524 Alteration · LOC Issued · 03/13/2023
Project M00749389 Alteration · Permit Entire · 11/04/2022
Project M00749426 Alteration · LOC Issued · 11/04/2022
Project M00750168 Alteration · LOC Issued · 11/04/2022
Project M00749303 Alteration · Permit Entire · 11/02/2022
Schweiger Dermatology GroupMedical / HealthcareFloor 3, Roof
Project M00991289 Alteration · Permit Entire · 05/21/2024
Professional P.TMedical / HealthcareFloor 3
Project M00945681 Alteration · LOC Issued · 11/15/2023
Project M00946354 Alteration · LOC Issued · 11/15/2023
BARNES&NObLE BOOKSELLE!Retail—
Project M00832531 Alteration · LOC Issued · 03/09/2023
Collina ItalianoEducationFloor 6, Roof
Project M00399553 Alteration · LOC Issued · 10/20/2020
Loft LinksFitness / RecreationFloor 2
Project M00293087 Alteration · LOC Issued · 02/04/2020
Project M00291616 Alteration · LOC Issued · 01/28/2020
Three Off the TeeRetailFloor 2
Project M00256083 Alteration · LOC Issued · 11/19/2019
Project M00256072 Alteration · LOC Issued · 11/18/2019
SLTFitness / RecreationFloor 1
Project M00002839 Alteration · LOC Issued · 11/30/2017
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 687 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch27
09/06/2026M00002839-I1Request digital key ↗
09/03/2026M00613488-I1Request digital key ↗
09/02/2026M00694932-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00256072-I1Request digital key ↗
09/05/2026M00291616-I1Request digital key ↗
09/04/2026M00399553-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00256083-I1Request digital key ↗
09/05/2026M00293087-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00293087-I1Request digital key ↗
▸Applications & Permits101
▸BISPLAN / WORK APPROVAL APPLICATION57
05/30/2023123849023Open ↗
01/21/2020123699471Open ↗
10/10/2019123887026Open ↗
Showing 3 of 57 on file for this type
▸BISWORK PERMIT APPLICATION43
02/10/2022123914247Open ↗
02/03/2020123699471Open ↗
10/21/2019123887026Open ↗
Showing 3 of 43 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/28/2022123914247Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/30/2020123849023Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
07/30/2020123849023Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
07/30/2020123849023Open ↗
▸Seals & Professional Certifications243
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION67
02/03/2020123699471Open ↗
01/21/2020123699471Open ↗
10/16/2019123887026Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWProgress Inspector Seal & Signature53
09/02/2026M00749389-I1Open ↗
09/02/2026M00749389-I1Open ↗
09/02/2026M00749389-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
10/14/2026M01389855-P1Open ↗
09/05/2026M00256072-P1Open ↗
09/05/2026M00256072-I1Open ↗
Showing 3 of 35 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST32
01/21/2020123699471Open ↗
04/04/2019123656392Open ↗
03/22/2019123406019Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/02/2026M00749389-I1Open ↗
09/02/2026M00749389-I1Open ↗
09/02/2026M00749389-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
01/21/2020123699471Open ↗
10/10/2019123887026Open ↗
04/04/2019123656392Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment42
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
07/18/2019121824375Open ↗
07/11/2019121824375Open ↗
07/03/2019121824375Open ↗
Showing 3 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
10/30/2015122457643Open ↗
Showing 1 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS7
07/25/2019121824375Open ↗
03/13/2018123045409Open ↗
10/20/2015122287257Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
07/26/2019121824375Open ↗
07/25/2019121824375Open ↗
09/29/2015122287257Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
01/04/2017120665574Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
02/07/2022123914247Open ↗
06/24/2016122810306Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTenant Protection Plan and Notes1
03/21/2017123045409Open ↗
▸Environmental & Asbestos60
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
10/14/2026M01389855-P1Open ↗
09/05/2026M00256072-P1Open ↗
09/05/2026M00256072-I1Open ↗
Showing 3 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
01/21/2020123699471Open ↗
10/10/2019123887026Open ↗
10/02/2017123185908Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026M00991289-S2Open ↗
08/13/2026M00991289-I1Open ↗
08/13/2026M00991289-S1Open ↗
Showing 3 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance41
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
02/03/2020123699471Open ↗
01/21/2020123699471Open ↗
10/16/2019123887026Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
07/10/2020123887026Open ↗
07/10/2020123699471Open ↗
05/07/2019123406019Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
02/07/2022123914247Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/10/2020123699471Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00694932-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/10/2020123887026Open ↗
07/10/2020123887026Open ↗
07/10/2020123699471Open ↗
▸Approvals, Objections & Sign-offs44
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST25
07/10/2020123887026Open ↗
07/10/2020123699471Open ↗
07/26/2019121824375Open ↗
Showing 3 of 25 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/13/2018123045409Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
03/20/2019123849023Open ↗
▸Cost, Insurance & Ownership54
▸BISCOST AFFIDAVIT52
07/10/2020123887026Open ↗
07/10/2020123699471Open ↗
01/21/2020123699471Open ↗
Showing 3 of 52 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/03/2022123914247Open ↗
▸Filing & Intake Forms52
▸BISEFILING COVER SHEET30
01/21/2020123699471Open ↗
10/10/2019123887026Open ↗
04/04/2019123656392Open ↗
Showing 3 of 30 on file for this type
▸BISBOROUGH INTAKE FORM14
05/30/2023123849023Open ↗
07/26/2019121824375Open ↗
07/11/2019121824375Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION7
02/07/2022123914247Open ↗
01/13/2022123914247Open ↗
07/30/2020123849023Open ↗
Showing 3 of 7 on file for this type
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
03/20/2019123849023Open ↗
03/20/2019123849023Open ↗
03/20/2019123849023Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
03/20/2019123849023Open ↗