← Back
BuildNYC
Hospital, sanitarium, mental institution
177 FORT WASHINGTON AVENUE
MANHATTAN · BIN 1076746
💬 Discuss this project
1989Year Built
14Stories
I1Building Class
R8Zoning
891,040 sfGross Floor Area
1Units
LL97 Covered3 Active Violations 1 unresolved · 2 paperwork only ▸FISP: SWARMP
Hospital, sanitarium, mental institution · 245,035 sf lot · 3.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNewYork-PresbyterianUnder Construction2 filings
RoofNewYork-Presbyterian, Society of the NY Hospital +17 filings · 16 docs
PenthouseNewYork-Presbyterian1 filing · 3 docs
Floor 10NewYork-Presbyterian, Society of the NY Hospital +19 filings · 7 docs
Floor 9NewYork-Presbyterian, Panera Bread8 filings · 18 docs
Floor 8NewYork-Presbyterian, Panera Bread7 filings · 18 docs
Floor 7
Floor 6NewYork-PresbyterianUnder Construction2 filings · 1 doc
Floor 5NewYork-PresbyterianUnder Construction3 filings · 1 doc
Floor 4NewYork-Presbyterian, New York Presbyterian HospitalUnder Construction14 filings · 16 docs
Floor 3NewYork-Presbyterian, New York Presbyterian HospitalUnder Construction14 filings · 16 docs
Floor 2NewYork-Presbyterian, Milstein Heart CenterUnder Construction16 filings · 16 docs
Floor 1NewYork-Presbyterian, New York Presbyterian Hospital +1Under Construction13 filings · 16 docs
CellarColumbia Heart Center, NewYork-Presbyterian +1Under Construction5 filings · 17 docs
Sub-CellarNewYork-PresbyterianUnder Construction7 filings · 17 docs
Site & exteriorNew York Presbyterian Hospital, NewYork-PresbyterianUnder Construction3 filings · 12 docs
Filed — no permit issuedPanera Bread1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY Presbyterian Hospital-Fac RE13803/22/2026
NYC Department of Housing Preservation and Development1103/21/2026
Milstein Hospital603/21/2026
Royal Charter Properties603/21/2026
NYP103/22/2026
NY Pres Hospital103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Expediting21003/21/2026
Howard I Shapiro Associates603/21/2026
Skyline Access103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consigli ConstructionGeneral Contractor3011/19/2026
West ContractingGeneral Contractor3003/21/2026
Lendlease (US) ConstructionGeneral Contractor2907/08/2026
Sirina Fire ProtectionFire Protection2811/13/2026
Hellman ConstructionGeneral Contractor2807/08/2026
Bovis Lend LeaseGeneral Contractor2703/21/2026
Riehm Plumbingspecialty_contractor2107/08/2026
Alliance PlumbingPlumbing1907/08/2026
Consigli Constructionspecialty_contractor1811/19/2026
Hellman Constructionspecialty_contractor1707/08/2026
Lendlease US Constructionspecialty_contractor1707/08/2026
Current Fire ProtectionFire Protection1407/08/2026
Cardoza PlumbingPlumbing1307/08/2026
Empire General ContractingGeneral Contractor1207/08/2026
SMC ConstructionGeneral Contractor803/21/2026
PAR PlumbingPlumbing807/08/2026
HRH ConstructionGeneral Contractor703/21/2026
H M HughesGeneral Contractor703/21/2026
Shawmut Woodworking & SupplyGeneral Contractor707/08/2026
Code Fire ProtectionFire Protection703/21/2026
Rael Automatic Sprinklerspecialty_contractor707/08/2026
Lend Lease US ConstructionGeneral Contractor603/21/2026
NYC Fire SprinklerFire Protection607/08/2026
Taggart Associatesspecialty_contractor503/21/2026
E-J Electric InstallationElectrical403/22/2026
CardozaPlumbing403/21/2026
P.K. Construction NYGeneral Contractor403/21/2026
Giachetti Plumbing & Heatingspecialty_contractor403/21/2026
Shawmut Woodworking Supplyspecialty_contractor403/21/2026
Cauldwell WingateGeneral Contractor303/21/2026
F J Sciame ConstructionGeneral Contractor303/21/2026
HM HughesGeneral Contractor303/21/2026
Hunter Roberts ConstructionGeneral Contractor307/08/2026
PJP InstallersGeneral Contractor303/21/2026
Turner ConstructionGeneral Contractor303/21/2026
Vanguard ConstructionGeneral Contractor307/08/2026
West ConstructionGeneral Contractor303/21/2026
Atlantic Heydt ScaffoldGeneral Contractor303/21/2026
Nelson Air Devicespecialty_contractor311/08/2026
Empire General Contractingspecialty_contractor307/08/2026
Five Boro Fire ProtectionFire Protection303/21/2026
Universal Builders SupplyGeneral Contractor203/21/2026
Spring ScaffoldingScaffold210/02/2026
Harley ElectricElectrical203/22/2026
Fresh Meadow MechanicalScaffold207/08/2026
Crescent ContractingGeneral Contractor203/21/2026
Civetta MechanicalPlumbing207/08/2026
Richards Plumbing & Heatingspecialty_contractor203/21/2026
Ashland Plumbing CoarpPlumbing203/21/2026
CardozPlumbing103/21/2026
Hatzel and BuehlerElectrical103/22/2026
Island Fire Sprinkler-NYCFire Protection103/21/2026
Ram Fire ProtectionFire Protection103/21/2026
Triangle Fire ProtectionFire Protection103/21/2026
Callaghan KevinGeneral Contractor103/21/2026
Fresh Meadow Mechanicalspecialty_contractor104/09/2026
GrenadierGeneral Contractor103/21/2026
Interboro SignGeneral Contractor103/21/2026
Safway AtlanticGeneral Contractor103/21/2026
Trystate MechanicalGeneral Contractor103/21/2026
Unviversal Builders SupplyGeneral Contractor103/21/2026
W ContractingGeneral Contractor103/21/2026
West ConrGeneral Contractor103/21/2026
Almar Plumbing & HeatingPlumbing103/21/2026
Ashland Plumbing & HeatingPlumbing103/21/2026
D S PlumbingPlumbing103/21/2026
Greene MechanicalPlumbing103/21/2026
Kaplan BreslawPlumbing103/21/2026
L RosenmanPlumbing103/21/2026
PAR PLGPlumbing103/21/2026
Pref MechanicalPlumbing103/21/2026
Taggart AssoPlumbing103/21/2026
Fresh Meadow Mechanicalspecialty_contractor104/09/2026
P K Construction NYspecialty_contractor107/08/2026
A & F Fire ProtectionFire Protection112/07/2016
Almar Plumbing & HeatingPlumbing105/19/1995
A. McPhee & SonsPlumbing109/26/1991
Ashland PLG HeatingPlumbing107/05/1995
Ashland PlumbingPlumbing103/04/2002
Brisk WaterproofingGeneral Contractor110/30/2015
Brisk WaterproofingGeneral Contractor210/24/2005
Cardoza WinerPlumbing105/07/1998
Cordoza WinerPlumbing110/20/2000
Corp Interiors ContrctngGeneral Contractor106/22/1998
De-Con Mechanical ContractorsPlumbing108/05/1992
Fire Boro Fire ProtectionFire Protection107/01/2003
GardozPlumbing106/12/2002
Gilbane Building CompanyGeneral Contractor205/20/2013
Gould Automatic SprinklerFire Protection107/05/1994
Greene McChnlPlumbing109/08/1994
Hellman Construction Co. In.cGeneral Contractor112/06/2000
Hellman Construction LaneGeneral Contractor112/06/2000
HM HugsGeneral Contractor207/03/2007
HoneywellGeneral Contractor212/03/1997
Intersate Mechanical ServicesGeneral Contractor106/15/2007
James A JenningsGeneral Contractor209/10/1999
John F Davie ConstructionGeneral Contractor106/12/2003
J.T. Magen and CoGeneral Contractor112/23/1999
King Hoist & ScaffoldGeneral Contractor106/27/2008
Lawrence J. LevineFire Protection212/09/2011
Lehrer McGovern BovisGeneral Contractor212/29/1999
Liberty PlummbingPlumbing108/18/1995
McCainGeneral Contractor207/24/2003
Michael Anthony ContractingGeneral Contractor705/31/2019
Michael Benjouya ControlledGeneral Contractor106/27/2000
National SprinklerFire Protection112/21/1995
NYC Sprinkler SystemsFire Protection105/24/2006
Preferred MechanicalPlumbing107/15/2003
Preferred SprinklerFire Protection108/07/2003
Prime InteriorsGeneral Contractor106/11/1998
Rehm PlumbingPlumbing104/07/2005
Richards P and HPlumbing106/22/2011
Richards P and HFire Protection206/22/2011
Riehm PlumbingPlumbing301/24/2007
Sage PlumbingPlumbing107/07/1994
Servall SystemGeneral Contractor206/11/1999
S.I.S. AssociatesPlumbing105/26/1992
SMC ConstructionGeneral Contractor203/29/2005
SMC. ConstrucitonGeneral Contractor105/08/2007
Srina Fire Proecion CorporaionFire Protection111/02/2000
Stern Fire ProtectionFire Protection112/28/1992
Taggaart AssociatesPlumbing108/17/2000
Taggart AssociatedPlumbing110/06/2005
Timbil MechanicalGeneral Contractor112/03/1997
WDFPlumbing110/12/1999
West ConstructionGeneral Contractor111/14/2003
West ContractingGeneral Contractor202/04/2003
West ContractingGeneral Contractor202/07/2001
West Contracting CoppGeneral Contractor311/14/2003
West ContractingGeneral Contractor111/14/2003
West ContractingGeneral Contractor411/14/2003
West ContractingGeneral Contractor102/20/2003
West ContractingGeneral Contractor311/14/2003
West ContractingGeneral Contractor103/12/2003
West Contracting CropGeneral Contractor211/14/2003
York Scaff. EquGeneral Contractor110/01/2003
York Scaffold EquipmentGeneral Contractor108/16/2005
York Scaffold EquipmentGeneral Contractor508/30/2007
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates42310311/16/2026
Tectonic Engineering106403/11/2026
Skyline Engineering267805/15/2023
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
11/24/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
M01258964-S1-EW-SP
11/16/2026
Filed — Alteration
MHB DWT: Sprinkler and standpipe modifications as indicated on plans filed herewith. no change to use, egress or occupancy.
M00943335-P3
11/16/2026
Permit issued — Mechanical Systems
M01425241-S2-MS
11/16/2026
Permit issued — General Construction
M01425241-I1-GC
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedConsigli Construction11/16/2026
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction11/16/2026
DOB NOWSprinklersPermit IssuedSirina Fire Protection11/12/2026
DOB NOWMechanical SystemsPermit IssuedNelson Air Device11/04/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding10/01/2026
DOB NOWSupported ScaffoldPermit IssuedSpring Scaffolding09/18/2026
DOB NOWSuspended ScaffoldPermit IssuedSuperstars Contracting08/17/2026
DOB NOWStructuralPermit IssuedConsigli Construction08/13/2026
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction08/05/2026
DOB NOWMechanical SystemsPermit IssuedConsigli Construction08/03/2026
DOB NOWMechanical SystemsSigned-offConsigli Construction07/30/2026
DOB NOWSprinklersPermit IssuedSirina Fire Protection07/29/2026
DOB NOWGeneral ConstructionSigned-offConsigli Construction07/29/2026
DOB NOWSprinklersPermit IssuedCurrent Fire Protection06/23/2026
DOB NOWSprinklersSigned-offSirina Fire Protection06/18/2026
DOB NOWGeneral ConstructionPermit IssuedHellman Construction06/16/2026
DOB NOWPlumbingPermit IssuedAlliance Plumbing06/10/2026
DOB NOWMechanical SystemsPermit IssuedHellman Construction06/03/2026
DOB NOWGeneral ConstructionPermit IssuedHellman Construction06/03/2026
DOB NOWPlumbingPermit IssuedRiehm Plumbing06/03/2026
DOB NOWSprinklersPermit IssuedRiehm Plumbing06/03/2026
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction04/29/2026
DOB NOWPlumbingPermit IssuedCivetta Mechanical04/29/2026
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe03/30/2026
DOB NOWStructuralPermit IssuedFresh Meadow Mechanical03/09/2026
DOB NOWMechanical SystemsPermit IssuedFresh Meadow Mechanical03/09/2026
DOB NOWGeneral ConstructionSigned-offConsigli Construction03/04/2026
DOB NOWMechanical SystemsSigned-offConsigli Construction12/20/2025
DOB NOWStructuralSigned-offConsigli Construction12/19/2025
DOB NOWPlumbingPermit IssuedCivetta Mechanical12/08/2025
DOB NOWPlumbingPermit IssuedCardoza Plumbing Wmbe11/26/2025
DOB NOWSprinklersPermit IssuedRael Automatic Sprinkler11/24/2025
DOB NOWSprinklersPermit IssuedSirina Fire Protection11/20/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe11/19/2025
DOB NOWStructuralPermit IssuedHunter Roberts Construction11/05/2025
DOB NOWMechanical SystemsPermit IssuedNelson Air Device11/05/2025
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration11/03/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe10/29/2025
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction10/29/2025
DOB NOWSprinklersPermit IssuedSirina Fire Protection10/06/2025
+ 60 more permits on file
7 projects · most recent 11/16/2026
Associated Ducts and Piping Air Conditioning Systems Ventilation Systems Heating Systems Others Cooling Towers
FiledStatusContractorScope
11/16/2026Signed-offConsigli ConstructionAssociated Ducts and Piping, Heating Systems
10/13/2026Permit IssuedConsigli ConstructionAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
07/07/2026Signed-offConsigli ConstructionAir Conditioning Systems
06/10/2026Permit IssuedFresh Meadow MechanicalOthers, Ventilation Systems
05/21/2026——Air Conditioning Systems, Ventilation Systems
08/22/2025Signed-offConsigli ConstructionAir Conditioning Systems, Associated Ducts and Piping
05/29/2024Signed-offShawmut Woodworking & SupplyAssociated Ducts and Piping, Cooling Towers
9 projects · most recent 11/16/2026
Sprinkler System
FiledStatusContractorScope
11/16/2026Permit IssuedSirina Fire Protection—
11/04/2026———
10/21/2026——Sprinkler System
10/13/2026Permit IssuedRael Automatic Sprinkler—
07/07/2026Signed-offSirina Fire Protection—
05/29/2026Permit IssuedRiehm PlumbingSprinkler System
05/21/2026Permit IssuedSirina Fire Protection—
03/11/2026Permit IssuedCurrent Fire Protection I—
06/05/2025Permit IssuedSirina Fire Protection—
9 projects · most recent 11/16/2026
Water/Sanitary Medical Gas
FiledStatusContractorScope
11/16/2026Permit IssuedRiehm PlumbingWater/Sanitary
11/04/2026——Medical Gas, Water/Sanitary
10/21/2026——Medical Gas, Water/Sanitary
10/13/2026Permit IssuedCivetta MechanicalMedical Gas, Water/Sanitary
07/07/2026Signed-offCardoza Plumbing WmbeMedical Gas, Water/Sanitary
05/29/2026Permit IssuedRiehm PlumbingWater/Sanitary
05/21/2026Permit IssuedCardoza PlumbingMedical Gas, Water/Sanitary
03/11/2026———
06/05/2025Permit IssuedCardoza PlumbingMedical Gas, Water/Sanitary
25 projects · most recent 08/04/2026
General Wiring
FiledStatusContractorScope
08/04/2026Permit IssuedTop Shelf Electric—
06/04/2026Permit IssuedAllan Briteway ElectricalGeneral Wiring
03/12/2026CompleteA.S.R. Electrical ContractingGeneral Wiring
12/02/2025Permit IssuedE-J Electric InstallationGeneral Wiring
11/19/2025Permit IssuedHatzel and BuehlerGeneral Wiring
10/24/2025Permit IssuedE-J Electric InstallationGeneral Wiring
07/08/2025Permit IssuedEgg ElectricGeneral Wiring
02/28/2025Permit IssuedGilston Electrical ContngGeneral Wiring
01/09/2025Permit IssuedE-J Electric InstallationGeneral Wiring
09/27/2024CompleteLowy & DonnathGeneral Wiring
09/19/2024CompleteE-J Electric Installation—
08/12/2024Permit IssuedE-J Electric InstallationGeneral Wiring
08/12/2024Permit IssuedE-J Electric InstallationGeneral Wiring
08/12/2024Permit IssuedE-J Electric InstallationGeneral Wiring
05/26/2024CompleteHarley ElectricGeneral Wiring
5 projects · most recent 06/10/2026
Steel Concrete
FiledStatusContractorScope
06/10/2026Permit IssuedFresh Meadow MechanicalSteel, Concrete
05/05/2026Permit IssuedHunter Roberts ConstructionSteel
08/22/2025Signed-offConsigli ConstructionConcrete
08/19/2025Permit IssuedConsigli ConstructionSteel, Concrete
06/09/2025Permit IssuedHunter Roberts ConstructionSteel
1 project · most recent 10/19/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/19/2026Permit IssuedSpring ScaffoldingScaffold, Sidewalk Shed
2 projects · most recent 08/06/2026
FiledStatusContractorScope
08/06/2026Permit IssuedSuperstars Contracting—
10/08/2025Permit IssuedSkyline Access—
▾Field Inspections (DOB CAP) — 99
DateTypeResultReport
09/23/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/18/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/06/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
07/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/02/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/31/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/09/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
02/05/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
02/05/2026Certified Medical Gas - MG - PL - TestCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
Latest 25 of 99.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
11/02/2026Fire-Resistant Penetrations and Joints—special
11/02/2026Energy Code Compliance Inspections—progress
11/02/2026Post-installed Anchors—special
10/21/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
10/21/2026Duct leakage testing, insulation and designYoung Suhenergy_progress
10/21/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
10/21/2026MeteringYoung Suhenergy_progress
10/21/2026Maintenance informationYoung Suhenergy_progress
10/21/2026Shutoff dampersYoung Suhenergy_progress
10/21/2026Electrical motors and elevatorsYoung Suhenergy_progress
10/21/2026Lighting controlsYoung Suhenergy_progress
10/21/2026HVAC-R and service water heating equipmentYoung Suhenergy_progress
10/21/2026Interior lighting powerYoung Suhenergy_progress
10/20/2026Energy Code Compliance Inspections—progress
10/20/2026Fire-Resistant Penetrations and Joints—special
10/20/2026Post-installed Anchors—special
10/08/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
10/08/2026Fire-Resistance Rated ConstructionYoung Suhprogress
10/07/2026Energy Code Compliance InspectionsYoung Suhprogress
10/07/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
10/07/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
10/07/2026HVAC-R and service water heating equipmentYoung Suhenergy_progress
10/07/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
10/07/2026Post-installed AnchorsYoung Suhspecial
09/22/2026Sprinkler SystemsYoung Suhspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NewYork-PresbyterianMedical / HealthcareSub-cellar, Cellar, Floors 1–10, Penthouse, Roof
Project M01427559 Alteration · Approved · 11/03/2026
Project M01461506 Alteration · Approved · 11/03/2026
Project M01425241 Alteration · Permit Entire · 10/20/2026
Project M01224259 Alteration · Permit Entire · 05/21/2026
Project M01314744 Alteration · Permit Entire · 12/29/2025
Project M01258950 Alteration · Permit Entire · 08/18/2025
Project M01258964 Alteration · Permit Entire · 08/12/2025
Project M01224243 Alteration · Permit Entire · 06/09/2025
Project M01224348 Alteration · Permit Entire · 06/09/2025
Project M01224286 Alteration · Permit Entire · 06/05/2025
Project M01177027 Alteration · LOC Issued · 04/09/2025
Project M01177036 Alteration · LOC Issued · 04/07/2025
Panera BreadRestaurant / Food ServiceCellar, Floors 1, 9, Roof
Project M01454635 Alteration CO · Plan Examiner Review · 10/22/2026
Project M01461500 Alteration · Objections · 10/22/2026
Columbia Heart CenterMedical / HealthcareCellar
Project M01381827 Alteration · Permit Entire · 05/29/2026
Society of the NY HospitalMedical / HealthcareFloor 10, Roof
Project M00940592 Alteration · LOC Issued · 10/17/2023
Project M08054825 Alteration · LOC Issued · 01/05/2023
Milstein Heart CenterMedical / HealthcareFloor 2
Project M00307440 Alteration · LOC Issued · 02/25/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
3,581 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account