← Back
Miscellaneous educational facility
Bais Ruchel High School
177 HARRISON AVENUE · BIN 3397167
💬 Discuss this project
2012Year Built
5Stories
W9Building Class
R7AZoning
111,517 sfGross Floor Area
1Units
LL97 Covered2 Open Violations ▸FDNY Report ↗
Miscellaneous educational facility · Owner of record: BAIS RUCHEL HIGH SCHOOL, INC. · 27,500 sf lot · 4.06 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof1p · 1 filing · 3 docs
Floor 51p · 1 filing · 7 docs
Floor 421p · 2 filings · 20 docs
Floor 323p · 2 filings · 20 docs
Floor 222p · 2 filings · 20 docs
Floor 125p · 2 filings · 20 docs
Cellar23p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP504/09/2026
BAIS RUCHEL HIGH SCHOOL4903/22/2026
G GROUP ASSOCIATES1103/22/2026
BAIS RUCHEL HIGH SCHOOL 1203/22/2026
BINS RUC HIGH SCHOOL103/22/2026
BIAS RUCHEL HIGH SCHOOL103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC203/21/2026
BAC Developers Group1803/21/2026
HOWARD I SHAPIRO ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G GROUP ASSOCIATES INCGeneral Contractor1807/08/2026
TRISTATE FIRE SPRINK INCFire Protection407/08/2026
GWT ENTERPRISES INCGeneral Contractor204/09/2026
WNW & SONS PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161612/04/2025
Building Lifecycle
All (221)Filed (20)Permit Issued (25)Signed Off (11)Violation (46)Inspection (11)Objection (78)Special Inspection (30)
07/30/2026
Signed off — Alteration CO
Application herewith filed for Mechanical System in conjunction with Alt 1 job number B08027412-I1.
B08027412-S5
07/30/2026
Signed off — Alteration CO
Application herewith filed for Mechanical System in conjunction with Alt 1 job number B08027412-I1.
B08027412-S8
05/20/2026
Signed off — Alteration
Occupant Protection Plan as per plans filed herewith. This application is filed in conjunction with DOB #B08027412-I1.
B00926949-I1
01/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/28/2026
Signed off — Alteration CO
Application herewith filed for Mechanical System in conjunction with Alt 1 job number B08027412-I1.
B08027412-S4
01/28/2026
Signed off — Alteration CO
Application herewith filed for Mechanical System in conjunction with Alt 1 job number B08027412-I1.
B08027412-S3
01/28/2026
Signed off — Alteration CO
Application herewith filed for Mechanical System in conjunction with Alt 1 job number B08027412-I1.
B08027412-S1
01/28/2026
Signed off — Alteration CO
Application herewith filed for Mechanical System in conjunction with Alt 1 job number B08027412-I1.
B08027412-S2
01/28/2026
Signed off — Alteration CO
Application herewith filed for Mechanical System in conjunction with Alt 1 job number B08027412-I1.
B08027412-S7
01/27/2026
Signed off — Alteration
B00870592-I1
01/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/21/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
01/21/2026
Special inspection requirement — Standpipe Systems
FAHAD FATEH
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/09/2026
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
12/11/2025
Objection raised — Mechanical
12/11/2025
Objection raised — Structural
12/11/2025
Objection raised — Structural
12/11/2025
Objection raised — Structural
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Structural
12/11/2025
Objection raised — Structural
12/04/2025
Filed — Alteration CO
Application herewith filed for Mechanical System in conjunction with Alt 1 job number B08027412-I1.
B08027412-A2
12/01/2025
Permit issued — Mechanical Systems
B08027412-S7-MS
11/24/2025
Signed off — Alteration CO
Application herewith filed for Mechanical System in conjunction with Alt 1 job number B08027412-I1.
B08027412-S6
11/18/2025
Permit issued — Standpipe
B08027412-S5-EW-SP
11/18/2025
Permit issued — Sprinklers
B08027412-S5-EW-SD
11/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/03/2025
Violation issued (FDNY_ORDER, closed)
11/03/2025
Violation issued (FDNY_ORDER, closed)
11/03/2025
Violation issued (FDNY_ORDER, closed)
10/29/2025
Signed off — Alteration
B01114481-I1
10/23/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/18/2025
Objection resolved — Addressed
09/18/2025
Objection resolved — Addressed
09/15/2025
Objection resolved — Addressed
09/05/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/14/2025
Permit issued — Construction Fence
B00870592-I1-FN
08/14/2025
Objection resolved — Addressed
08/13/2025
Objection raised — Fire_Protection
08/12/2025
Objection resolved — Addressed
08/01/2025
Violation issued (ECB, closed)
Construction
08/01/2025
Violation issued (ECB, closed)
Site Safety
08/01/2025
Violation issued (ECB, closed)
Construction
07/28/2025
Objection resolved — Addressed
07/22/2025
Objection raised — Scope
07/22/2025
Objection raised — Energy
07/22/2025
Objection raised — Fire_Protection
07/22/2025
Objection raised — Cost
07/22/2025
Objection raised — Fire_Protection
07/22/2025
Objection raised — Fire_Protection
Latest 60 of 221 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offG GROUP ASSOCIATES INC12/01/2025
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC11/18/2025
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC11/18/2025
DOB NOWConstruction FenceSigned-offG GROUP ASSOCIATES INC08/14/2025
DOB NOWGeneral ConstructionPermit IssuedG GROUP ASSOCIATES INC05/15/2025
DOB NOWPlumbingSigned-offWNW & SONS PLBG & HTG INC01/23/2025
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC11/20/2024
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC11/20/2024
DOB NOWGeneral ConstructionSigned-offG GROUP ASSOCIATES INC11/01/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC09/24/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC09/24/2024
DOB NOWStructuralSigned-offG GROUP ASSOCIATES INC08/28/2024
DOB NOWSupport of ExcavationSigned-offG GROUP ASSOCIATES INC08/28/2024
DOB NOWFoundationSigned-offG GROUP ASSOCIATES INC08/28/2024
DOB NOWFoundationSigned-offG GROUP ASSOCIATES INC08/27/2024
DOB NOWConstruction FenceSigned-offG GROUP ASSOCIATES INC08/27/2024
DOB NOWPlumbingSigned-offWNW & SONS PLBG & HTG INC08/05/2024
DOB NOWGeneral ConstructionPermit IssuedG GROUP ASSOCIATES INC05/30/2024
DOB NOWGeneral ConstructionSigned-offG GROUP ASSOCIATES INC10/11/2023
DOB NOWGeneral ConstructionPermit IssuedG GROUP ASSOCIATES INC09/07/2023
DOB NOWSupport of ExcavationSigned-offG GROUP ASSOCIATES INC08/28/2023
DOB NOWStructuralSigned-offG GROUP ASSOCIATES INC08/28/2023
DOB NOWConstruction FenceSigned-offG GROUP ASSOCIATES INC08/28/2023
DOB NOWEarth WorkSigned-offG GROUP ASSOCIATES INC08/28/2023
DOB NOWFoundationSigned-offG GROUP ASSOCIATES INC08/28/2023
BISPLISSUEDROCK E SMALL PLBG&HTG INC05/15/2015
BIS—ISSUEDBAIS RUCHEL HIGH SCHOOL I03/11/2015
BIS—ISSUEDBAIS RUCHEL HIGH SCHOOL I03/11/2015
BISPLISSUEDROCK E SMALL PLBG&HTG INC12/08/2014
BISSDISSUEDSAFETY FIRE SPRINKLER CORP12/01/2014
BISSDISSUEDSAFETY FIRE SPRINKLER CORP11/26/2014
BISSPISSUEDSAFETY FIRE SPRINKLER CORP11/26/2014
BIS—ISSUEDBAIS RUCHEL HIGH SCHOOL I11/07/2014
BISEQISSUEDBAIS RUCHEL HIGH SCHOOL I11/07/2014
BIS—ISSUEDBAIS RUCHEL HIGH SCHOOL I11/07/2014
BISFPISSUEDCITYWIDE FIRE SYS PLBG EN10/30/2014
BISFSISSUEDMICHAEL S. KAPLAN09/17/2014
BIS—ISSUEDBAIS RUCHEL HIGH SCHOOL I09/09/2014
BIS—RE-ISSUEDBAIS RUCHEL HIGH SCHOOL I09/08/2014
BISEQISSUEDBAIS RUCHEL HIGH SCHOOL I09/08/2014
+ 22 more permits on file
1 project · most recent 12/04/2025
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/04/2025Signed-offG GROUP ASSOCIATES INCAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Intertek RN-030-3-0HBBC-VO.21-000-A 144,000 BTU · Vrf Outdoor ×3
RNA-007.A-A-A-8-HJA0A-A04NB 120,000 BTU · Vrf Outdoor ×1
RNA-008-A-A-8HABOA-A04N0 144,000 BTU · Vrf Outdoor ×1
RNA-030-C-A-8-HJB0C-A04ND 72,000 BTU · Vrf Outdoor ×1
Heat / Cool
Mitsubishi Electric PURY-EP120TNU-A1<H> 2,200 CFM · Vrf Outdoor ×2
Intertek RN-030-3-0HBBC-VO.21-000-A 7,050 CFM · Vrf Outdoor ×1
Heating
Intertek RN-030-3-0HBBC-VO.21-000-A 160,000 BTU · Vrf Outdoor ×2
RNA-007.A-A-A-8-HJA0A-A04NB 135,000 BTU · Vrf Outdoor ×1
RNA-008-A-A-8HABOA-A04N0 160,000 BTU · Vrf Outdoor ×1
RNA-030-C-A-8-HJB0C-A04ND 80,000 BTU · Vrf Outdoor ×1
Mitsubishi Electric RN-030-3-0HBBC-VO.21-000-A 135,000 BTU · Vrf Outdoor ×1
Ventilation
Mitsubishi Electric PURY-EP120TNU-A1<H> 160 CFM · Vrf Outdoor ×8
PUHY-EP192TNU-A1<H> 1,000 CFM · Vrf Outdoor ×1
PURY-EP144TNU-A1<H> 1,000 CFM · Vrf Outdoor ×1
PURY-EP96TNU-A1<H> 75 CFM · Vrf Outdoor ×1
1 project · most recent 12/04/2025
Sprinkler System
FiledStatusContractorScope
12/04/2025Signed-offTRISTATE FIRE SPRINK INCSprinkler System
1 project · most recent 12/04/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/04/2025Signed-offADD MECHANICAL INCStorm, Water/Sanitary
3 projects · most recent 07/01/2025
General Wiring
FiledStatusContractorScope
07/01/2025CompleteM.R. ELEC'L SERVICE LLCGeneral Wiring
09/19/2024CompleteSOLAS ELECTRICAL CORP—
04/24/2018CompleteLINTECH ELECTRIC, INC.General Wiring
1 project · most recent 12/04/2025
Steel Concrete Masonry
FiledStatusContractorScope
12/04/2025Signed-offG GROUP ASSOCIATES INCSteel, Concrete, Masonry
1 project · most recent 12/04/2025
Dewatering Earthwork
FiledStatusContractorScope
12/04/2025Signed-offG GROUP ASSOCIATES INCDewatering, Earthwork
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/30/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/25/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
01/21/2026Sprinkler SystemsFAHAD FATEHspecial
01/21/2026Standpipe SystemsFAHAD FATEHspecial
01/21/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/13/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
03/13/2025Exterior lighting powerFAHAD FATEHenergy_progress
03/13/2025Fenestration areasFAHAD FATEHenergy_progress
03/13/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/13/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/13/2025Fenestration air leakageFAHAD FATEHenergy_progress
03/13/2025VestibulesFAHAD FATEHenergy_progress
03/13/2025Permanent certificateFAHAD FATEHenergy_progress
03/13/2025Interior lighting powerFAHAD FATEHenergy_progress
03/13/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
03/13/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/13/2025MasonryFAHAD FATEHspecial
03/13/2025Sprayed fire-resistant materialsFAHAD FATEHspecial
03/13/2025Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
03/13/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
03/13/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/13/2025PreliminaryFAHAD FATEHprogress
03/13/2025Lighting controlsFAHAD FATEHenergy_progress
09/16/2024Shutoff dampersFAHAD FATEHenergy_progress
09/16/2024Maintenance informationFAHAD FATEHenergy_progress
09/16/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/16/2024FinalFAHAD FATEHprogress
Latest 25 of 99.
▾Documents — 592 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/27/2026B00870592-I1Request digital key ↗
08/26/2026B00926949-I1Request digital key ↗
08/24/2026B08027412-P4Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits107
▸BISPLAN / WORK APPROVAL APPLICATION53
11/25/2025340887142Open ↗
05/09/2023340887142Open ↗
02/10/2023321093696Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION24
05/18/2015340200428Open ↗
Showing 1 of 24 on file for this type
▸BISPLACE OF ASSEMBLY15
02/14/2023321093696Open ↗
02/14/2023321088434Open ↗
02/02/2023321094766Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN - WORK &amp; PERMITS - SUPPPORTING DOCUMENTATION6
03/17/2020321088443Open ↗
03/17/2020321088256Open ↗
03/17/2020321094766Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF6
08/27/2015321093696Open ↗
08/27/2015321094766Open ↗
08/27/2015321088256Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/09/2023340887142Open ↗
Showing 1 of 2 on file for this type
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
07/31/2015320294953Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWRestrictive Declaration/Easement 16
08/24/2026B08027412-P9Open ↗
08/13/2026B08027412-S1Open ↗
08/13/2026B08027412-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/24/2026B08027412-P9Open ↗
08/24/2026B08027412-P2Open ↗
08/14/2026B08027412-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/24/2026B08027412-P9Open ↗
08/13/2026B08027412-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08027412-I1Open ↗
▸Seals & Professional Certifications113
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION52
09/21/2015321164235Open ↗
08/26/2015321088443Open ↗
08/26/2015321088443Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/24/2026B08027412-P4Open ↗
08/24/2026B08027412-S5Open ↗
08/24/2026B08027412-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
08/28/2026B08027412-P3Open ↗
08/28/2026B08027412-P4Open ↗
08/28/2026B08027412-S5Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/28/2026B08027412-P4Open ↗
08/27/2026B08027412-S2Open ↗
08/27/2026B08027412-P2Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/09/2023340887142Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/09/2023340887142Open ↗
▸Trade Schedules & Equipment45
▸BISSELF-CERT PLUMBING NOTICE10
08/14/2015320707080Open ↗
08/14/2015320707080Open ↗
08/13/2015320707080Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
06/19/2015340200428Open ↗
06/08/2015320707080Open ↗
06/08/2015320707080Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
08/26/2015320844949Open ↗
08/14/2015320707080Open ↗
07/13/2015340200428Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
07/28/2015340200428Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026B08027412-I1Open ↗
▸Safety & Tenant Protection15
▸BISSTREET TREE CHECKLIST4
10/23/2023340887142Open ↗
05/09/2023340887142Open ↗
05/29/2015320294953Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist4
08/24/2026B08027412-P9Open ↗
08/24/2026B08027412-P2Open ↗
08/14/2026B08027412-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
07/31/2015320294953Open ↗
07/28/2015320283377Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT2
07/31/2015320294953Open ↗
07/28/2015320283377Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08027412-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08027412-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B08027412-I1Open ↗
▸Environmental & Asbestos29
▸DOB NOWOER: Notice to Proceed15
08/24/2026B08027412-P2Open ↗
08/24/2026B08027412-P9Open ↗
08/14/2026B08027412-P8Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
08/26/2026B00926949-I1Open ↗
08/13/2026B08027412-S4Open ↗
08/13/2026B08027412-S8Open ↗
Showing 3 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
10/23/2023340887142Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
12/08/2025340887142Open ↗
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
08/26/2015321088443Open ↗
08/26/2015321088443Open ↗
08/26/2015321088434Open ↗
Showing 3 of 14 on file for this type
▸BISEMERGENCY LIGHTING(IF NOT IN COMPLIANCE WITH MEMO 2/18/81)6
08/26/2015321088443Open ↗
08/26/2015321088434Open ↗
08/26/2015321088256Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B08027412-S7Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
07/16/2015320283377Open ↗
07/16/2015320283377Open ↗
07/16/2015320283377Open ↗
Showing 3 of 6 on file for this type
▸BISHYDRO FLOW TEST LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08027412-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B08027412-S1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026B08027412-S1Open ↗
▸Approvals, Objections & Sign-offs72
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/24/2026B08027412-P3Open ↗
08/24/2026B08027412-P4Open ↗
08/24/2026B08027412-P5Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
07/14/2015321166260Open ↗
07/14/2015321166260Open ↗
04/21/2015321088256Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
08/26/2015320283377Open ↗
07/31/2015320707080Open ↗
07/31/2015320294953Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
08/27/2015321088434Open ↗
07/31/2015320294953Open ↗
06/11/2015320707080Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
06/29/2015320283377Open ↗
06/29/2015320283377Open ↗
06/29/2015320283377Open ↗
Showing 3 of 7 on file for this type
▸BISFLAME SPREAD/FIRE LETTER6
08/26/2015321088443Open ↗
08/26/2015321088434Open ↗
08/26/2015321088256Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT13
09/21/2015321164235Open ↗
07/31/2015320707080Open ↗
07/28/2015340200428Open ↗
Showing 3 of 13 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms44
▸BISADDITIONAL INFORMATION22
11/02/2023340887142Open ↗
10/23/2023340887142Open ↗
10/23/2023340887142Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING COVER SHEET16
09/21/2015321164235Open ↗
07/14/2015321166260Open ↗
Showing 2 of 16 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT33
05/09/2023340887142Open ↗
Showing 1 of 3 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
05/09/2023340887142Open ↗
Showing 1 of 3 on file for this type
▸Other Documents47
▸DOB NOWPlot Diagram11
08/24/2026B08027412-P9Open ↗
08/24/2026B08027412-P2Open ↗
08/14/2026B08027412-P8Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATISFACTION7
07/17/2015320294953Open ↗
07/08/2015320294953Open ↗
07/08/2015340200428Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
10/23/2023340887142Open ↗
05/09/2023340887142Open ↗
02/02/2023321093696Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/24/2026B08027412-P9Open ↗
08/24/2026B08027412-P2Open ↗
08/14/2026B08027412-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/24/2026B08027412-P9Open ↗
08/24/2026B08027412-P2Open ↗
08/14/2026B08027412-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026B08027412-P9Open ↗
08/24/2026B08027412-P2Open ↗
08/14/2026B08027412-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISECCCNYS Analysis3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026B08027412-S1Open ↗
08/13/2026B08027412-S3Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B08027412-I1Open ↗