2021Year Built
2Stories
A1Building Class
R3XZoning
2,200 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Basement1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STANLEY M. KREBUSHEVSKI, R.A.404/08/2022
WILLIAM MONTAGUE ENGINEER201/24/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASTER BUILT HOMES INCGeneral Contractor603/21/2026
JB BUZCO PLUMBING LLCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677404/08/2022
A TECH ENGINEERING NYC, P6738203/04/2022
Building Lifecycle
All (54)Filed (6)Permit Issued (4)Signed Off (3)Inspection (9)Objection (2)Special Inspection (30)
05/18/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/12/2022
Signed off — Alteration
Plumbing work filed in conjunction with new building application #S00493287.
S00346700-I1
05/03/2022
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Ventilation and air distribution system
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Metering
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Mechanical Systems
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
05/03/2022
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Final
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
04/08/2022
Filed — New Building
Construct a one family residence with built-in two car garage.
S00493287-P1
04/01/2022
Signed off — Alteration
8' curb cut proposed.
S00346616-I1
03/24/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/22/2022
Signed off — Alteration
S00572460-I1
03/14/2022
Permit issued — Curb Cut
S00346616-I1-CC
03/07/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/07/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
03/07/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
03/04/2022
Filed — Alteration
Plumbing work filed in conjunction with new building application #S00493287.
S00346700-P1
02/24/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/18/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
02/18/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
01/24/2022
Filed — Alteration
8' curb cut proposed.
S00346616-I1
01/13/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/11/2022
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
01/07/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/18/2021
Permit issued — Plumbing
S00572460-I1-PL
09/22/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/06/2021
Filed — Alteration
S00572460-I1
08/06/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/06/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/29/2021
Permit issued — Plumbing
S00346700-I1-PL
07/13/2021
Permit issued — Mechanical Systems
S00493287-I1-GC-CX
06/30/2021
Filed — Alteration
Plumbing work filed in conjunction with new building application #S00493287.
S00346700-I1
04/13/2021
Objection raised — Scope
04/13/2021
Objection resolved — Addressed
04/02/2021
Filed — New Building
Construct a one family residence with built-in two car garage.
S00493287-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMASTER BUILT HOMES INC03/14/2022
DOB NOWPlumbingSigned-offJB BUZCO PLUMBING LLC10/18/2021
DOB NOWPlumbingSigned-offJB BUZCO PLUMBING LLC07/29/2021
DOB NOWMechanical SystemsPermit IssuedMASTER BUILT HOMES INC07/13/2021
1 project · most recent 04/08/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/08/2022Permit IssuedMASTER BUILT HOMES INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman DSXC 20036 35,000 BTU · Condensing Unit ×2
Heating
Goodman GMVM9 40,000 BTU · Furnace ×1
Ventilation
Honeywell True Fresh 70 CFM · Erv ×1
1 project · most recent 10/05/2021
General Wiring
FiledStatusContractorScope
10/05/2021CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
1 project · most recent 04/08/2022
Wood
FiledStatusContractorScope
04/08/2022Permit IssuedMASTER BUILT HOMES INCWood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/18/2022Pass-Final CND-Occupancy InspectionPassView ↗
03/24/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
02/24/2022Pass-Final CND-Occupancy InspectionPassView ↗
01/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/11/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
01/07/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
09/22/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/06/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/06/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/03/2022Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
05/03/2022Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
05/03/2022MeteringWILLIAM MONTAGUEenergy_progress
05/03/2022Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
05/03/2022Subgrade InspectionsWILLIAM MONTAGUEspecial
05/03/2022Mechanical SystemsWILLIAM MONTAGUEspecial
05/03/2022Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
05/03/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/03/2022Footing and FoundationWILLIAM MONTAGUEprogress
05/03/2022FinalWILLIAM MONTAGUEprogress
05/03/2022Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
05/03/2022Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
05/03/2022Structural Wood FrameWILLIAM MONTAGUEprogress
05/03/2022Permanent certificateWILLIAM MONTAGUEenergy_progress
05/03/2022HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
05/03/2022Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
05/03/2022HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
05/03/2022Fenestration areasWILLIAM MONTAGUEenergy_progress
05/03/2022Fenestration air leakageWILLIAM MONTAGUEenergy_progress
05/03/2022Interior lighting powerWILLIAM MONTAGUEenergy_progress
05/03/2022HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
05/03/2022Maintenance informationWILLIAM MONTAGUEenergy_progress
05/03/2022Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
05/03/2022Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
05/03/2022Air barrier — testing WILLIAM MONTAGUEenergy_progress
Latest 25 of 31.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch3
08/25/2026S00572460-I1Request digital key ↗
08/24/2026S00493287-P1Request digital key ↗
08/14/2026S00493287-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026S00346700-I1Request digital key ↗
08/25/2026S00346700-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/24/2026S00346616-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026S00493287-I1Open ↗
08/13/2026S00493287-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026S00493287-I1Open ↗
08/13/2026S00493287-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00493287-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWSpecial Inspector Seal & Signature10
08/29/2026S00346700-P1Open ↗
08/29/2026S00346700-P1Open ↗
08/29/2026S00346700-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026S00346700-I1Open ↗
08/25/2026S00572460-I1Open ↗
08/24/2026S00493287-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/23/2026S00493287-I1Open ↗
08/23/2026S00493287-I1Open ↗
08/23/2026S00493287-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/14/2026S00493287-I1Open ↗
08/13/2026S00493287-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/14/2026S00493287-I1Open ↗
08/13/2026S00493287-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00493287-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00493287-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00493287-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00493287-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/25/2026S00346700-I1Open ↗
08/14/2026S00493287-I1Open ↗
08/13/2026S00493287-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00346700-I1Open ↗
08/13/2026S00493287-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00493287-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026S00493287-I1Open ↗
08/13/2026S00493287-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00493287-I1Open ↗