← Back
BuildNYC
Two stories - detached, small or mid-size
177 MACGREGOR AVENUE
STATEN ISLAND · BIN 5171122
💬 Discuss this project
2021Year Built
2Stories
A1Building Class
R3XZoning
2,200 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Attic3p · 1 filing · 14 docs
Floor 25p · 3 filings · 20 docs
Floor 16p · 4 filings · 20 docs
Basement1p · 1 filing · 20 docs
Sub-Basement3p · 2 filings · 16 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Stanley M. Krebushevski, R.A.404/08/2022
William Montague Engineering201/24/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Master Built HomesGeneral Contractor303/21/2026
Master Built Homesspecialty_contractor303/21/2026
JB Buzco PlumbingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677404/08/2022
A Tech Engineering NYC, P6738203/04/2022
Building Lifecycle
07/13/2022
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
S00493287-I1-GC-CX
05/18/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/12/2022
Signed off — Alteration
Plumbing work filed in conjunction with new building application #S00493287.
S00346700-I1
05/03/2022
Special inspection requirement — Metering
WILLIAM MONTAGUE
05/03/2022
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
55 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMaster Built Homes03/14/2022
DOB NOWPlumbingSigned-offJB Buzco Plumbing10/18/2021
DOB NOWPlumbingSigned-offJB Buzco Plumbing07/29/2021
DOB NOWMechanical SystemsPermit IssuedMaster Built Homes07/13/2021
1 project · most recent 04/08/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
04/08/2022Permit IssuedMaster Built HomesAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 10/05/2021
General Wiring
FiledStatusContractorScope
10/05/2021CompleteB & R Electrical ContractingGeneral Wiring
1 project · most recent 04/08/2022
Wood
FiledStatusContractorScope
04/08/2022Permit IssuedMaster Built HomesWood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/18/2022Pass-Final CND-Occupancy InspectionPassView ↗
03/24/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
02/24/2022Pass-Final CND-Occupancy InspectionPassView ↗
01/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/11/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
01/07/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
09/22/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/06/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/06/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/03/2022MeteringWILLIAM MONTAGUEenergy_progress
05/03/2022Maintenance informationWILLIAM MONTAGUEenergy_progress
05/03/2022Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
05/03/2022Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
05/03/2022Air barrier — testing WILLIAM MONTAGUEenergy_progress
05/03/2022Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
05/03/2022Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
05/03/2022Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
05/03/2022Subgrade InspectionsWILLIAM MONTAGUEspecial
05/03/2022Mechanical SystemsWILLIAM MONTAGUEspecial
05/03/2022Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
05/03/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/03/2022Footing and FoundationWILLIAM MONTAGUEprogress
05/03/2022FinalWILLIAM MONTAGUEprogress
05/03/2022Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
05/03/2022Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
05/03/2022Structural Wood FrameWILLIAM MONTAGUEprogress
05/03/2022Permanent certificateWILLIAM MONTAGUEenergy_progress
05/03/2022HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
05/03/2022Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
05/03/2022HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
05/03/2022Fenestration areasWILLIAM MONTAGUEenergy_progress
05/03/2022Fenestration air leakageWILLIAM MONTAGUEenergy_progress
05/03/2022Interior lighting powerWILLIAM MONTAGUEenergy_progress
05/03/2022HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
Latest 25 of 31.
49 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account