← Back
Primarily 2 family with 1 store or office
177 SMITH STREET
BROOKLYN · BIN 3006103
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6AZoning
4,079 sfGross Floor Area
3Units
0 Open Violations
Primarily 2 family with 1 store or office · Owner of record: AK REAL HOLDING CORP · 1,875 sf lot · 2.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof1p · 1 filing · 20 docs
Floor 324p · 2 filings · 20 docs
Floor 236p · 2 filings · 20 docs
Floor 139p · 3 filings · 20 docs
Cellar38p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY PRIME503/22/2026
BEST NY CONTRACTING303/22/2026
CONTRACTING INC BEST NY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/30/2021$2.7M—— → —$662/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PE AND CONSULTANTS NY LLC1801/09/2025
ENTHINK ENGINEERS LLC110/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
REDCUT EXPEDITING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST NY CONTRACTING INCGeneral Contractor2207/08/2026
EURO GROUP DESIGN GROUPGeneral Contractor303/21/2026
BYPASS MECHANICAL CORPPlumbing207/08/2026
PLUMBING WORKS CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PE AND CONSULTANTS NEW YO81611701/09/2025
Building Lifecycle
All (112)Filed (19)Permit Issued (12)Signed Off (4)Violation (11)Inspection (6)Objection (30)Special Inspection (30)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2025
Signed off — Alteration
Removal of interior non-load bearing partitions and related finishes as per plans. There will be no change in use, egress, or occupancy.
B08045709-I1
04/23/2025
Signed off — Alteration
Installation of new plumbing fixtures and associated piping, capping and removal of the existing gas boiler.
B00888235-I1
04/22/2025
Signed off — Alteration
HEREWITH FILE PLANS FOR INSTALLATION OF NEW SPRINKLER HEADS FOR EXISTING 3 STORY MIXED USED BUILDING. NEW COMBINED WATER SYSTEM TO SUPPLY NEW SPRINKLE SYSTEM. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00710038-I1
02/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/15/2025
Special inspection requirement — Fenestration areas
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Air barrier - visual inspection
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Footing and Foundation
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Insulation placement and R values
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Maintenance information
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Interior lighting power
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEV SRINIVAS
01/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEV SRINIVAS
01/15/2025
Special inspection requirement — Final
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Mechanical Systems
DEV SRINIVAS
01/15/2025
Special inspection requirement — Fenestration air leakage
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Interior lighting power
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Footing and Foundation
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Mechanical Systems
DEV SRINIVAS
01/15/2025
Special inspection requirement — Maintenance information
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Final
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Air barrier - visual inspection
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Fenestration areas
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Insulation placement and R values
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — Fenestration air leakage
SRINIVAS THIMMAPPA
01/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
SRINIVAS THIMMAPPA
01/09/2025
Filed — Alteration CO
HEREWITH FILE PLANS FOR ENLARGEMENT OF EXISTING 3 STORY MIX-USED BUILDING. WORK WILL INVOLVE NEW BULKHEAD, ADDITIONAL 1 STORY LOCATED AT REAR OF THE BUILDING.
B00649051-P6
01/09/2025
Special inspection requirement — Interior lighting power
SRINIVAS THIMMAPPA
01/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
SRINIVAS THIMMAPPA
12/23/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00947251-I1
12/23/2024
Objection resolved — Addressed
12/20/2024
Objection raised — Other
12/18/2024
Filed — Alteration CO
HEREWITH FILE PLANS FOR ENLARGEMENT OF EXISTING 3 STORY MIX-USED BUILDING. WORK WILL INVOLVE NEW BULKHEAD, ADDITIONAL 1 STORY LOCATED AT REAR OF THE BUILDING.
B00649051-P5
11/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2024
Filed — Alteration
Installation of new plumbing fixtures and associated piping, capping and removal of the existing gas boiler.
B00888235-P6
10/28/2024
Filed — Alteration
Installation of new plumbing fixtures and associated piping, capping and removal of the existing gas boiler.
B00888235-P5
10/10/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/09/2024
Permit issued — Foundation
B00649051-I1-FO
10/08/2024
Permit issued — Mechanical Systems
B00649051-I1-GC
09/30/2024
Permit issued — Plumbing
B00888235-I1-PL
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2024
Objection resolved — Addressed
09/16/2024
Filed — Alteration
Installation of new plumbing fixtures and associated piping, capping and removal of the existing gas boiler.
B00888235-P4
09/05/2024
Objection raised — Scope
08/28/2024
Filed — Alteration CO
HEREWITH FILE PLANS FOR ENLARGEMENT OF EXISTING 3 STORY MIX-USED BUILDING. WORK WILL INVOLVE NEW BULKHEAD, ADDITIONAL 1 STORY LOCATED AT REAR OF THE BUILDING.
B00649051-P4
07/22/2024
Filed — Alteration
HEREWITH FILE PLANS FOR INSTALLATION OF NEW SPRINKLER HEADS FOR EXISTING 3 STORY MIXED USED BUILDING. NEW COMBINED WATER SYSTEM TO SUPPLY NEW SPRINKLE SYSTEM. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00710038-P2
07/02/2024
Filed — Alteration
Installation of new plumbing fixtures and associated piping, capping and removal of the existing gas boiler.
B00888235-P3
05/08/2024
Objection resolved — Addressed
05/06/2024
Objection raised — Mechanical
05/05/2024
Filed — Alteration
HEREWITH FILE PLANS FOR INSTALLATION OF NEW SPRINKLER HEADS FOR EXISTING 3 STORY MIXED USED BUILDING. NEW COMBINED WATER SYSTEM TO SUPPLY NEW SPRINKLE SYSTEM. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00710038-P1
03/28/2024
Filed — Alteration CO
HEREWITH FILE PLANS FOR ENLARGEMENT OF EXISTING 3 STORY MIX-USED BUILDING. WORK WILL INVOLVE NEW BULKHEAD, ADDITIONAL 1 STORY LOCATED AT REAR OF THE BUILDING.
B00649051-P3
03/12/2024
Filed — Alteration
Installation of new plumbing fixtures and associated piping, capping and removal of the existing gas boiler.
B00888235-P2
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offBEST NY CONTRACTING INC10/09/2024
DOB NOWMechanical SystemsPermit IssuedBEST NY CONTRACTING INC10/08/2024
DOB NOWPlumbingSigned-offBYPASS MECHANICAL CORP09/30/2024
DOB NOWFoundationSigned-offEURO GROUP DESIGN GROUP01/03/2024
DOB NOWSidewalk ShedSigned-offBEST NY CONTRACTING INC10/16/2023
DOB NOWMechanical SystemsPermit IssuedBEST NY CONTRACTING INC09/26/2023
DOB NOWSprinklersSigned-offBLUEWATER P&H, INC09/11/2023
DOB NOWGeneral ConstructionPermit IssuedBEST NY CONTRACTING INC07/10/2023
DOB NOWPlumbingSigned-offBYPASS MECHANICAL CORP07/05/2023
DOB NOWMechanical SystemsPermit IssuedBEST NY CONTRACTING INC05/11/2023
DOB NOWFoundationPermit IssuedBEST NY CONTRACTING INC04/27/2023
DOB NOWGeneral ConstructionSigned-offBEST NY CONTRACTING INC01/18/2023
1 project · most recent 01/09/2025
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/09/2025Signed-offBEST NY CONTRACTING INCAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Trane 4TTR5060N1000AA 60,000 BTU · Condensing Unit ×4
T4TXCC007DS3HCB 60,000 BTU · Ahu ×6
T4TTR5060N1000A 60,000 BTU · Heat Pump Outdoor ×3
Lg LAN090HSV5 9,000 BTU · Ahu ×24
LMU30CHV 30,000 BTU · Vrf Outdoor ×6
Goodman LG - LMU30CHV 60,000 BTU · Condensing Unit ×2
ASPT59C14 60,000 BTU · Ahu ×3
GSZ140241 60,000 BTU · Condensing Unit ×2
Heat / Cool
Lg LAN090HSV5 10,900 BTU · Ahu ×48
LMU303HV 32,000 BTU · Vrf Outdoor ×8
LMU30CHV 32,000 BTU · Vrf Outdoor ×4
Heating
Trane TS9V2C100U4VSAD 100,000 BTU · Ahu ×6
Lg GSZ140601 32,000 BTU · Condensing Unit ×6
Goodman GSZ140601 60,000 BTU · Condensing Unit ×3
Ventilation
Air King ABFQ75 75 CFM · Exhaust Fan ×18
Panasonic FV-0811RQ1 110 CFM · Exhaust Fan ×9
1 project · most recent 05/20/2023
General Wiring
FiledStatusContractorScope
05/20/2023CompleteAE ELECTRIC INCGeneral Wiring
1 project · most recent 01/09/2025
FiledStatusContractorScope
01/09/2025Signed-offBEST NY CONTRACTING INC6 scope_items
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/07/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
01/15/2025Air barrier - visual inspectionSRINIVAS THIMMAPPAenergy_progress
01/15/2025Structural Stability – Alterations of existing buildingsDEV SRINIVASspecial
01/15/2025Mechanical SystemsDEV SRINIVASspecial
01/15/2025Footing and FoundationSRINIVAS THIMMAPPAprogress
01/15/2025FinalSRINIVAS THIMMAPPAprogress
01/15/2025Fenestration areasSRINIVAS THIMMAPPAenergy_progress
01/15/2025HVAC-R and service water heating equipmentSRINIVAS THIMMAPPAenergy_progress
01/15/2025Interior lighting powerSRINIVAS THIMMAPPAenergy_progress
01/15/2025HVAC-R and service water heating system controlsSRINIVAS THIMMAPPAenergy_progress
01/15/2025Maintenance informationSRINIVAS THIMMAPPAenergy_progress
01/15/2025HVAC-R and service water piping design and insulationSRINIVAS THIMMAPPAenergy_progress
01/15/2025Fenestration and door U-factor and product ratingsSRINIVAS THIMMAPPAenergy_progress
01/15/2025Insulation placement and R valuesSRINIVAS THIMMAPPAenergy_progress
01/15/2025Fenestration air leakageSRINIVAS THIMMAPPAenergy_progress
01/15/2025Mechanical SystemsDEV SRINIVASspecial
01/15/2025Interior lighting powerSRINIVAS THIMMAPPAenergy_progress
01/15/2025HVAC-R and service water piping design and insulationSRINIVAS THIMMAPPAenergy_progress
01/15/2025HVAC-R and service water heating system controlsSRINIVAS THIMMAPPAenergy_progress
01/15/2025Maintenance informationSRINIVAS THIMMAPPAenergy_progress
01/15/2025Fenestration air leakageSRINIVAS THIMMAPPAenergy_progress
01/15/2025HVAC-R and service water heating equipmentSRINIVAS THIMMAPPAenergy_progress
01/15/2025Fenestration areasSRINIVAS THIMMAPPAenergy_progress
01/15/2025Insulation placement and R valuesSRINIVAS THIMMAPPAenergy_progress
01/15/2025Fenestration and door U-factor and product ratingsSRINIVAS THIMMAPPAenergy_progress
01/15/2025Air barrier - visual inspectionSRINIVAS THIMMAPPAenergy_progress
Latest 25 of 92.
▾Documents — 183 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/29/2026B00710038-I1Request digital key ↗
08/29/2026B00710038-P2Request digital key ↗
08/28/2026B08045709-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram7
08/23/2026B00649051-I1Open ↗
08/23/2026B00649051-P1Open ↗
08/23/2026B00649051-P3Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications110
▸DOB NOWProgress Inspector Seal & Signature71
08/29/2026B00649051-P6Open ↗
08/29/2026B00649051-P6Open ↗
08/29/2026B00649051-P6Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/02/2026B00710038-P2Open ↗
08/29/2026B00649051-P6Open ↗
08/29/2026B00649051-P6Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/29/2026B00710038-P1Open ↗
08/29/2026B00710038-I1Open ↗
08/27/2026B00888235-P3Open ↗
Showing 3 of 19 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist7
08/23/2026B00649051-I1Open ↗
08/23/2026B00649051-P1Open ↗
08/23/2026B00649051-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/23/2026B00649051-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00888235-P6Open ↗
08/27/2026B00888235-P5Open ↗
08/27/2026B00888235-P4Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/23/2026B00649051-I1Open ↗
▸Other Documents30
▸DOB NOWSite Survey: Initial7
08/23/2026B00649051-P3Open ↗
08/23/2026B00649051-I1Open ↗
08/23/2026B00649051-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlot Diagram7
08/23/2026B00649051-P3Open ↗
08/23/2026B00649051-I1Open ↗
08/23/2026B00649051-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/23/2026B00649051-I1Open ↗
08/23/2026B00649051-P1Open ↗
08/23/2026B00649051-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/23/2026B00649051-P3Open ↗
08/23/2026B00649051-P1Open ↗
08/23/2026B00649051-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWFinal Survey1
08/23/2026B00649051-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/23/2026B00649051-I1Open ↗