← Back
Public elementary, junior or senior high
P.S. 109 Sedgwick
1771 POPHAM AVENUE · University Heights (South)-Morris Heights · BIN 2094549
💬 Discuss this project
1950Year Built
3Stories
W1Building Class
R5Zoning
70,190 sfGross Floor Area
1Units
LL97 Covered8 Open Violations 6 unresolved · 2 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 56,000 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 216p · 1 filing · 20 docs
Floor 1Under Construction3p · 1 filing · 20 docs
MezzanineUnder Construction3p · 1 filing · 20 docs
Sub-BasementUnder Construction1p · 1 filing · 20 docs
Site & exteriorUnder Construction5p · 2 filings · 20 docs
Filed — no permit issued207p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY SCHOOL CONSTRUCTION AUTHORITY303/21/2026
DEPARTMENT OF EDUCATION203/21/2026
NYC DEPARTMENT DESIGN CONSTRUC203/21/2026
NYC SCHOOL CONST AUTH203/21/2026
DEPARTMENT OF EDUCATION DSF103/21/2026
NYC SCHOOL CONSTRUCTION AUTHORIT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VELOCITY ARCHITECTURAL SERVICES PLL2210/06/2025
DSENY ENGINEERING SERVICES, PC104/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RA4403/21/2026
DSENY ENGINEERING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABC CONSTRUCTION CONT INCGeneral Contractor607/08/2026
OLYMPIC PLBG & HTG SVC INPlumbing208/04/2026
HOLDER, ANCILElectrical103/21/2026
PANTELIDIS, ALEXANDERElectrical103/21/2026
ANDREW DRAZICElectrical103/21/2026
RICHARDSON, WElectrical103/21/2026
SORTINO JOSEPHElectrical103/21/2026
PARALLEL PLBG & HTG CO INElectrical103/21/2026
GIOVANNI DITURIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061210/06/2025
MP ENGINEERS & ARCHITECTS1438206/03/2025
Building Lifecycle
All (131)Filed (23)Permit Issued (6)Violation (60)Inspection (4)Objection (8)Special Inspection (30)
08/03/2026
Permit issued — Plumbing
X01188494-I1-PL
12/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/14/2025
Violation issued (ECB, open)
Construction
10/14/2025
Violation issued (ECB, closed)
Construction
10/14/2025
Violation issued (ECB, closed)
Construction
10/14/2025
Violation issued (ECB, open)
Construction
10/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
10/06/2025
Filed — Alteration
See Contract Drawings for Scope of Work associated with New Gas Service, Tie-In, Gas Distribution Piping to existing Boiler Pilots, Disconnection of Existing Gas Service, Removal of Disconnected Gas Piping, New Gas piping Testing and Reconnection.
X01188494-P6
10/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
08/14/2025
Permit issued — Plumbing
X01188494-I1-PL
08/14/2025
Permit issued — General Construction
X01188494-S1-GC
08/14/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
08/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/07/2025
Filed — Alteration
See Contract Drawings for Scope of Work associated with New Gas Service, Tie-In, Gas Distribution Piping to existing Boiler Pilots, Disconnection of Existing Gas Service, Removal of Disconnected Gas Piping, New Gas piping Testing and Reconnection.
X01188494-P5
08/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/05/2025
Filed — Alteration
See Contract Drawings for Scope of Work associated with New Gas Service, Tie-In, Gas Distribution Piping to existing Boiler Pilots, Disconnection of Existing Gas Service, Removal of Disconnected Gas Piping, New Gas piping Testing and Reconnection.
X01188494-P4
07/31/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/07/2025
Filed — Alteration
See Contract Drawings for Scope of Work associated with New Gas Service, Tie-In, Gas Distribution Piping to existing Boiler Pilots, Disconnection of Existing Gas Service, Removal of Disconnected Gas Piping, New Gas piping Testing and Reconnection.
X01188494-P3
07/07/2025
Filed — Alteration
See Contract Drawings for Scope of Work associated with New Gas Service, Tie-In, Gas Distribution Piping to existing Boiler Pilots, Disconnection of Existing Gas Service, Removal of Disconnected Gas Piping, New Gas piping Testing and Reconnection.
X01188494-P2
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/07/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/07/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
06/17/2025
Permit issued — Construction Fence
X01208024-I1-FN
06/16/2025
Permit issued — General Construction
X01192320-I1-GC
06/16/2025
Permit issued — Mechanical Systems
X01192320-S1-GC-CX
06/06/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
06/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
06/06/2025
Special inspection requirement — Mechanical Systems
JAMES WILSON
06/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
06/04/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
06/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
06/03/2025
Filed — Alteration
Provide Partition wall between 202 and 204, Install Door/Frame at VUV Mechanical Enclosure/ Remove - Discard (1) Window segment and associated sashes, panels, prepare opening for openable louver,, remove/replace window wood sills see Contract Plans Scope.
X01192320-P1
06/03/2025
Filed — Alteration
Provide Partition wall between 202 and 204, Install Door/Frame at VUV Mechanical Enclosure/ Remove - Discard (1) Window segment and associated sashes, panels, prepare opening for openable louver,, remove/replace window wood sills see Contract Plans Scope.
X01192320-P2
06/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
06/02/2025
Special inspection requirement — Mechanical Systems
JAMES WILSON
06/02/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
05/02/2025
Filed — Alteration
See Contract Drawings for Scope of Work associated with New Gas Service, Tie-In, Gas Distribution Piping to existing Boiler Pilots, Disconnection of Existing Gas Service, Removal of Disconnected Gas Piping, New Gas piping Testing and Reconnection.
X01188494-P1
05/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/25/2025
Filed — Alteration
FN/PS109X - FOR TEMPORARY CONSTRUCTION EQUIPMENT (FENCE)SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB #X01188494 NO CHANGE IN USE,OCCUPANCY OR EGRES
X01208024-I1
04/01/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
03/28/2025
Objection raised — Other
03/26/2025
Objection raised — Other
03/24/2025
Objection resolved — Addressed
03/24/2025
Objection resolved — Addressed
03/21/2025
Objection raised — Other
03/21/2025
Objection raised — Other
03/17/2025
Filed — Alteration
Provide Partition wall between 202 and 204, Install Door/Frame at VUV Mechanical Enclosure/ Remove - Discard (1) Window segment and associated sashes, panels, prepare opening for openable louver,, remove/replace window wood sills see Contract Plans Scope.
X01192320-S1
03/17/2025
Filed — Alteration
Provide Partition wall between 202 and 204, Install Door/Frame at VUV Mechanical Enclosure/ Remove - Discard (1) Window segment and associated sashes, panels, prepare opening for openable louver,, remove/replace window wood sills see Contract Plans Scope.
X01192320-I1
03/11/2025
Filed — Alteration
See Contract Drawings for Scope of Work associated with New Gas Service, Tie-In, Gas Distribution Piping to existing Boiler Pilots, Disconnection of Existing Gas Service, Removal of Disconnected Gas Piping, New Gas piping Testing and Reconnection.
X01188494-S1
03/11/2025
Filed — Alteration
See Contract Drawings for Scope of Work associated with New Gas Service, Tie-In, Gas Distribution Piping to existing Boiler Pilots, Disconnection of Existing Gas Service, Removal of Disconnected Gas Piping, New Gas piping Testing and Reconnection.
X01188494-I1
03/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
01/30/2025
Filed — Alteration
X01138009-Z1
01/29/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedOLYMPIC PLBG & HTG SVC IN08/03/2026
DOB NOWPlumbingPermit IssuedOLYMPIC PLBG & HTG SVC IN08/14/2025
DOB NOWGeneral ConstructionPermit IssuedABC CONSTRUCTION CONT INC08/14/2025
DOB NOWConstruction FencePermit IssuedABC CONSTRUCTION CONT INC06/17/2025
DOB NOWGeneral ConstructionPermit IssuedABC CONSTRUCTION CONT INC06/16/2025
DOB NOWMechanical SystemsPermit IssuedABC CONSTRUCTION CONT INC06/16/2025
BISOTISSUEDN.B.A CONSTRUCTION INC10/11/2022
BISOTISSUEDN.B.A CONSTRUCTION INC05/09/2022
BISOTISSUEDFAITH CONSTRUCTION INC11/29/2019
BISPLISSUEDVARSITY PLBG AND HTG INC10/02/2018
BISOTISSUEDFAITH CONSTRUCTION INC05/18/2018
BISMHISSUEDCENTRAL MECHANICAL SYSTEMS INC05/15/2018
BISMHISSUEDCENTRAL MECHANICAL SYSTEMS INC10/18/2017
BISPLISSUEDVARSITY PLBG AND HTG INC10/18/2017
BISEQISSUEDN.B.A CONSTRUCTION INC09/12/2017
BISEQISSUEDN.B.A CONSTRUCTION INC08/23/2017
BISEQISSUEDFAITH CONSTRUCTION INC08/18/2017
BISMHISSUEDCHAPMAN & EVANS CONTRACT11/22/2016
BISMHISSUEDCHAPMAN & EVANS CONTRACT11/16/2015
BISMHISSUEDCHAPMAN & EVANS CONTRACT11/03/2015
BISSPISSUEDARISTA PLUMBING HEATING & PIPING04/21/2004
BISOTISSUEDFALCON ELECTRICAL CONTRACTING09/22/2003
BISOTISSUEDRSG CAULKING & WATERPROOFING INC06/02/1999
BISPLISSUEDA BERWIND PLUMBING AND HEATING06/02/1999
BISEQISSUEDACE SCAFFOLD CO01/06/1999
BISEQISSUEDPORTCHESTER SCAFFOLDING01/05/1999
BISOTISSUEDRSG CAULKING & WATERPROOFING INC06/15/1998
BISEQISSUEDPORTCHESTER SCAFFOLDING05/22/1998
1 project · most recent 06/03/2025
Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2025Permit IssuedABC CONSTRUCTION CONT INCOthers, Ventilation Systems
Ventilation
Titus 350RL 1,570 CFM · Exhaust Fan ×2
TMS 390 BTU ×2
— CLASSMATE CMP48BCMECSHNA12NN 1,500 CFM · Fan Coil Indoor ×2
Other
Light Streams MLS3-DI-48-400-950-35K-HTA-BW-1%-1C-1 120 kW ×12
1 project · most recent 10/06/2025
Gas
FiledStatusContractorScope
10/06/2025Permit IssuedOLYMPIC PLBG & HTG SVC INGas
7 projects · most recent 06/02/2026
General Wiring
FiledStatusContractorScope
06/02/2026CompleteKLK ELECTRIC, INCGeneral Wiring
06/02/2026Permit IssuedKLK ELECTRIC, INC—
11/25/2025CompleteANCO ELECTL CONTCTNG INC—
11/13/2025CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
04/02/2024CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
01/11/2024CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
12/14/2017CompleteSAMCO ELECTRIC CORP.General Wiring
1 project · most recent 04/25/2025
Fence
FiledStatusContractorScope
04/25/2025Permit IssuedABC CONSTRUCTION CONT INCFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/11/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
10/08/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/03/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
08/14/2025FinalGEORGE GHEBRYALprogress
08/14/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
07/31/2025FinalGEORGE GHEBRYALprogress
07/31/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
07/29/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
07/07/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
07/07/2025FinalGEORGE GHEBRYALprogress
07/07/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
07/07/2025MasonryGEORGE GHEBRYALspecial
06/06/2025FinalGEORGE GHEBRYALprogress
06/06/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/06/2025Mechanical SystemsJAMES WILSONspecial
06/04/2025Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
06/04/2025FinalGEORGE GHEBRYALprogress
06/04/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/02/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/02/2025Mechanical SystemsJAMES WILSONspecial
06/02/2025FinalGEORGE GHEBRYALprogress
05/01/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
03/07/2025Fire-Resistance Rated Construction—progress
01/29/2025Fuel-Oil Storage and Fuel-Oil Piping Systems—special
01/29/2025Heating Systems—special
01/17/2025Fire-Resistant Penetrations and Joints—special
Latest 25 of 37.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
PS109XEducation—
Project X01208024 Alteration · Permit Entire · 04/25/2025
P.S. 109EducationSub-basement, Floor 1, Mezzanine
Project X01188494 Alteration · Permit Entire · 03/11/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 166 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/20/2026X01138009-Z1Request digital key ↗
08/20/2026X01138009-S9Request digital key ↗
08/20/2026X01138009-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/20/2026X01138009-S9Open ↗
08/20/2026X01138009-I1Open ↗
08/20/2026X01138009-S1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/28/2026X01188494-P3Open ↗
09/05/2026X01192320-S1Open ↗
09/05/2026X01192320-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/28/2026X01188494-P3Open ↗
09/05/2026X01192320-S1Open ↗
08/26/2026X01188494-P5Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026X01208024-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026X01188494-I1Open ↗
08/13/2026X01188494-P3Open ↗
08/13/2026X01188494-P6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026X01192320-S1Open ↗
08/13/2026X01192320-I1Open ↗
▸Approvals, Objections & Sign-offs60
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/20/2026X01138009-S5Open ↗
08/20/2026X01138009-Z1Open ↗
08/20/2026X01138009-S9Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)23
08/19/2026X01192320-S1Open ↗
08/19/2026X01192320-I1Open ↗
08/13/2026X01138009-S2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)14
08/13/2026X01188494-I1Open ↗
08/13/2026X01188494-S1Open ↗
08/13/2026X01192320-S1Open ↗
Showing 3 of 14 on file for this type
▸Other Documents31
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal23
08/19/2026X01192320-I1Open ↗
08/19/2026X01192320-S1Open ↗
08/13/2026X01188494-P6Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProof of Historic Building8
08/19/2026X01192320-I1Open ↗
08/13/2026X01188494-I1Open ↗
08/13/2026X01188494-P2Open ↗
Showing 3 of 8 on file for this type