← Back
BuildNYC
Walk-up apt, over six families with stores
1772 2ND AVENUE
MANHATTAN · BIN 1050240
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
C2-8Zoning
9,855 sfGross Floor Area
13Units
Rent Stabilized68 Active Violations 58 unresolved · 10 paperwork only 10 old, status unconfirmed ▸
Walk-up apt, over six families with stores · Owner of record: Neighborhood Restore HDFC · 2,542 sf lot · 3.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNeighborhood Restore HDFC2p · 2 filings · 20 docs
Floor 5Neighborhood Restore HDFC21p · 1 filing · 20 docs
Floor 4Neighborhood Restore HDFC21p · 1 filing · 20 docs
Floor 3Neighborhood Restore HDFC21p · 1 filing · 20 docs
Floor 2Neighborhood Restore HDFC21p · 1 filing · 20 docs
Floor 1Neighborhood Restore HDFCUnder Construction32p · 3 filings · 20 docs
CellarNeighborhood Restore HDFCUnder Construction58p · 5 filings · 20 docs
Site & exteriorELH ManagementUnder Construction43p · 5 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Doshi Consultant409/30/2026
Eskw/A209/22/2026
Old Structures Engineering706/14/2026
Black Sheep Engineering Group401/07/2026
Integral Engineering Services111/06/2025
AK Consulting Services207/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning803/21/2026
BMB Building Consulting803/21/2026
AK Consulting Services403/21/2026
WJ Professional Expediting Co103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Elh Construction CoGeneral Contractor1607/08/2026
CS BridgeScaffold404/09/2026
Elh Construction CoScaffold407/08/2026
Hay Mechanical SolutionsPlumbing206/28/2026
Bauer StructuresScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK Consulting Services, I6198409/30/2026
Impact Concrete & Control8641409/30/2026
Building Lifecycle
All (215)Filed (20)Permit Issued (18)Signed Off (6)Violation (60)Inspection (1)Objection (80)Special Inspection (30)
10/19/2026
Objection resolved — Resolved
10/19/2026
Objection resolved — Resolved
10/16/2026
Objection raised — Accessibility
10/16/2026
Objection raised — Accessibility
10/08/2026
Signed off — Alteration
M00819560-I1
09/30/2026
Filed — Alteration
EXISTING FUEL OIL BOILER PLANT TO BE REPLACED WITH A NEW NATURAL GAS-FIRED STEAM BOILER. PLUMBING APPLICATION FILED UNDER M01282936-I1.
M01282936-P1
09/30/2026
Filed — Alteration
EXISTING FUEL OIL BOILER PLANT TO BE REPLACED WITH A NEW NATURAL GAS-FIRED STEAM BOILER. PLUMBING APPLICATION FILED UNDER M01282936-I1.
M01282936-P2
09/29/2026
Special inspection requirement — Heating Systems
DEBABRATA BANERJEE
09/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
DEBABRATA BANERJEE
09/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
DEBABRATA BANERJEE
09/29/2026
Special inspection requirement — Post-installed Anchors
09/29/2026
Special inspection requirement — Maintenance information
DEBABRATA BANERJEE
09/29/2026
Special inspection requirement — Maintenance information
DEBABRATA BANERJEE
09/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
DEBABRATA BANERJEE
09/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
DEBABRATA BANERJEE
09/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEBABRATA BANERJEE
09/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEBABRATA BANERJEE
09/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
DEBABRATA BANERJEE
09/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
DEBABRATA BANERJEE
09/22/2026
Filed — Alteration
THIS APPLICATION IS FOR ALT TYPE II ALTERATION OF AN EXISTING BUILDING COMPRISING A NEW FIREPROOF FIRE PASSAGE AT CELLAR & 1ST FL WITH NEW INTERIOR & EXTERIOR STAIRS FROM REAR YARD LEADING TO STREET; NEW MINOR PARTITION AND FINISH WORKS AS PER PLAN.
M00813234-P1
09/11/2026
Special inspection requirement — Sprayed fire-resistant materials
09/09/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/08/2026
Special inspection requirement — Energy Code Compliance Inspections
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Interior lighting power
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Insulation placement and R values
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Fenestration air leakage
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Fenestration areas
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/08/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Lighting controls
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Masonry
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Air barrier - visual inspection
DEBABRATA BANERJEE
09/08/2026
Special inspection requirement — Protection of exposed foundation insulation
DEBABRATA BANERJEE
08/27/2026
Signed off — Alteration
Partial removal of existing cellar slab and soil excavation, reinforcing of existing top sub-grade soil layer, installation of new deep foundation steel piles and wall brackets as per plans filed herewith. No change to use egress or occupancy.
M00501017-I1
08/08/2026
Violation issued (HPD, open)
B
08/06/2026
Signed off — Alteration
Structural work filed for repair (repointing, crack infill etc) the existing walls of the superstructure masonry walls. No change in use, egress or occupancy.
M00565609-I1
08/05/2026
Objection resolved — Resolved
06/23/2026
Objection raised — Other
06/15/2026
Signed off — Alteration
Partial removal of existing cellar slab and soil excavation, reinforcing of existing top sub-grade soil layer, installation of new deep foundation steel piles and wall brackets as per plans filed herewith. No change to use egress or occupancy.
M00501017-S2
06/14/2026
Filed — Alteration
Partial removal of existing cellar slab and soil excavation, reinforcing of existing top sub-grade soil layer, installation of new deep foundation steel piles and wall brackets as per plans filed herewith. No change to use egress or occupancy.
M00501017-P4
06/04/2026
Filed — Alteration
Partial removal of existing cellar slab and soil excavation, reinforcing of existing top sub-grade soil layer, installation of new deep foundation steel piles and wall brackets as per plans filed herewith. No change to use egress or occupancy.
M00501017-P3
05/26/2026
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01278313-I1
05/26/2026
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01278310-I1
05/05/2026
Permit issued — Foundation
M00501017-I1-FO
04/23/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/02/2026
Permit issued — General Construction
M00813234-I1-GC
04/01/2026
Permit issued — Structural
M00819560-I1-ST
04/01/2026
Permit issued — Construction Fence
M01250234-I1-FN
04/01/2026
Permit issued — Structural
M00565609-I1-ST
03/30/2026
Permit issued — Sidewalk Shed
M01278310-I1-SH
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/27/2026
Permit issued — Protection and Mechanical Methods
M00501017-S2-PMM
01/07/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01278313-P1
01/07/2026
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01278310-P1
Latest 60 of 215 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offElh Construction Co05/05/2026
DOB NOWGeneral ConstructionPermit IssuedElh Construction Co04/02/2026
DOB NOWStructuralSigned-offElh Construction Co04/01/2026
DOB NOWConstruction FencePermit IssuedElh Construction Co04/01/2026
DOB NOWStructuralSigned-offElh Construction Co04/01/2026
DOB NOWSidewalk ShedSigned-offCS Bridge03/30/2026
DOB NOWProtection and Mechanical MethodsSigned-offBauer Structures01/27/2026
DOB NOWBoiler EquipmentPermit IssuedHay Mechanical Solutions11/18/2025
DOB NOWPlumbingPermit IssuedHay Mechanical Solutions11/12/2025
DOB NOWSidewalk ShedSigned-offCS Bridge09/12/2025
DOB NOWSupported ScaffoldSigned-offCS Bridge09/12/2025
DOB NOWFoundationSigned-offElh Construction Co07/10/2025
DOB NOWConstruction FencePermit IssuedElh Construction Co07/02/2025
DOB NOWStructuralSigned-offElh Construction Co06/18/2025
DOB NOWStructuralSigned-offElh Construction Co06/17/2025
DOB NOWGeneral ConstructionPermit IssuedElh Construction Co06/05/2025
DOB NOWGeneral ConstructionPermit IssuedElh Construction Co02/10/2025
DOB NOWGeneral ConstructionPermit IssuedElh Construction Co07/20/2023
BISEQISSUEDCS Bridge04/22/2025
BISEQISSUEDCS Bridge05/22/2024
BISEQISSUEDCS Bridge05/19/2023
BISEQISSUEDCS Bridge05/20/2022
BISEQISSUEDCS Bridge03/08/2021
BISEQISSUEDCS Bridge03/05/2020
BISOTISSUEDElh Construction Co03/02/2020
BISEQISSUEDElh Construction Co03/02/2020
BISEQISSUEDCS Bridge03/05/2019
BISOTISSUEDElh Construction Co09/06/2018
BISEQISSUEDElh Construction Co09/06/2018
BISEQISSUEDCS Bridge02/15/2018
BISPLISSUEDAjit One Mechanical & General Contracting01/30/2018
BISEQISSUEDElh Construction Co01/24/2018
BISOTISSUEDElh Construction Co01/24/2018
BISEQISSUEDCS Bridge02/23/2017
BISEQISSUEDCS Bridge03/02/2016
BISEQISSUEDCS Bridge03/13/2015
BISEQISSUEDCS Bridge03/20/2014
BISEQISSUEDCS Bridge03/18/2013
BISEQISSUEDCS Bridge03/15/2012
BISEQISSUEDCS Bridge04/01/2011
+ 6 more permits on file
1 project · most recent 09/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/30/2026Permit IssuedHay Mechanical SolutionsGas, Storm, Water/Sanitary
2 projects · most recent 09/12/2025
General Wiring
FiledStatusContractorScope
09/12/2025CompleteNash Electric Services—
07/25/2025Permit IssuedIndy ElectricGeneral Wiring
2 projects · most recent 06/14/2026
Masonry
FiledStatusContractorScope
06/14/2026Signed-offElh Construction Co3 scope_items
09/18/2024Signed-offElh Construction CoMasonry
3 projects · most recent 01/07/2026
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
01/07/2026Signed-offCS BridgeSidewalk Shed
01/07/2026Signed-offCS BridgeScaffold
07/07/2025Permit IssuedElh Construction CoFence
1 project · most recent 09/30/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/30/2026Permit IssuedHay Mechanical SolutionsTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
09/29/2026Heating SystemsDEBABRATA BANERJEEspecial
09/29/2026HVAC-R and service water heating equipmentDEBABRATA BANERJEEenergy_progress
09/29/2026Fire-Resistant Penetrations and JointsDEBABRATA BANERJEEspecial
09/29/2026HVAC-R and service water piping design and insulationDEBABRATA BANERJEEenergy_progress
09/29/2026Maintenance informationDEBABRATA BANERJEEenergy_progress
09/29/2026HVAC-R and service water heating system controlsDEBABRATA BANERJEEenergy_progress
09/29/2026Tenant Protection Plan Compliance—special
09/29/2026Post-installed Anchors—special
09/29/2026HVAC-R and service water heating equipmentDEBABRATA BANERJEEenergy_progress
09/29/2026HVAC-R and service water heating system controlsDEBABRATA BANERJEEenergy_progress
09/29/2026HVAC-R and service water piping design and insulationDEBABRATA BANERJEEenergy_progress
09/29/2026Maintenance informationDEBABRATA BANERJEEenergy_progress
09/29/2026Tenant Protection Plan Compliance—special
09/29/2026Fire-Resistant Penetrations and JointsDEBABRATA BANERJEEspecial
09/11/2026Sprayed fire-resistant materials—special
09/08/2026Fire-Resistant Penetrations and JointsDEBABRATA BANERJEEspecial
09/08/2026Fire-Resistance Rated ConstructionDEBABRATA BANERJEEprogress
09/08/2026Maintenance informationDEBABRATA BANERJEEenergy_progress
09/08/2026Protection of exposed foundation insulationDEBABRATA BANERJEEenergy_progress
09/08/2026Fenestration areasDEBABRATA BANERJEEenergy_progress
09/08/2026Interior lighting powerDEBABRATA BANERJEEenergy_progress
09/08/2026Fenestration air leakageDEBABRATA BANERJEEenergy_progress
09/08/2026Fenestration and door U-factor and product ratingsDEBABRATA BANERJEEenergy_progress
09/08/2026Lighting controlsDEBABRATA BANERJEEenergy_progress
09/08/2026Air barrier - visual inspectionDEBABRATA BANERJEEenergy_progress
Latest 25 of 92.
▾Documents — 250 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/31/2026M00819560-I1Request digital key ↗
08/31/2026M00813234-I1Request digital key ↗
08/26/2026M00565609-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits45
▸BISWORK PERMIT APPLICATION29
04/23/2025120351662Open ↗
05/22/2024120351662Open ↗
05/20/2024120351662Open ↗
Showing 3 of 29 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
05/11/2020110213876Open ↗
02/12/2020110213876Open ↗
02/05/2020110213876Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications96
▸DOB NOWProgress Inspector Seal & Signature32
10/05/2026M00813234-I1Open ↗
10/05/2026M00813234-P1Open ↗
10/05/2026M00813234-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
10/05/2026M00813234-I1Open ↗
10/05/2026M00813234-P1Open ↗
10/05/2026M00813234-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
10/05/2026M00813234-P1Open ↗
10/05/2026M01282936-P2Open ↗
10/05/2026M01282936-P1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
12/01/2010120157800Open ↗
10/14/2010120369733Open ↗
06/07/2010120369733Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
06/07/2010120369733Open ↗
05/13/2010120351662Open ↗
08/12/2009120128316Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
06/07/2010120369733Open ↗
05/13/2010120351662Open ↗
08/12/2009120128316Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING3
06/07/2010120369733Open ↗
07/01/2008110227567Open ↗
06/25/2008110213876Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
07/28/2010120369733Open ↗
07/21/2010120369733Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
10/05/2026M00813234-P1Open ↗
10/05/2026M01282936-P2Open ↗
10/05/2026M01282936-P1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
05/13/2010120351662Open ↗
09/17/2009120157800Open ↗
08/12/2009120128316Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/07/2010120369733Open ↗
▸BISASBESTOS INSPECTION REPORT1
07/01/2008110227567Open ↗
▸Inspections & Test Reports1
▸DOB NOWTR5 Test Report1
09/03/2026M00501017-I1Open ↗
▸Approvals, Objections & Sign-offs41
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
10/05/2026M00813234-P1Open ↗
10/05/2026M01282936-P2Open ↗
10/05/2026M01282936-P1Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
05/22/2024120351662Open ↗
03/06/2020120351662Open ↗
03/05/2019120351662Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
05/13/2010120351662Open ↗
09/17/2009120157800Open ↗
08/12/2009120128316Open ↗
Showing 3 of 6 on file for this type
▸BISSHED LETTER6
04/23/2025120351662Open ↗
05/22/2024120351662Open ↗
05/19/2023120351662Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
01/21/2026120351662Open ↗
12/01/2010120157800Open ↗
10/14/2010120369733Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
03/25/2013120351662Open ↗
▸BISSUPERSEDING LETTER1
02/06/2018110213876Open ↗
▸BISFINAL1
01/20/2026120351662Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT5
06/07/2010120369733Open ↗
09/17/2009120157800Open ↗
08/18/2009120080330Open ↗
Showing 3 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
10/05/2009110213876Open ↗
06/25/2009120080330Open ↗
▸Filing & Intake Forms19
▸BISBOROUGH INTAKE FORM11
04/23/2025120351662Open ↗
05/22/2024120351662Open ↗
05/20/2024120351662Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET6
06/07/2010120369733Open ↗
05/13/2010120351662Open ↗
08/12/2009120128316Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION1
02/11/2020110213876Open ↗
▸BISeFiling Job Application Cover Sheet1
06/23/2009120080330Open ↗