← Back
Two family brick
1774 PITMAN AVENUE
BRONX · BIN 2068724
💬 Discuss this project
1950Year Built
2Stories
B1Building Class
R4-1Zoning
1,620 sfGross Floor Area
2Units
Two family brick · 1,649 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 2 filings · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLOMBO ARCHITECTURAL STUDIO PC207/29/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S. TIEGER PLBG. CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLOMBO ARCHITECTURAL STU4930207/29/2022
Building Lifecycle
All (4)Filed (2)Permit Issued (1)Inspection (1)
09/01/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/10/2022
Permit issued — Plumbing
X00768428-I1-PL
07/29/2022
Filed — Alteration
REPLACE EXISTING GAS FURNACE AND GAS HOT WATER HEATER
X00773755-I1
07/27/2022
Filed — Alteration
APLICATION FILED TO REPLACE 2 EXISTING GAS METERS AT BASEMENT OF 2 FAMILY DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00768428-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS. TIEGER PLBG. CO., INC08/10/2022
1 project · most recent 07/29/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2022——Air Conditioning Systems
Cooling
American Standard AUD100C945J1 100,000 BTU · Furnace ×1
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/12/2022Final—progress
07/12/2022Mechanical SystemsYahaira Volquez Colombospecial
07/12/2022Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
07/12/2022HVAC-R and service water piping design and insulationYahaira Volquez Colomboenergy_progress
07/12/2022HVAC-R and service water heating equipmentYahaira Volquez Colomboenergy_progress
07/12/2022HVAC-R and service water heating system controlsYahaira Volquez Colomboenergy_progress
07/01/2022Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026X00768428-I1Request digital key ↗
08/24/2026X00773755-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026X00768428-I1Open ↗
08/13/2026X00773755-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026X00768428-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026X00768428-I1Open ↗
08/13/2026X00773755-I1Open ↗