1775 CONEY ISLAND AVENUE
BROOKLYN · Midwood · BIN 3429339
💬 Discuss this project
2022Year Built
8Stories
D6Building Class
R7AZoning
70,775 sfGross Floor Area
76Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 1775 Coney Island · 15,000 sf lot · 4.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects1730 Ocean Avenue Development LLC5 filings
Floor 3Temporary needle beam installation3p · 1 filing
Floor 2
Floor 11730 Ocean Avenue Development LLC2 filings
Site & exteriorSpartan Petroleum6 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1730 Ocean Avenue Development7007/08/2026
1775 Coney Island803/22/2026
Spartan Petroleum703/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/17/2020$4.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Levin Engineering812/01/2023
LMW Engineering Group310/31/2023
Studio Gallos410/23/2023
Paul Perdek, Prof. Engineering1110/20/2022
Highpoint Associates109/22/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution2203/21/2026
Levin Engineering1603/21/2026
Richard Wainer Architect1403/21/2026
Highpoint Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jacobs DevelopmentGeneral Contractor2107/08/2026
Core Scaffold SystemsScaffold1407/08/2026
Jacobs DevelopmentScaffold1107/08/2026
Rom Piping & HeatingFire Protection607/08/2026
Rom Piping & HeatingPlumbing207/08/2026
City ElectricElectrical203/21/2026
City ElectricGeneral Contractor203/22/2026
Studio GallosGeneral Contractor203/22/2026
R.C.M. ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing3941712/01/2023
Leo Y Lee Associates2481109/16/2022
Building Lifecycle
All (218)Filed (27)Permit Issued (30)Signed Off (14)Violation (30)Inspection (14)Objection (76)Special Inspection (27)
05/11/2026
Violation issued (HPD, closed)
A
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
09/27/2024
Signed off — Alteration
B00496341-S1
09/26/2024
Signed off — Alteration
B00496341-I1
08/12/2024
Signed off — Alteration
HOOD AND DUCT WORK IN THE 1ST FLOOR KITCHEN WORKING WITH COMMERICAL COOKING EQUIPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00535343-I1
08/09/2024
Signed off — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #340802073. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00535837-I1
08/07/2024
Signed off — Alteration
B00444667-I1
06/27/2024
Signed off — Alteration
B08004407-I1
12/04/2023
Objection raised — Scope
12/04/2023
Objection resolved — Addressed
12/01/2023
Filed — Alteration
HOOD AND DUCT WORK IN THE 1ST FLOOR KITCHEN WORKING WITH COMMERICAL COOKING EQUIPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00535343-P2
11/22/2023
Special inspection requirement — Duct leakage testing, insulation and design
Paul Raymond
11/22/2023
Special inspection requirement — Shutoff dampers
Paul Raymond
11/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
11/22/2023
Special inspection requirement — Heating Systems
Paul Raymond
11/22/2023
Special inspection requirement — Mechanical Systems
Paul Raymond
11/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
11/22/2023
Special inspection requirement — Final
Paul Raymond
11/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
11/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
11/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
11/22/2023
Special inspection requirement — Maintenance information
Paul Raymond
11/21/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Paul Raymond
11/21/2023
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
11/21/2023
Special inspection requirement — Footing and Foundation
Paul Raymond
11/21/2023
Special inspection requirement — Final
Paul Raymond
11/21/2023
Special inspection requirement — Structural Cold-Formed Steel
Paul Raymond
11/21/2023
Special inspection requirement — Post-installed Anchors
Paul Raymond
11/21/2023
Special inspection requirement — Subgrade Inspections
Paul Raymond
11/20/2023
Signed off — Alteration
B00566395-I1
11/20/2023
Signed off — Alteration
B00566393-I1
11/13/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/31/2023
Filed — Alteration
B00496341-P1
10/25/2023
Permit issued — Curb Cut
B00566395-I1-CC
10/25/2023
Permit issued — Curb Cut
B00566393-I1-CC
10/23/2023
Filed — Alteration
B00566395-P1
10/23/2023
Signed off — Alteration
INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #340802073. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00536712-I1
10/17/2023
Signed off — Alteration
B00586514-I1
10/10/2023
Objection resolved — Addressed
10/10/2023
Objection resolved — Addressed
10/10/2023
Objection resolved — Addressed
10/05/2023
Objection resolved — Addressed
10/04/2023
Objection raised — Fire_Protection
10/04/2023
Objection raised — Scope
10/04/2023
Objection raised — Inspections
10/04/2023
Objection raised — Scope
10/03/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
09/29/2023
Filed — Alteration
HOOD AND DUCT WORK IN THE 1ST FLOOR KITCHEN WORKING WITH COMMERICAL COOKING EQUIPMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00535343-P1
09/29/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
09/29/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/13/2023
Objection raised — Inspections
09/13/2023
Objection resolved — Addressed
09/13/2023
Objection raised — Structural
09/13/2023
Objection resolved — Addressed
09/12/2023
Permit issued — Construction Fence
B00444667-I1-FN
09/11/2023
Filed — Alteration
INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #340802073. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00536712-P1
Latest 60 of 218 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJacobs Development10/25/2023
DOB NOWCurb CutSigned-offJacobs Development10/25/2023
DOB NOWConstruction FenceSigned-offJacobs Development09/12/2023
DOB NOWPlumbingSigned-offRom Piping & Heating07/24/2023
DOB NOWSprinklersSigned-offRom Piping & Heating04/08/2023
DOB NOWStandpipeSigned-offRom Piping & Heating04/08/2023
DOB NOWStandpipeSigned-offRom Piping & Heating04/08/2023
DOB NOWMechanical SystemsSigned-offJacobs Development03/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems03/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offJacobs Development11/10/2022
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems11/09/2022
DOB NOWProtection and Mechanical MethodsSigned-offJacobs Development10/27/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems10/11/2022
DOB NOWConstruction FenceSigned-offJacobs Development09/12/2022
DOB NOWSupport of ExcavationSigned-offJacobs Development05/11/2022
DOB NOWMechanical SystemsSigned-offJacobs Development03/29/2022
DOB NOWPlumbingSigned-offRom Piping & Heating03/17/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems03/14/2022
DOB NOWGeneral ConstructionSigned-offJacobs Development02/24/2022
DOB NOWEarth WorkSigned-offJacobs Development02/24/2022
DOB NOWFoundationSigned-offJacobs Development02/24/2022
DOB NOWGeneral ConstructionSigned-offJacobs Development02/24/2022
DOB NOWStandpipeSigned-offRom Piping & Heating02/20/2022
DOB NOWStandpipeSigned-offRom Piping & Heating02/18/2022
DOB NOWSprinklersSigned-offRom Piping & Heating02/18/2022
DOB NOWConstruction FenceSigned-offJacobs Development02/09/2022
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems11/12/2021
DOB NOWConstruction FenceSigned-offJacobs Development10/13/2021
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems10/13/2021
DOB NOWConstruction FenceSigned-offJacobs Development02/02/2021
BIS—ISSUEDJacobs Development09/12/2023
BIS—ISSUEDJacobs Development12/13/2022
BIS—ISSUEDJacobs Development11/08/2022
BIS—ISSUEDJacobs Development09/09/2022
BIS—ISSUEDJacobs Development03/03/2022
BIS—ISSUEDMichelle Kuo03/11/2014
BISEQISSUEDMichelle Kuo03/11/2014
BISEQISSUEDMichelle Kuo01/03/2014
BISPLISSUEDBargain Plumbing01/02/2014
BIS—ISSUEDMichelle Kuo12/24/2013
+ 4 more permits on file
7 projects · most recent 08/18/2023
General Wiring
FiledStatusContractorScope
08/18/2023CompleteCity ElectricGeneral Wiring
01/04/2023CompleteEmpire State ElectlGeneral Wiring
09/16/2022CompleteR.C.M. Electric—
07/12/2022CompleteSolas Electrical—
07/08/2022CompleteEmpire State Electl—
10/07/2021CompleteV. Vass Electric—
09/23/2021CompleteA.L. Electrical1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
11/13/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/03/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
09/29/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
09/29/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/18/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
08/15/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/08/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/01/2022Pass-Final PL - UndergroundPassView ↗
05/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
11/22/2023Duct leakage testing, insulation and designPaul Raymondenergy_progress
11/22/2023Shutoff dampersPaul Raymondenergy_progress
11/22/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
11/22/2023Heating SystemsPaul Raymondspecial
11/22/2023Mechanical SystemsPaul Raymondspecial
11/22/2023Energy Code Compliance InspectionsPaul Raymondprogress
11/22/2023FinalPaul Raymondprogress
11/22/2023HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
11/22/2023HVAC-R and service water heating equipmentPaul Raymondenergy_progress
11/22/2023HVAC-R and service water heating system controlsPaul Raymondenergy_progress
11/22/2023Maintenance informationPaul Raymondenergy_progress
11/21/2023Excavations - Sheeting, Shoring, and BracingPaul Raymondspecial
11/21/2023Concrete - Cast-In-PlacePaul Raymondspecial
11/21/2023Footing and FoundationPaul Raymondprogress
11/21/2023FinalPaul Raymondprogress
11/21/2023Structural Cold-Formed SteelPaul Raymondspecial
11/21/2023Post-installed AnchorsPaul Raymondspecial
11/21/2023Subgrade InspectionsPaul Raymondspecial
09/08/2023Sprinkler SystemsPaul Raymondspecial
09/08/2023Standpipe SystemsPaul Raymondspecial
09/15/2022Post-installed AnchorsPaul Raymondspecial
09/15/2022Structural Stability – Alterations of existing buildingsPaul Raymondspecial
09/02/2022Structural Stability – Alterations of existing buildingsPaul Raymondspecial
09/02/2022Post-installed AnchorsPaul Raymondspecial
08/22/2022Post-installed AnchorsPaul Raymondspecial
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Spartan PetroleumIndustrial / Warehouse—
Project B00401600 Alteration · LOC Issued · 09/22/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 259 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch25
09/01/2026B00535343-P1Request digital key ↗
09/01/2026B00535837-P1Request digital key ↗
09/01/2026B00586514-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00401600-I1Request digital key ↗
09/02/2026B00444667-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION20
11/19/2024340802073Open ↗
04/10/2024300618455Open ↗
04/10/2024340109858Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION4
12/15/2022340802073Open ↗
12/07/2022340802073Open ↗
03/03/2022340802073Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Stormwater Construction Permit2
09/01/2026B00535837-P1Open ↗
08/15/2026B00535837-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/05/2023340802073Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00496341-P1Open ↗
08/13/2026B00496341-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00496341-I1Open ↗
08/13/2026B00496341-P1Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/03/2024340802073Open ↗
▸BISPD-1 WITH TOPO STAMP1
02/10/2022340802073Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/03/2021340802073Open ↗
▸BISVERIFY TAX LOT1
10/28/2023340802073Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
10/28/2023340802073Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/28/2023340802073Open ↗
▸BISZONING DIAGRAM1
02/07/2022340802073Open ↗
▸Seals & Professional Certifications60
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/02/2026B00401600-I1Open ↗
09/02/2026B00444667-I1Open ↗
09/01/2026B00536712-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
08/31/2026B00650336-P1Open ↗
08/31/2026B00650336-P1Open ↗
08/29/2026B00496341-S1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026B00535343-P2Open ↗
08/28/2026B00535343-P2Open ↗
08/28/2026B00535343-P2Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/11/2021340818413Open ↗
01/20/2021340802073Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/11/2021340818413Open ↗
01/03/2014340109858Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/03/2014340109858Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/03/2014340109858Open ↗
▸Trade Schedules & Equipment10
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00496341-I1Open ↗
08/13/2026B00496341-P1Open ↗
▸BISHEATING SYSTEMS1
10/28/2023340802073Open ↗
▸BISSTANDPIPE WORK PERMIT1
02/23/2022340802073Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
10/28/2023340802073Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
01/21/2024340802073Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/28/2023340802073Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
08/16/2021340802073Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/22/2024340802073Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
02/22/2024340802073Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
11/15/2023340818413Open ↗
01/20/2021340802073Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/23/2022340802073Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/04/2022340802073Open ↗
▸Environmental & Asbestos16
▸DOB NOWOER: Notice to Proceed9
09/01/2026B00535343-P1Open ↗
09/01/2026B00535837-P1Open ↗
08/15/2026B00535343-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/15/2026B00535343-I1Open ↗
08/15/2026B00535837-I1Open ↗
08/13/2026B00496341-S1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
02/01/2022340802073Open ↗
08/11/2021340818413Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
08/06/2024340802073Open ↗
▸Energy Compliance17
▸DOB NOWEN2: As Built Energy Analysis.4
08/15/2026B00535343-I1Open ↗
08/15/2026B00535343-I1Open ↗
08/15/2026B00535837-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/23/2022340802073Open ↗
08/04/2021340802073Open ↗
01/03/2014340109858Open ↗
▸BISFENESTRATION AIR LEAKAGE1
10/28/2023340802073Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/28/2023340802073Open ↗
▸BISINTERIOR LIGHTING POWER1
10/28/2023340802073Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/23/2022340802073Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/28/2023340802073Open ↗
▸BISFENESTRATION AREAS1
10/28/2023340802073Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
11/01/2023340802073Open ↗
▸BISNYCECC ANALYSIS1
01/03/2014340109858Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/28/2023340802073Open ↗
▸BISLIGHTING IN DWELLING UNITS1
10/28/2023340802073Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
02/23/2022340802073Open ↗
02/01/2022340802073Open ↗
08/09/2021340802073Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
10/28/2023340802073Open ↗
02/23/2022340802073Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
10/28/2023340802073Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/28/2023340802073Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/28/2023340802073Open ↗
▸BIS2008 CODE TR1 REQUIRED1
01/03/2014340109858Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026B00496341-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE9
03/28/2024340802073Open ↗
10/03/2023340802073Open ↗
07/14/2023340802073Open ↗
Showing 3 of 9 on file for this type
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE2
12/15/2022340802073Open ↗
02/23/2022340802073Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
12/07/2022340802073Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00496341-I1Open ↗
▸DOB NOWHIC License or Affidavit1
08/15/2026B00535343-I1Open ↗
▸DOB NOWCertificate of Insurance Document1
08/15/2026B00535343-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00496341-I1Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION6
03/19/2024340802073Open ↗
03/19/2024340802073Open ↗
03/19/2024340802073Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/11/2021340818413Open ↗
01/20/2021340802073Open ↗
01/03/2014340109858Open ↗
▸BISBOROUGH INTAKE FORM1
12/07/2022340802073Open ↗
▸Other Documents21
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/09/2024340818413Open ↗
08/11/2021340818413Open ↗
08/09/2021340802073Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B00496341-I1Open ↗
08/13/2026B00496341-P1Open ↗
08/13/2026B00496341-S1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00496341-I1Open ↗
08/13/2026B00496341-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00496341-P1Open ↗
08/13/2026B00496341-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00496341-I1Open ↗
08/13/2026B00496341-S1Open ↗
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
10/28/2023340802073Open ↗
▸BISSHUTOFF DAMPERS1
10/28/2023340802073Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/28/2021340802073Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
10/28/2023340802073Open ↗
▸BISVESTIBULES1
10/28/2023340802073Open ↗
▸BISMAINTENANCE INFORMATION1
10/28/2023340802073Open ↗
▸BISPERMANENT CERTIFICATE1
10/28/2023340802073Open ↗
▸BISTCO - Supporting Documents1
03/19/2024340802073Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00496341-I1Open ↗