← Back
Three families
1775 EDENWALD AVENUE
BRONX · BIN 2068591
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R4-1Zoning
2,304 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸
Three families · Owner of record: 26 R&E LLC · 2,500 sf lot · 0.92 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
26 R&E LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/10/2024$780K—NOVA PLACE HOLDINGS LLC → 26 R&E LLC$339/sf building
05/08/2024$475K—Private party → NOVA PLACE HOLDINGS LLC$206/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC108/03/2026
TABRIZ DESIGN GROUP402/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor303/21/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275202/05/2025
Building Lifecycle
All (32)Filed (5)Permit Issued (2)Signed Off (2)Violation (14)Inspection (2)Special Inspection (7)
08/03/2026
Filed — Alteration
No work proposed. Filing to record combined zoning lots 41 and 42. Tax lots to remain the same
X01438720-I1
07/30/2026
Special inspection requirement — Final
04/30/2026
Violation issued (HPD, open)
A
06/10/2025
Signed off — Alteration
GENERAL RENOVATION TO INTERIOR OF EXISTING THREE FAMILY BUILDING. REPLACEMENT OF GYPSUM WALL AND CEILING BOARDS THROUGHOUT BUILDING. AND REPLACEMENT OF BASEMENT DOORS WITH SIMILAR SIZES.
X01116542-I1
06/10/2025
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES; WATER AND SANITARY ON EXISTING AND NEW PIPING, AND GAS FIXTURES ON NEW PIPING.
X01116550-I1
06/05/2025
Violation issued (HPD, closed)
A
02/11/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
02/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
02/06/2025
Special inspection requirement — Final
HARI SONI
02/05/2025
Filed — Alteration
GENERAL RENOVATION TO INTERIOR OF EXISTING THREE FAMILY BUILDING. REPLACEMENT OF GYPSUM WALL AND CEILING BOARDS THROUGHOUT BUILDING. AND REPLACEMENT OF BASEMENT DOORS WITH SIMILAR SIZES.
X01116542-P1
02/05/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES; WATER AND SANITARY ON EXISTING AND NEW PIPING, AND GAS FIXTURES ON NEW PIPING.
X01116550-P1
02/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
02/05/2025
Special inspection requirement — Final
HARI SONI
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
11/25/2024
Violation issued (HPD, closed)
I
09/27/2024
Permit issued — Plumbing
X01116550-I1-PL
09/26/2024
Permit issued — General Construction
X01116542-I1-GC
09/24/2024
Filed — Alteration
GENERAL RENOVATION TO INTERIOR OF EXISTING THREE FAMILY BUILDING. REPLACEMENT OF GYPSUM WALL AND CEILING BOARDS THROUGHOUT BUILDING. AND REPLACEMENT OF BASEMENT DOORS WITH SIMILAR SIZES.
X01116542-I1
09/24/2024
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES; WATER AND SANITARY ON EXISTING AND NEW PIPING, AND GAS FIXTURES ON NEW PIPING.
X01116550-I1
09/06/2024
Violation issued (ECB, closed)
Unknown
09/06/2024
Violation issued (ECB, closed)
Construction
04/02/2024
Violation issued (HPD, closed)
A
11/16/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
I
04/02/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC09/27/2024
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC09/26/2024
2 projects · most recent 11/29/2024
General Wiring
FiledStatusContractorScope
11/29/2024CompleteWCK ELECTRIC CORP.General Wiring
09/12/2024CompleteWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/30/2026Final—progress
02/06/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
02/06/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
02/06/2025FinalHARI SONIprogress
02/05/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
02/05/2025FinalHARI SONIprogress
02/05/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026X01116550-I1Request digital key ↗
08/20/2026X01116550-P1Request digital key ↗
08/20/2026X01116542-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026X01116550-I1Open ↗
08/20/2026X01116550-P1Open ↗
08/20/2026X01116542-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/07/2026X01116542-P1Open ↗
08/25/2026X01116542-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/07/2026X01116542-P1Open ↗
08/25/2026X01116542-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026X01116550-P1Open ↗
08/20/2026X01116550-I1Open ↗
08/20/2026X01116542-I1Open ↗
Showing 3 of 4 on file for this type