← Back
BuildNYC
Shopping center, with or without parking
1775 SOUTH AVENUE
STATEN ISLAND · BIN 5104123
💬 Discuss this project
1990Year Built
1Stories
K6Building Class
C4-3Zoning
254,926 sfGross Floor Area
16Units
0 Active ViolationsFDNY Report ↗
Shopping center, with or without parking · Owner of record: Shore Plaza LLC C/O A · 681,100 sf lot · 0.37 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofChuck E. Cheese's, Restaurant Depot +124p · 10 filings · 20 docs
Floor 5Chuck E. Cheese's8p · 2 filings · 8 docs
Floor 4Chuck E. Cheese's8p · 2 filings · 8 docs
Floor 3Chuck E. Cheese's8p · 2 filings · 8 docs
Floor 2Burlington, Chuck E. Cheese's11p · 3 filings · 10 docs
Floor 1Chuck E. Cheese's, Golfcave Indoor Golf +3Under Construction155p · 17 filings · 20 docs
Site & exteriorGolfcave Indoor Golf, The Jewish Board +417p · 9 filings · 20 docs
Filed — no permit issued1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Shore Plaza8503/22/2026
JMDH Real Estates Offices7707/08/2026
PFNY1607/08/2026
Strategic Resources1303/21/2026
WSP Capital703/21/2026
CA 5550 Broadway603/21/2026
Wspacquist503/21/2026
Achs203/21/2026
Cec Entertainment203/21/2026
WSP Acquisition, LLC, Man Member203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
West Rac ContractingGeneral Contractor1407/08/2026
Manengeering BureauFire Protection707/08/2026
Copper ServicesPlumbing507/08/2026
Signs CadSign hanger507/08/2026
L&T ConsultantsGeneral Contractor407/08/2026
Balaton ConsultingSign hanger307/22/2026
Brighton Installation CoGeneral Contractor207/08/2026
Afgo Mechanical Servicesspecialty_contractor203/21/2026
Pat Sementa P & H CoPlumbing207/08/2026
Pro Aire Design ConsultingGeneral Contractor207/08/2026
K.i.m.co. Refrigerationspecialty_contractor203/21/2026
A1 SpecializedSign hanger207/08/2026
OM ElectricElectrical203/22/2026
Speedway PlumbingPlumbing107/08/2026
Dibenedetto Heating & Air ConditGeneral Contractor104/09/2026
Master Fire MechanicalGeneral Contractor106/28/2026
Omundsen ConstructionGeneral Contractor106/28/2026
Five Town Neon Sign CoSign hanger107/08/2026
Universal Signs & ServiceSign hanger107/08/2026
AL Plumbing & ContPlumbing107/08/2026
Capitol Fire Sprinkler CoFire Protection107/08/2026
Case PlumbingFire Protection107/08/2026
Safety Fire SprinklerFire Protection107/08/2026
Mikoma ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering8524105/18/2026
A Tech Engineering NYC, P6738101/16/2026
Tamborra Architecture5339111/18/2025
City-Wide Testing416511/05/2025
Vincent J. Liotta P. E1974409/10/2024
Whitestone Associates Engineering81441311/22/2023
Twin Peaks317109/20/2022
HRF Services5616302/18/2021
CANTAROS+ZORRILLA Architects917105/21/2020
Choi Engineering2264102/25/2020
M-Con Engineering7341108/06/2019
Building Lifecycle
All (266)Filed (56)Permit Issued (51)Signed Off (26)Violation (60)Inspection (15)Objection (28)Special Inspection (30)
06/09/2026
Permit issued — General Construction
S01220343-I1-GC
05/19/2026
Permit issued — Mechanical Systems
S01392679-I1-MS
05/19/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/18/2026
Filed — Alteration
Replace existing kitchen ventilation hood and repair related roof fan. No change to use, occupancy of egress.
S01392679-I1
05/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
05/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
04/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/24/2026
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
04/24/2026
Special inspection requirement — Final
Shahrish Shuvo
03/23/2026
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - GOLFCAVE INDOOR GOLF. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01363294-I1
03/19/2026
Signed off — Alteration
S01342902-I1
03/13/2026
Objection resolved — Addressed
03/05/2026
Permit issued — Sign
S01363294-I1-SG
03/03/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - GOLFCAVE INDOOR GOLF. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01363294-I1
03/03/2026
Special inspection requirement — Final
ADITYA DESAI
03/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/12/2026
Permit issued — Mechanical Systems
S01342902-I1-MS
01/26/2026
Objection raised — Cost
01/22/2026
Permit issued — Sprinklers
S01284885-S3-EW-SP
01/16/2026
Filed — Alteration
S01342902-I1
01/15/2026
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR THE JEWISH BOARD, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01305601-I1
12/24/2025
Objection resolved — Addressed
12/18/2025
Violation issued (FDNY_ORDER, closed)
12/18/2025
Violation issued (FDNY_ORDER, closed)
12/12/2025
Objection raised — Admin
11/18/2025
Filed — Alteration
Renovate existing UFC Space for new Pickleball Facility (The Dink Den), install new flooring and wall finishes and construct new low counter seating areas off of Pickleball Courts. Total occupancy this space is for 68 Persons
S01220343-I1
11/18/2025
Permit issued — Sign
S01279379-I1-SG
11/12/2025
Permit issued — Sign
S01305601-I1-SG
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
11/05/2025
Filed — Alteration
Installation of 33 new pendent sprinkler heads in existing space
S01284885-P1
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
11/04/2025
Filed — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR THE JEWISH BOARD, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01305601-I1
11/03/2025
Permit issued — General Construction
S01284885-I1-GC
11/03/2025
Permit issued — Mechanical Systems
S01284885-S1-MS
11/03/2025
Permit issued — Plumbing
S01284885-S2-PL
10/06/2025
Violation issued (FDNY_ORDER, closed)
10/02/2025
Filed — No Work
S01222880-I1
09/30/2025
Filed — Alteration
Installation of 33 new pendent sprinkler heads in existing space
S01284885-S3
09/30/2025
Filed — Alteration
Installation of 33 new pendent sprinkler heads in existing space
S01284885-S2
09/30/2025
Filed — Alteration
Installation of 33 new pendent sprinkler heads in existing space
S01284885-S1
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
09/24/2025
Violation issued (FDNY_ORDER, closed)
09/24/2025
Violation issued (FDNY_ORDER, closed)
09/24/2025
Violation issued (FDNY_ORDER, closed)
09/24/2025
Violation issued (FDNY_ORDER, closed)
09/22/2025
Violation issued (FDNY_NOV, closed)
09/22/2025
Violation issued (FDNY_NOV, closed)
09/16/2025
Filed — Alteration
Installation of 33 new pendent sprinkler heads in existing space
S01284885-I1
09/11/2025
Filed — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN
S01279379-I1
09/10/2025
Special inspection requirement — Sprinkler Systems
ELIAS RASABI
09/10/2025
Special inspection requirement — Mechanical Systems
ELIAS RASABI
09/10/2025
Special inspection requirement — Final
ELIAS RASABI
05/08/2025
Special inspection requirement — Public Assembly Emergency Lighting
05/04/2025
Special inspection requirement — Final
anthony santoro
05/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tamborra
05/02/2025
Violation issued (FDNY_NOV, closed)
03/31/2025
Violation issued (ECB, closed)
Construction
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 266 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offOmundsen Construction06/09/2026
DOB NOWMechanical SystemsPermit IssuedMaster Fire Mechanical05/19/2026
DOB NOWSignSigned-offMad Signs03/05/2026
DOB NOWMechanical SystemsSigned-offDibenedetto Heating Air Con02/12/2026
DOB NOWSprinklersPermit IssuedSafety Fire Sprinkler01/22/2026
DOB NOWSignPermit IssuedEnrico Passaro11/18/2025
DOB NOWSignSigned-offUniversal Signs & Service11/12/2025
DOB NOWGeneral ConstructionPermit IssuedL&T Consultants11/03/2025
DOB NOWMechanical SystemsPermit IssuedL&T Consultants11/03/2025
DOB NOWPlumbingSigned-offAL Plumbing & Cont11/03/2025
DOB NOWStandpipePermit IssuedManengeering Bureau10/30/2024
DOB NOWMechanical SystemsSigned-offAfgo Mechanical Services10/03/2024
DOB NOWMechanical SystemsSigned-offWest Rac Contracting08/20/2024
DOB NOWSignSigned-offMad Signs07/09/2024
DOB NOWPlumbingSigned-offCopper Services05/14/2024
DOB NOWMechanical SystemsSigned-offWest Rac Contracting03/04/2024
DOB NOWMechanical SystemsSigned-offWest Rac Contracting01/19/2024
DOB NOWPlumbingSigned-offCopper Services11/01/2023
DOB NOWSignSigned-offSigns Cad09/15/2023
DOB NOWSignSigned-offSigns Cad09/14/2023
DOB NOWMechanical SystemsSigned-offWest Rac Contracting09/14/2023
DOB NOWSignSigned-offSigns Cad09/14/2023
DOB NOWGeneral ConstructionSigned-offWest Rac Contracting09/14/2023
DOB NOWStructuralSigned-offWest Rac Contracting09/14/2023
DOB NOWSprinklersSigned-offManengeering Bureau08/22/2023
DOB NOWStandpipePermit IssuedManengeering Bureau08/22/2023
DOB NOWPlumbingSigned-offCopper Services07/26/2023
DOB NOWBoiler EquipmentSigned-offStar Industrial Service07/25/2023
DOB NOWStandpipePermit IssuedManengeering Bureau06/30/2023
DOB NOWSprinklersSigned-offManengeering Bureau06/30/2023
DOB NOWSprinklersSigned-offManengeering Bureau01/10/2023
DOB NOWStandpipePermit IssuedManengeering Bureau01/10/2023
DOB NOWPlumbingSigned-offCopper Services11/10/2022
DOB NOWSignSigned-offSigns Cad11/03/2022
DOB NOWSignSigned-offSigns Cad11/01/2022
DOB NOWMechanical SystemsSigned-offWest Rac Contracting08/31/2022
DOB NOWStructuralSigned-offWest Rac Contracting08/30/2022
DOB NOWPlumbingSigned-offCopper Services08/25/2022
DOB NOWGeneral ConstructionSigned-offWest Rac Contracting07/15/2022
DOB NOWSignSigned-offNorth Shore Neon Sign Co04/08/2022
+ 60 more permits on file
2 projects · most recent 05/18/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2026Permit IssuedMaster Fire MechanicalVentilation Systems
Ventilation
__Junk__ V Bank Hood Type 1 2,400 CFM · Kitchen Exhaust ×1
11/05/2025Permit IssuedL&T ConsultantsVentilation Systems
Ventilation
Greenheck Greenheck SP-LP0810W 100 CFM · Exhaust Fan ×3
3 projects · most recent 11/05/2025
FiledStatusContractorScope
11/05/2025Permit IssuedSafety Fire Sprinkler33 heads
11/21/2023Permit IssuedManengeering Bureau1,126 heads, 4 outlets
————
1 project · most recent 11/05/2025
Water/Sanitary
FiledStatusContractorScope
11/05/2025Signed-offAL Plumbing & ContWater/Sanitary
12 projects · most recent 03/05/2026
General Wiring
FiledStatusContractorScope
03/05/2026CompleteAll Pro Electric of N.Y—
11/04/2025CompleteInfinity ElectricGeneral Wiring
07/08/2024CompleteAnco Electl Contctng—
01/03/2024CompleteMikoma ElectricGeneral Wiring
08/17/2023CompleteSigns Cad—
08/09/2023CompleteSigns Cad—
08/09/2023CompleteSigns Cad—
02/14/2023CompleteSigns Cad—
02/14/2023CompleteSigns Cad—
10/22/2021CompleteOM ElectricGeneral Wiring
10/22/2021CompleteOM ElectricGeneral Wiring
10/22/2021CompleteOM ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/19/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/26/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/26/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/23/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/13/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
05/11/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
05/11/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
04/24/2026Mechanical SystemsShahrish Shuvospecial
04/24/2026FinalShahrish Shuvoprogress
03/03/2026FinalADITYA DESAIprogress
11/07/2025Fire-Resistant Penetrations and JointsELIAS RASABIspecial
11/05/2025Fire-Resistant Penetrations and JointsELIAS RASABIspecial
09/30/2025Fire-Resistant Penetrations and JointsELIAS RASABIspecial
09/10/2025Mechanical SystemsELIAS RASABIspecial
09/10/2025Sprinkler SystemsELIAS RASABIspecial
09/10/2025FinalELIAS RASABIprogress
05/08/2025Public Assembly Emergency Lighting—progress
05/04/2025Fire-Resistant Penetrations and JointsNicholas Tamborraspecial
05/04/2025Finalanthony santoroprogress
09/09/2024Maintenance informationVincent Liottaenergy_progress
09/09/2024HVAC-R and service water heating equipmentVincent Liottaenergy_progress
09/09/2024HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
09/09/2024HVAC-R and service water heating system controlsVincent Liottaenergy_progress
08/22/2024Mechanical SystemsVincent Liottaspecial
08/22/2024FinalVincent Liottaprogress
07/10/2024Public Assembly Emergency LightingJames Hamillprogress
07/02/2024FinalADITYA DESAIprogress
12/12/2023Mechanical SystemsMudar Khantamrspecial
12/12/2023Sprinkler SystemsMudar Khantamrspecial
12/12/2023Fire-Resistant Penetrations and JointsMudar Khantamrspecial
Latest 25 of 97.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Chuck E. Cheese'sRestaurant / Food ServiceFloors 1–5, Roof
Project S01392679 Alteration · Permit Entire · 05/18/2026
Project S00905075 Alteration · LOC Issued · 07/29/2023
Project S00905078 Alteration · LOC Issued · 07/29/2023
Project S00905082 Alteration · LOC Issued · 07/29/2023
Project S00615388 No Work · PA Certificate of Operation Issued · 10/20/2021
Project S00298021 Alteration · LOC Issued · 02/25/2020
Golfcave Indoor GolfFitness / RecreationFloor 1
Project S01363294 Alteration · LOC Issued · 03/03/2026
Project S01284885 Alteration · Permit Entire · 09/16/2025
The Jewish BoardOffice—
Project S01305601 Alteration · LOC Issued · 11/04/2025
BurlingtonRetailFloors 1, 2
Project S01279379 Alteration · Permit Entire · 09/11/2025
Project S00698484 Alteration · LOC Issued · 04/07/2022
Project S00698489 Alteration · LOC Issued · 04/07/2022
Project S00698495 Alteration · LOC Issued · 04/07/2022
The Dink DenSports / Recreation—
Project S01064720 Alteration · LOC Issued · 07/03/2024
Restaurant DepotRetailCellar, Floor 1
Project S00823430 Alteration · LOC Issued · 02/15/2023
Project S08043351 Alteration · Permit Entire · 11/22/2022
Project S08029857 Alteration · LOC Issued · 11/01/2022
Project S08029872 Alteration · LOC Issued · 11/01/2022
Project S08006766 Alteration · Filing Withdrawn · 09/20/2022
Project S00732923 Alteration · LOC Issued · 05/25/2022
Project S00732969 Alteration · LOC Issued · 05/25/2022
Project S00732901 Alteration · LOC Issued · 05/19/2022
Planet FitnessFitness / RecreationRoof
Project S00408449 Alteration · LOC Issued · 01/11/2021
Panda ExpressRestaurant / Food ServiceFloor 1
Project S00200273 Alteration · LOC Issued · 08/06/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 911 on file (BIS + DOB NOW)
▸Plans & Drawings59
▸DOB NOWPlans/Sketch48
08/26/2026S00001483-I1Request digital key ↗
08/25/2026S00510726-I1Request digital key ↗
08/24/2026S00698489-I1Request digital key ↗
Showing 3 of 48 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
08/26/2026S00259470-I1Request digital key ↗
08/26/2026S00298021-I1Request digital key ↗
08/25/2026S00408449-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/25/2026S00615388-I1Request digital key ↗
08/21/2026S01079047-I1Request digital key ↗
08/18/2026S01222880-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026S00200273-I1Request digital key ↗
08/26/2026S00350002-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026S00263316-I1Request digital key ↗
▸Applications & Permits172
▸BISPLAN / WORK APPROVAL APPLICATION109
11/01/2024500577994Open ↗
11/01/2024500577994Open ↗
10/30/2024500742841Open ↗
Showing 3 of 109 on file for this type
▸BISWORK PERMIT APPLICATION54
06/11/2019520375709Open ↗
06/06/2019520326068Open ↗
05/31/2019520375709Open ↗
Showing 3 of 54 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1135
07/05/2023500706051Open ↗
07/05/2023500706042Open ↗
07/05/2023500706033Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications276
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION73
11/01/2019520308382Open ↗
05/31/2019520375709Open ↗
05/31/2019520375709Open ↗
Showing 3 of 73 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature60
08/26/2026S00200273-I1Open ↗
08/26/2026S00263316-I1Open ↗
08/25/2026S00408449-P1Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWProgress Inspector Seal & Signature49
09/23/2026S01284885-S1Open ↗
09/02/2026S01064720-I1Open ↗
09/01/2026S01100385-I1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/23/2026S00823430-I1Open ↗
09/23/2026S01284885-S3Open ↗
09/23/2026S01284885-S1Open ↗
Showing 3 of 38 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
09/12/2017520307882Open ↗
Showing 1 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
09/12/2017520307882Open ↗
Showing 1 of 11 on file for this type
▸BISPC FULL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment76
▸BISEQUIPMENT USE APPLICATION/PERMIT18
03/13/2019540129092Open ↗
01/24/2018520245707Open ↗
01/24/2018520245707Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
10/02/2019520375709Open ↗
03/15/2019520375709Open ↗
11/09/2017520307882Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE PERMITS13
03/13/2019540129092Open ↗
01/24/2018520245707Open ↗
01/24/2018520245707Open ↗
Showing 3 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
02/06/2019520301227Open ↗
08/30/2018520301227Open ↗
08/03/2018520283531Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/24/2018520245707Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos29
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
03/15/2019520375709Open ↗
Showing 1 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026S00200273-I1Open ↗
08/25/2026S00408449-P1Open ↗
08/25/2026S00408449-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance45
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
11/01/2019520308382Open ↗
05/31/2019520375709Open ↗
03/15/2019520375709Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
09/24/2021520375709Open ↗
11/01/2019520308382Open ↗
02/28/2019540129092Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/24/2021520375709Open ↗
09/24/2021520375709Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification4
08/13/2026S00259470-I1Open ↗
08/13/2026S00408449-I1Open ↗
08/13/2026S00510726-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00510726-I1Open ↗
08/13/2026S00732901-I1Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEMERGENCY LIGHTING (IF NOT IN COMPLIANCE WITH MEMEO 2-18-81)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/24/2021520375709Open ↗
09/24/2021520375709Open ↗
Showing 2 of 4 on file for this type
▸BISCertificate of Inspection Construct Manhole or Catch Basin and Basin Connection1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHydrant Flow Test Letter1
08/26/2026S00350002-I1Open ↗
▸Approvals, Objections & Sign-offs97
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST46
04/18/2024500708264Open ↗
04/18/2024520024624Open ↗
09/24/2021520375709Open ↗
Showing 3 of 46 on file for this type
▸BISADMINISTRATIVE OBJECTIONS37
03/15/2019520375709Open ↗
02/05/2018520326068Open ↗
08/22/2017520273711Open ↗
Showing 3 of 37 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
10/16/2024500052827Open ↗
10/16/2024500052827Open ↗
10/16/2024500041581Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
01/25/2018520245707Open ↗
▸BISLetter from Homeowner for Withdrawal1
10/09/2019520326068Open ↗
▸BISLETTERS - SUPPORTING DOCUMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership74
▸BISCOST AFFIDAVIT70
09/24/2021520375709Open ↗
11/01/2019520308382Open ↗
03/15/2019520375709Open ↗
Showing 3 of 70 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/16/2024520024624Open ↗
▸Filing & Intake Forms65
▸BISEFILING COVER SHEET32
03/15/2019520375709Open ↗
03/15/2019520375709Open ↗
03/15/2019520375709Open ↗
Showing 3 of 32 on file for this type
▸BISBOROUGH INTAKE FORM17
11/01/2019520308382Open ↗
10/16/2019520308382Open ↗
10/09/2019520326068Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION14
10/02/2019520375709Open ↗
10/02/2019520375709Open ↗
05/22/2018520273711Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBSA VARIANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHydraulic Calculations1
08/13/2026S00350002-I1Open ↗
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation1
08/13/2026S00001483-I1Open ↗