1776 STORY AVENUE
BRONX · BIN 2092748
💬 Discuss this project
1959Year Built
14Stories
D3Building Class
R6Zoning
799,710 sfGross Floor Area
827Units
LL97 Covered6 Active Violations 1 unresolved · 5 paperwork only ▸
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 1,040,000 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1NYC Housing Authority20p · 2 filings · 20 docs
CellarNYC Housing AuthorityUnder Construction17p · 2 filings · 20 docs
Sub-CellarDemolish and remove existing equipment and pipingUnder Construction2p · 1 filing · 17 docs
Site & exteriorNYCHA Monroe Houses pipe scaffold13p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority3907/19/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYCHA210/01/2025
W Vance Barnes PE308/22/2024
Dewberry Engineers309/18/2023
Ronnette Riley Architect107/26/2023
Bitopi Consultants110/19/2022
AK Consulting Services110/06/2022
Ikra Consulting110/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Phillips403/21/2026
AK Consulting Services603/21/2026
New York City Housing Authority203/21/2026
KM Associates of New York203/21/2026
Loring Consulting Engineers203/21/2026
K & M Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S & N BuildersGeneral Contractor707/19/2026
Roma ScaffoldingScaffold707/08/2026
Kordun ConstructionGeneral Contractor207/08/2026
Gilston Electrical ContngElectrical103/22/2026
R.A. Phillips Electrical ContElectrical103/21/2026
Hylan Datacom & ElectricalElectrical103/22/2026
Kordun ConstructionPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423210/01/2025
Future Tech Consultants O589308/22/2024
Bitopi Consultants7036110/19/2022
Building Lifecycle
All (78)Filed (12)Permit Issued (12)Signed Off (4)Violation (10)Objection (10)Special Inspection (30)
09/01/2026
Signed off — Alteration
General interior renovation for the Community Center. No change in uses, means of egress or occupancy under this application.
X00487734-I1
07/17/2026
Permit issued — General Construction
X00487734-I1-GC
01/05/2026
Permit issued — Structural
X01037351-S2-ST
12/11/2025
Permit issued — Mechanical Systems
X01037351-I1-MS
12/10/2025
Permit issued — Plumbing
X01037351-S1-PL
11/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
11/13/2025
Special inspection requirement — Final
Young Suh
11/13/2025
Special inspection requirement — Air barrier - visual inspection
Young Suh
11/13/2025
Special inspection requirement — Insulation placement and R values
Young Suh
11/13/2025
Special inspection requirement — Interior lighting power
Young Suh
11/13/2025
Special inspection requirement — Lighting controls
Young Suh
11/13/2025
Special inspection requirement — Post-installed Anchors
Young Suh
11/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
11/06/2025
Objection resolved — Addressed
11/06/2025
Objection resolved — Addressed
11/06/2025
Objection resolved — Addressed
11/06/2025
Objection resolved — Addressed
10/06/2025
Objection raised — Admin
10/06/2025
Objection raised — Scope
10/06/2025
Objection raised — Admin
10/06/2025
Objection raised — Admin
10/01/2025
Filed — Alteration
General interior renovation for the Community Center. No change in uses, means of egress or occupancy under this application.
X00487734-P2
10/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
10/01/2025
Special inspection requirement — Interior lighting power
Young Suh
10/01/2025
Special inspection requirement — Air barrier - visual inspection
Young Suh
10/01/2025
Special inspection requirement — Lighting controls
Young Suh
10/01/2025
Special inspection requirement — Insulation placement and R values
Young Suh
10/01/2025
Special inspection requirement — Final
Young Suh
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
10/01/2025
Special inspection requirement — Post-installed Anchors
Young Suh
06/24/2025
Permit issued — General Construction
X00487734-I1-GC
08/22/2024
Filed — Alteration
provide new concrete pads for new Condensate return units and columns repairs as per plans.
X01037351-S1
08/16/2024
Objection raised — Other
08/16/2024
Objection resolved — Addressed
08/12/2024
Filed — Alteration
provide new concrete pads for new Condensate return units and columns repairs as per plans.
X01037351-S2
08/08/2024
Filed — Alteration
provide new concrete pads for new Condensate return units and columns repairs as per plans.
X01037351-I1
06/30/2024
Special inspection requirement — Post-installed Anchors
MARISA HARTE
06/24/2024
Permit issued — General Construction
X00487734-I1-GC
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
04/17/2024
Special inspection requirement — Final
MARISA HARTE
09/18/2023
Filed — Alteration
replace (6) WC, (1) urinal (5) lavatories, (1) mop sink, (1) hand sink, (1) kitchen triple compartment sink, (1) Dishwasher, (3) floor drains, (2) drinking fountains with filler
X00884924-S4
09/13/2023
Filed — Alteration
replace (6) WC, (1) urinal (5) lavatories, (1) mop sink, (1) hand sink, (1) kitchen triple compartment sink, (1) Dishwasher, (3) floor drains, (2) drinking fountains with filler
X00884924-S5
09/12/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1776 STORY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X08012743-I1
09/12/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 1776 STORY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X08023782-I1
09/08/2023
Filed — Alteration
replace (6) WC, (1) urinal (5) lavatories, (1) mop sink, (1) hand sink, (1) kitchen triple compartment sink, (1) Dishwasher, (3) floor drains, (2) drinking fountains with filler
X00884924-S3
08/31/2023
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 1776 STORY AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X08012730-I1
08/02/2023
Special inspection requirement — Structural Steel - Welding
08/02/2023
Special inspection requirement — Structural Steel - High Strength Bolting
08/02/2023
Special inspection requirement — Structural Steel - Details
08/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/02/2023
Special inspection requirement — Heating Systems
08/02/2023
Special inspection requirement — High-Pressure Steam Piping (Welding)
08/02/2023
Special inspection requirement — Smoke Control Systems Testing
08/02/2023
Special inspection requirement — Energy Code Compliance Inspections
08/02/2023
Special inspection requirement — Chimneys and vents
08/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/26/2023
Filed — Alteration
replace (6) WC, (1) urinal (5) lavatories, (1) mop sink, (1) hand sink, (1) kitchen triple compartment sink, (1) Dishwasher, (3) floor drains, (2) drinking fountains with filler
X00884924-I1
07/24/2023
Special inspection requirement — Mechanical Systems
06/26/2023
Permit issued — General Construction
X00487734-I1-GC
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offS & N Builders07/17/2026
DOB NOWStructuralPermit IssuedKordun Construction01/05/2026
DOB NOWMechanical SystemsPermit IssuedKordun Construction12/11/2025
DOB NOWPlumbingPermit IssuedKordun Construction12/10/2025
DOB NOWGeneral ConstructionSigned-offS & N Builders06/24/2025
DOB NOWGeneral ConstructionSigned-offS & N Builders06/24/2024
DOB NOWGeneral ConstructionSigned-offS & N Builders06/26/2023
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding10/20/2022
DOB NOWSidewalk ShedSigned-offRoma Scaffolding10/06/2022
DOB NOWConstruction FenceSigned-offRoma Scaffolding10/06/2022
DOB NOWGeneral ConstructionSigned-offS & N Builders07/27/2022
DOB NOWGeneral ConstructionSigned-offS & N Builders08/25/2021
BISPLISSUEDVarsity Plumbing and Heating07/29/2025
BISMHISSUEDS & N Builders06/23/2025
BISPLISSUEDVarsity Plumbing and Heating07/05/2024
BISMHISSUEDS & N Builders06/22/2024
BISPLISSUEDVarsity Plumbing and Heating07/13/2023
BISMHISSUEDS & N Builders06/25/2023
BISMHISSUEDS & N Builders02/14/2023
BISOTISSUEDRoma Scaffolding02/06/2023
BISPLISSUEDVarsity Plumbing and Heating07/22/2022
BISOTISSUEDRoma Scaffolding06/24/2022
BISPLISSUEDVarsity Plumbing and Heating07/19/2021
BISFPISSUEDAllied Fire Control Services05/02/2018
BISFPISSUEDAllied Fire Control Services08/12/2014
BISPLISSUEDDynamic Contracting03/10/2011
BISPLISSUEDDynamic Contracting11/30/2009
BISFPISSUEDFire Command Co04/08/1998
BISPLISSUEDForsythe P&H08/24/1993
BISOTISSUEDMichael Karantinidis03/26/1993
BISOTISSUEDMichael Karantinidis06/23/1992
1 project · most recent 09/18/2023
Water/Sanitary
FiledStatusContractorScope
09/18/2023——Water/Sanitary
6 projects · most recent 07/09/2025
General Wiring
FiledStatusContractorScope
07/09/2025Permit IssuedMac Fhionnghaile & SonsGeneral Wiring
05/06/2025CompleteGilston Electrical Contng2 meters, 2 new_meters
09/20/2022CompleteHylan Datacom & Electrical—
06/01/2022CompleteAmin ElectricalGeneral Wiring
09/08/2021CompleteCsi Sec & ElectricGeneral Wiring
02/14/2020CompleteAmin Electrical—
2 projects · most recent 08/22/2024
Concrete Steel
FiledStatusContractorScope
08/22/2024Permit IssuedKordun ConstructionConcrete
09/18/2023——Steel
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
11/13/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
11/13/2025FinalYoung Suhprogress
11/13/2025Air barrier - visual inspectionYoung Suhenergy_progress
11/13/2025Insulation placement and R valuesYoung Suhenergy_progress
11/13/2025Interior lighting powerYoung Suhenergy_progress
11/13/2025Lighting controlsYoung Suhenergy_progress
11/13/2025Post-installed AnchorsYoung Suhspecial
11/13/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
10/01/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
10/01/2025Interior lighting powerYoung Suhenergy_progress
10/01/2025Air barrier - visual inspectionYoung Suhenergy_progress
10/01/2025Lighting controlsYoung Suhenergy_progress
10/01/2025Insulation placement and R valuesYoung Suhenergy_progress
10/01/2025FinalYoung Suhprogress
10/01/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
10/01/2025Post-installed AnchorsYoung Suhspecial
06/30/2024Post-installed AnchorsMARISA HARTEspecial
04/17/2024Fire-Resistant Penetrations and JointsMARISA HARTEspecial
04/17/2024FinalMARISA HARTEprogress
08/02/2023Structural Steel - Welding—special
08/02/2023Structural Steel - High Strength Bolting—special
08/02/2023Structural Steel - Details—special
08/02/2023Structural Stability – Alterations of existing buildings—special
08/02/2023Heating Systems—special
08/02/2023High-Pressure Steam Piping (Welding)—special
Latest 25 of 33.
▾Documents — 162 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/25/2026X00487734-P2Request digital key ↗
08/25/2026X00487734-I1Request digital key ↗
08/23/2026X08012743-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION21
03/06/2026220630011Open ↗
03/03/2026220630011Open ↗
07/25/2023240261195Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION7
02/14/2023220630155Open ↗
06/24/2022240261195Open ↗
07/19/2021220630011Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026X00487734-I1Open ↗
08/23/2026X08012743-I1Open ↗
08/23/2026X08023782-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
05/15/2018220630155Open ↗
01/05/2018220630155Open ↗
01/05/2018220630011Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026X00487734-I1Open ↗
09/01/2026X01037351-S2Open ↗
08/26/2026X00487734-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026X00487734-I1Open ↗
09/01/2026X00487734-I1Open ↗
09/01/2026X01037351-S2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/14/2019240261195Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/30/2009220039116Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/14/2019240261195Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/14/2019240261195Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/30/2009220039116Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING4
10/23/2023220630011Open ↗
05/05/2023220630011Open ↗
04/21/2022220630011Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
01/05/2018220630011Open ↗
06/27/2014220388471Open ↗
06/10/2014220386222Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/11/2011220039116Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026X01037351-I1Open ↗
08/13/2026X00487734-I1Open ↗
08/13/2026X01037351-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
06/24/2022240261195Open ↗
03/05/2021220630011Open ↗
03/05/2021220630155Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/27/2014220388471Open ↗
06/10/2014220386222Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/30/2009220039116Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
09/07/2023240261195Open ↗
06/24/2022240261195Open ↗
03/05/2021220630011Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/15/2018220630155Open ↗
02/20/2018220630011Open ↗
01/05/2018220630155Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
09/07/2023240261195Open ↗
▸BISNYCECC ANALYSIS1
09/14/2019240261195Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/14/2019240261195Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/25/2026220630011Open ↗
08/23/2023240261195Open ↗
06/24/2022240261195Open ↗
Showing 3 of 6 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/24/2022240261195Open ↗
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/13/2026X08023782-I1Open ↗
08/13/2026X08012743-I1Open ↗
08/13/2026X00884924-S3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
08/13/2026X00884924-I1Open ↗
08/13/2026X00884924-S3Open ↗
08/13/2026X00884924-S4Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/08/2023240261195Open ↗
08/12/2011220039116Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/12/2011220039116Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/30/2009220039116Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
08/23/2023240261195Open ↗
02/08/2023220630155Open ↗
03/05/2021220630155Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET6
01/05/2018220630155Open ↗
01/05/2018220630011Open ↗
06/27/2014220388471Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
03/17/2023220630155Open ↗
02/08/2023220630155Open ↗
07/26/2022220630011Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/14/2019240261195Open ↗
▸Other Documents2
▸BISSupporting Document: Fee Exempt1
02/08/2023220630155Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/30/2022220630155Open ↗