← Back
Over six families without stores
1779 MONROE AVENUE
BRONX · BIN 2007449
💬 Discuss this project
1930Year Built
4.5Stories
C1Building Class
R8Zoning
7,759 sfGross Floor Area
18Units
Rent Stabilized42 Open Violations 36 unresolved · 6 paperwork only ▸
Over six families without stores · Owner of record: 1779 MONROE LLC · 2,375 sf lot · 3.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction28p · 1 filing · 20 docs
PenthouseUnder Construction60p · 1 filing · 20 docs
Floor 4Under Construction61p · 1 filing · 20 docs
Floor 3Under Construction61p · 1 filing · 20 docs
Floor 2Under Construction61p · 1 filing · 20 docs
Floor 1Under Construction60p · 1 filing · 20 docs
CellarUnder Construction63p · 1 filing · 20 docs
1 job · most recent 08/10/2023
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/10/2023Permit IssuedSKYWARD DEVELOPERS INCHeating Systems, Ventilation Systems
Heating
Daikin 2MXS18GVJU 22,000 BTU · Condensing Unit ×36
Ventilation
Whisper Warm FV-11VH1 50 CFM · Exhaust Fan ×36
Zephyr Z5H 50 CFM · Exhaust Fan ×36
Greenheck G-071-VG 550 CFM · Exhaust Fan ×4
G-067-VG 100 CFM · Exhaust Fan ×2
G-1/80 200 CFM · Exhaust Fan ×2
1 job · most recent 08/10/2023
Storm Water/Sanitary
FiledStatusContractorScope
08/10/2023Permit IssuedTARGET PIPING NY LLCStorm, Water/Sanitary
3 jobs · most recent 02/19/2026
General Wiring
FiledStatusContractorScope
02/19/2026Permit IssuedLABCO ELETRT CONTNG CORP—
11/01/2022Permit IssuedSOLAS ELECTRICAL CORP—
08/12/2022Permit IssuedS&R ELECTRICAL & MECHANICGeneral Wiring
1 job · most recent 08/10/2023
Steel Masonry
FiledStatusContractorScope
08/10/2023Permit IssuedTARGET PIPING NY LLCSteel, Masonry
3 jobs · most recent 02/25/2026
Sidewalk Shed Fence Scaffold
FiledStatusContractorScope
02/25/2026Permit IssuedSKY HEIGHTS CONSTRUCTIONSidewalk Shed
08/10/2023Permit IssuedTARGET PIPING NY LLCFence
01/18/2023Permit IssuedGWT ENTERPRISES INCScaffold
Building Lifecycle
All (183)Filed (15)Permit Issued (20)Violation (60)Inspection (6)Objection (49)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
09/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/06/2026
Violation issued (ECB, open)
Unknown
05/12/2026
Permit issued — Sprinklers
X00589024-S3-EW-SP
02/25/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01350026-I1
02/25/2026
Permit issued — Sidewalk Shed
X01350026-I1-SH
02/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2026
Permit issued — Plumbing
X00589024-S3-PL
01/16/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/15/2026
Violation issued (ECB, open)
Construction
01/15/2026
Violation issued (ECB, open)
Construction
01/14/2026
Violation issued (ECB, open)
Construction
11/24/2025
Violation issued (HPD, open)
I
06/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2025
Permit issued — Plumbing
X00589024-S3-EW-SP
04/23/2025
Violation issued (ECB, open)
Construction
02/04/2025
Permit issued — Plumbing
X00589024-S3-PL
01/07/2025
Violation issued (ECB, open)
Unknown
12/03/2024
Violation issued (HPD, open)
I
09/09/2024
421-a(16) registration filed
07/11/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/10/2024
Permit issued — Sidewalk Shed
X08032585-I1-SH
01/06/2024
Permit issued — Supported Scaffold
X00801731-I1-SF
11/27/2023
Violation issued (HPD, open)
I
11/22/2023
Permit issued — Sidewalk Shed
X08032585-I1-SH
10/10/2023
Objection resolved — Addressed
08/21/2023
Objection raised — Other
08/10/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB #X00589024-I1
X00589024-P6
08/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/07/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/07/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
08/07/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/07/2023
Special inspection requirement — Metering
FAHAD FATEH
08/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/07/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/07/2023
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/07/2023
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/07/2023
Special inspection requirement — Lighting controls
FAHAD FATEH
08/07/2023
Special inspection requirement — Exterior lighting power
FAHAD FATEH
08/07/2023
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/07/2023
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
07/21/2023
Permit issued — Construction Fence
X00589024-S1-FN
07/21/2023
Permit issued — General Construction
X00589024-I1-GC
07/17/2023
Violation issued (ECB, closed)
Construction
03/17/2023
Permit issued — General Construction
X00589024-I1-GC
03/02/2023
Permit issued — Plumbing
X00589024-S3-EW-SP
02/09/2023
Permit issued — Supported Scaffold
X00801731-I1-SF
01/18/2023
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00801731-I1
01/17/2023
Filed — Alteration
X08032585-P1
01/15/2023
Violation issued (ECB, closed)
Unknown
12/20/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/20/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/20/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/19/2022
Violation issued (ECB, closed)
Construction
12/19/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 183 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSING PRESERVATION & DEVELOPMENT404/09/2026
1779 MONROE LLC603/22/2026
SKYWARD DEVELOPERS1303/22/2026
OWNER OF 1779 MONROE AVE.103/22/2026
OWNER OF 1779 MONROE A103/22/2026
DEPT OF HOUSING URB. D103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/16/2022$1.4M—Private party → 1779 MONROE LLC$174/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION402/25/2026
NIKOLAI KATZ ARCHITECT408/10/2023
SH ENGINEERING PLLC309/30/2022
CHOSEN MEP, CORP.406/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYWARD DEVELOPERS INCGeneral Contractor1807/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor507/08/2026
GWT ENTERPRISES INCGeneral Contractor407/08/2026
B&B MECH PLBG & HTG LLCPlumbing207/08/2026
TARGET PIPING NY LLCFire Protection207/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
SKY HEIGHTS CONSTRUCTIONGeneral Contractor104/09/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616908/10/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedTARGET PIPING NY LLC05/12/2026
DOB NOWSidewalk ShedPermit IssuedSKY HEIGHTS CONSTRUCTION02/25/2026
DOB NOWPlumbingPermit IssuedTARGET PIPING NY LLC02/02/2026
DOB NOWPlumbingPermit IssuedTARGET PIPING NY LLC05/14/2025
DOB NOWPlumbingPermit IssuedTARGET PIPING NY LLC02/04/2025
DOB NOWSidewalk ShedPermit IssuedGWT ENTERPRISES INC01/10/2024
DOB NOWSupported ScaffoldPermit IssuedGWT ENTERPRISES INC01/06/2024
DOB NOWSidewalk ShedPermit IssuedMANHATTAN D ENTERPRISES11/22/2023
DOB NOWConstruction FencePermit IssuedSKYWARD DEVELOPERS INC07/21/2023
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC07/21/2023
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC03/17/2023
DOB NOWPlumbingPermit IssuedA M B MECHANICAL INC03/02/2023
DOB NOWSupported ScaffoldPermit IssuedMANHATTAN D ENTERPRISES02/09/2023
DOB NOWSidewalk ShedPermit IssuedMANHATTAN D ENTERPRISES11/28/2022
DOB NOWPlumbingPermit IssuedYG SERVICES INC09/09/2022
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC09/06/2022
DOB NOWFoundationPermit IssuedSKYWARD DEVELOPERS INC08/23/2022
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC08/04/2022
DOB NOWConstruction FencePermit IssuedSKYWARD DEVELOPERS INC06/22/2022
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC05/25/2022
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2024Pass-Final PL - UndergroundPassView ↗
10/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
08/07/2023Insulation placement and R valuesFAHAD FATEHenergy_progress
08/07/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
08/07/2023MeteringFAHAD FATEHenergy_progress
08/07/2023Exterior lighting powerFAHAD FATEHenergy_progress
08/07/2023Lighting controlsFAHAD FATEHenergy_progress
08/07/2023Fenestration air leakageFAHAD FATEHenergy_progress
08/07/2023Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/07/2023Maintenance informationFAHAD FATEHenergy_progress
08/07/2023Interior lighting powerFAHAD FATEHenergy_progress
08/07/2023Fenestration areasFAHAD FATEHenergy_progress
08/07/2023Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/07/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/07/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
08/07/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
08/07/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/07/2023Lighting in dwelling unitsFAHAD FATEHenergy_progress
10/07/2022Structural Cold-Formed SteelFAHAD FATEHspecial
10/07/2022Insulation placement and R valuesFAHAD FATEHenergy_progress
10/07/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
10/07/2022FinalFAHAD FATEHprogress
10/07/2022Footing and FoundationFAHAD FATEHprogress
10/07/2022Post-installed Anchors—special
10/07/2022Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
10/07/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
10/07/2022Subgrade InspectionsFAHAD FATEHspecial
Latest 25 of 102.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/24/2026X00589024-S2Request digital key ↗
08/24/2026X00589024-S3Request digital key ↗
08/24/2026X00589024-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00589024-P1Open ↗
08/13/2026X00589024-I1Open ↗
08/13/2026X00589024-P6Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/24/2026X00589024-I1Open ↗
08/24/2026X00589024-S1Open ↗
08/24/2026X00589024-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/30/2026X00589024-P2Open ↗
08/29/2026X00589024-P5Open ↗
08/29/2026X00589024-P5Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/30/2026X00589024-P2Open ↗
08/29/2026X00589024-P5Open ↗
08/29/2026X00589024-P5Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X00589024-P1Open ↗
08/13/2026X00589024-I1Open ↗
08/13/2026X00589024-P6Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026X00589024-S2Open ↗
08/13/2026X00589024-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/24/2026X00589024-P2Open ↗
08/24/2026X00589024-S2Open ↗
08/24/2026X00589024-S3Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026X00589024-S2Open ↗
08/13/2026X00589024-P4Open ↗
08/13/2026X00589024-P5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00589024-S2Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00589024-S2Open ↗
▸Other Documents19
▸DOB NOWProperty Ownership Certification7
08/24/2026X00589024-P1Open ↗
08/24/2026X00589024-P2Open ↗
08/24/2026X00589024-P5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026X00589024-P4Open ↗
08/13/2026X00589024-P5Open ↗
08/13/2026X00589024-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026X00589024-I1Open ↗
08/13/2026X00589024-P5Open ↗
08/13/2026X00589024-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00589024-S2Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00589024-I1Open ↗