← Back
BuildNYC
Office only, 2-6 stories
1779 RICHMOND AVENUE
STATEN ISLAND · BIN 5151246
💬 Discuss this project
2008Year Built
3Stories
O2Building Class
R3-1Zoning
19,116 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Office only, 2-6 stories · Owner of record: 1779 Richmond Ave · 15,763 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Floor 31 filing
Floor 2
Floor 11 filing
Cellar3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1779 Richmond Avenue203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tarlan Design Build709/09/2026
A Tech Engineering NYC107/07/2026
Real Estate303/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Lanciers Associates1603/21/2026
Tarlan Design Build203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Exotic Design & WireGeneral Contractor1004/09/2026
MVS Heating & Air Conditspecialty_contractor107/10/2026
A & E PlumbingPlumbing107/08/2026
Ami and AssociatesFire Protection107/08/2026
Capital Contracting P&HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tarlan Design Build3187809/09/2026
A Tech Engineering NYC, P6738107/07/2026
Building Lifecycle
09/30/2026
Signed off — Alteration CO
Convert existing Ambulatory Treatment Healthcare Facility UG 4 to UG III (B) School @ Cellar Level. Interior Renovation of existing cellar as per plans submitted. No work being proposed on 1st, 2nd, third floor and roof.
S01174180-I1
09/09/2026
Filed — Alteration CO
Convert existing Ambulatory Treatment Healthcare Facility UG 4 to UG III (B) School @ Cellar Level. Interior Renovation of existing cellar as per plans submitted. No work being proposed on 1st, 2nd, third floor and roof.
S01174180-P4
09/09/2026
Special inspection requirement — Interior lighting power
SAVERIO TARANTINO
09/09/2026
Special inspection requirement — Metering
SAVERIO TARANTINO
09/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAVERIO TARANTINO
111 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
Nothing on file for this building.
146 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account