← Back
Two stories - detached, small or mid-size
178-15 CROYDON ROAD
QUEENS · BIN 4213037
💬 Discuss this project
1940Year Built
2.75Stories
A1Building Class
R1-2Zoning
3,142 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,809 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingLandscapeGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 2 filings · 20 docs
Floor 2Under Construction31p · 1 filing · 20 docs
Floor 1Under Construction30p · 1 filing · 20 docs
CellarUnder Construction36p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2025$1.5M—— → —$477/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMINOV DESIGN ENGINEER, PC408/17/2026
DIAGRID CONSULTANTS303/26/2026
TOM PETERSEN ARCHITECT, LLC112/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MODERN INT HOME REVOV CO*General Contractor709/07/2026
SOLARBLOCKS ENERGY LLCGeneral Contractor104/09/2026
NICE PLUMBING CORPPlumbing107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMINOV DESIGN ENGINEER, P9365508/17/2026
SJS INSPECTIONS AND CONSU8286303/26/2026
THOMAS PETERSEN ARCHITECT7854112/30/2025
Building Lifecycle
All (64)Filed (8)Permit Issued (9)Signed Off (1)Violation (3)Inspection (3)Objection (10)Special Inspection (30)
08/17/2026
Filed — Alteration CO
HEREWITH FILING SOE PLANS OF HORIZONTAL ENLARGEMENT TO AN EXISTING ONE FAMILY DWELLING. THE SOE INVOLVES 1:1 EXCAVATION.THIS DESIGN in CONJUNCTION WITH DOB Job No: Q01331319-I1
Q01331319-P1
07/24/2026
Permit issued — Structural
Q01331319-S4-ST
07/24/2026
Permit issued — General Construction
Q01331319-I1-GC
07/23/2026
Permit issued — Construction Fence
Q01331319-S1-FN
07/22/2026
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
Q01340839-I1
06/30/2026
Permit issued — Plumbing
Q01331319-S6-PL
05/20/2026
Filed — Alteration CO
HEREWITH FILING SOE PLANS OF HORIZONTAL ENLARGEMENT TO AN EXISTING ONE FAMILY DWELLING. THE SOE INVOLVES 1:1 EXCAVATION.THIS DESIGN in CONJUNCTION WITH DOB Job No: Q01331319-I1
Q01331319-S6
05/19/2026
Special inspection requirement — Maintenance information
MARK AMINOV
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARK AMINOV
05/19/2026
Special inspection requirement — Energy Code Compliance Inspections
MARK AMINOV
05/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARK AMINOV
05/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARK AMINOV
05/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARK AMINOV
04/30/2026
Permit issued — General Construction
Q01331319-I1-GC
04/30/2026
Objection resolved — Addressed
04/30/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/24/2026
Permit issued — Foundation
Q01331319-S2-FO-EA
04/24/2026
Permit issued — Structural
Q01331319-S4-ST
04/01/2026
Objection raised — Admin
04/01/2026
Objection resolved — Addressed
03/27/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/26/2026
Filed — Alteration CO
HEREWITH FILING SOE PLANS OF HORIZONTAL ENLARGEMENT TO AN EXISTING ONE FAMILY DWELLING. THE SOE INVOLVES 1:1 EXCAVATION.THIS DESIGN in CONJUNCTION WITH DOB Job No: Q01331319-I1
Q01331319-S4
03/26/2026
Filed — Alteration CO
HEREWITH FILING SOE PLANS OF HORIZONTAL ENLARGEMENT TO AN EXISTING ONE FAMILY DWELLING. THE SOE INVOLVES 1:1 EXCAVATION.THIS DESIGN in CONJUNCTION WITH DOB Job No: Q01331319-I1
Q01331319-S3
03/26/2026
Filed — Alteration CO
HEREWITH FILING SOE PLANS OF HORIZONTAL ENLARGEMENT TO AN EXISTING ONE FAMILY DWELLING. THE SOE INVOLVES 1:1 EXCAVATION.THIS DESIGN in CONJUNCTION WITH DOB Job No: Q01331319-I1
Q01331319-S2
03/26/2026
Permit issued — Construction Fence
Q01331319-S1-FN
03/26/2026
Objection raised — Other
03/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY BOLOTOV
03/26/2026
Special inspection requirement — Concrete - Cast-In-Place
MARK AMINOV
03/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY BOLOTOV
03/25/2026
Objection resolved — Addressed
03/17/2026
Special inspection requirement — Final
MARK AMINOV
03/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SHAHRIAR QUAYYUM
03/17/2026
Special inspection requirement — Subgrade Inspections
SERGEY BOLOTOV
03/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SHAHRIAR QUAYYUM
03/17/2026
Special inspection requirement — Concrete - Cast-In-Place
MARK AMINOV
03/17/2026
Special inspection requirement — Subgrade Inspections
SERGEY BOLOTOV
03/17/2026
Special inspection requirement — Final
MARK AMINOV
03/17/2026
Special inspection requirement — Footing and Foundation
MARK AMINOV
03/17/2026
Special inspection requirement — Structural Steel - Details
SERGEY BOLOTOV
03/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SERGEY BOLOTOV
03/17/2026
Special inspection requirement — Structural Steel - Welding
SERGEY BOLOTOV
03/02/2026
Objection resolved — Addressed
02/27/2026
Filed — Alteration CO
HEREWITH FILING SOE PLANS OF HORIZONTAL ENLARGEMENT TO AN EXISTING ONE FAMILY DWELLING. THE SOE INVOLVES 1:1 EXCAVATION.THIS DESIGN in CONJUNCTION WITH DOB Job No: Q01331319-I1
Q01331319-S1
01/14/2026
Objection resolved — Addressed
01/12/2026
Objection raised — Zoning
01/12/2026
Objection raised — Cost
01/12/2026
Objection raised — Energy
01/05/2026
Permit issued — Solar
Q01340839-I1-SL
12/30/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
Q01340839-I1
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
12/30/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
12/30/2025
Special inspection requirement — Final
TOM PETERSEN
12/19/2025
Filed — Alteration CO
HEREWITH FILING SOE PLANS OF HORIZONTAL ENLARGEMENT TO AN EXISTING ONE FAMILY DWELLING. THE SOE INVOLVES 1:1 EXCAVATION.THIS DESIGN in CONJUNCTION WITH DOB Job No: Q01331319-I1
Q01331319-I1
12/09/2025
Special inspection requirement — Maintenance information
MARK AMINOV
12/09/2025
Special inspection requirement — Air barrier - visual inspection
MARK AMINOV
12/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MARK AMINOV
12/09/2025
Special inspection requirement — Insulation placement and R values
MARK AMINOV
12/09/2025
Special inspection requirement — Interior lighting power
MARK AMINOV
12/09/2025
Special inspection requirement — Permanent certificate
MARK AMINOV
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedMODERN INT HOME REVOV CO*07/24/2026
DOB NOWGeneral ConstructionPermit IssuedMODERN INT HOME REVOV CO*07/24/2026
DOB NOWConstruction FencePermit IssuedMODERN INT HOME REVOV CO*07/23/2026
DOB NOWPlumbingPermit IssuedNICE PLUMBING CORP06/30/2026
DOB NOWGeneral ConstructionPermit IssuedMODERN INT HOME REVOV CO*04/30/2026
DOB NOWFoundationPermit IssuedMODERN INT HOME REVOV CO*04/24/2026
DOB NOWStructuralPermit IssuedMODERN INT HOME REVOV CO*04/24/2026
DOB NOWConstruction FencePermit IssuedMODERN INT HOME RENO CORP03/26/2026
DOB NOWSolarSigned-offSOLARBLOCKS ENERGY LLC01/05/2026
1 project · most recent 08/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/17/2026Permit IssuedNICE PLUMBING CORPGas, Water/Sanitary
2 projects · most recent 04/30/2026
General Wiring
FiledStatusContractorScope
04/30/2026Permit IssuedNAS ELECTRIC CORPGeneral Wiring
12/09/2025CompleteMDC SECURITY AND ELEC'L—
1 project · most recent 08/17/2026
Steel Wood
FiledStatusContractorScope
08/17/2026Permit IssuedMODERN INT HOME RENO CORPSteel, Wood
1 project · most recent 12/30/2025
FiledStatusContractorScope
12/30/2025Signed-offSOLARBLOCKS ENERGY LLC76 panels, 34.2 kw, 2,054 roof_area_sqft
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/27/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
05/19/2026Maintenance informationMARK AMINOVenergy_progress
05/19/2026Fire-Resistant Penetrations and JointsMARK AMINOVspecial
05/19/2026Energy Code Compliance InspectionsMARK AMINOVprogress
05/19/2026HVAC-R and service water piping design and insulationMARK AMINOVenergy_progress
05/19/2026HVAC-R and service water heating system controlsMARK AMINOVenergy_progress
05/19/2026HVAC-R and service water heating equipmentMARK AMINOVenergy_progress
04/30/2026Excavations - Sheeting, Shoring, and Bracing—special
03/26/2026Structural Stability – Alterations of existing buildingsSERGEY BOLOTOVspecial
03/26/2026Concrete - Cast-In-PlaceMARK AMINOVspecial
03/26/2026Structural Stability – Alterations of existing buildingsSERGEY BOLOTOVspecial
03/17/2026FinalMARK AMINOVprogress
03/17/2026Subsurface Investigations (Borings/Test Pits)SHAHRIAR QUAYYUMspecial
03/17/2026Subgrade InspectionsSERGEY BOLOTOVspecial
03/17/2026Subsurface Investigations (Borings/Test Pits)SHAHRIAR QUAYYUMspecial
03/17/2026Concrete - Cast-In-PlaceMARK AMINOVspecial
03/17/2026Subgrade InspectionsSERGEY BOLOTOVspecial
03/17/2026FinalMARK AMINOVprogress
03/17/2026Footing and FoundationMARK AMINOVprogress
03/17/2026Structural Steel - DetailsSERGEY BOLOTOVspecial
03/17/2026Structural Steel - High Strength BoltingSERGEY BOLOTOVspecial
03/17/2026Structural Steel - WeldingSERGEY BOLOTOVspecial
12/30/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
12/30/2025Energy Code Compliance InspectionsTOM PETERSENprogress
12/30/2025FinalTOM PETERSENprogress
12/09/2025Maintenance informationMARK AMINOVenergy_progress
Latest 25 of 36.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/17/2026Q01340839-I1Request digital key ↗
08/17/2026Q01331319-S4Request digital key ↗
08/17/2026Q01331319-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/19/2026Q01331319-P1Open ↗
08/17/2026Q01331319-P1Open ↗
08/13/2026Q01331319-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01331319-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/17/2026Q01331319-S3Open ↗
08/17/2026Q01331319-S6Open ↗
08/17/2026Q01331319-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/31/2026Q01331319-S6Open ↗
08/29/2026Q01331319-S4Open ↗
08/29/2026Q01331319-S4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/31/2026Q01331319-S6Open ↗
08/31/2026Q01331319-S6Open ↗
08/29/2026Q01331319-S4Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/17/2026Q01331319-P1Open ↗
08/13/2026Q01331319-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/17/2026Q01331319-S2Open ↗
08/17/2026Q01331319-S6Open ↗
08/17/2026Q01331319-P1Open ↗
Showing 3 of 9 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/13/2026Q01331319-S2Open ↗
08/13/2026Q01331319-S3Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q01331319-S2Open ↗
08/13/2026Q01331319-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01331319-S3Open ↗
08/13/2026Q01331319-S2Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01340839-I1Open ↗
▸Other Documents13
▸DOB NOWPlot Diagram6
08/17/2026Q01331319-P1Open ↗
08/13/2026Q01331319-S3Open ↗
08/13/2026Q01331319-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial2
08/17/2026Q01331319-P1Open ↗
08/13/2026Q01331319-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026Q01331319-P1Open ↗
08/13/2026Q01331319-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01331319-P1Open ↗
08/13/2026Q01331319-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026Q01331319-S2Open ↗