← Back
One story - permanent living quarter
178-39 134 AVENUE
QUEENS · BIN 4279747
💬 Discuss this project
1940Year Built
1.5Stories
A2Building Class
R3AZoning
1,334 sfGross Floor Area
1Units
One story - permanent living quarter · 3,360 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/14/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor108/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/14/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
08/20/2026
Permit issued — Solar
Q01445113-I1-SL
08/14/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01445113-I1
08/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/14/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/12/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC08/20/2026
2 projects · most recent 09/03/2026
General Wiring
FiledStatusContractorScope
09/03/2026Permit IssuedCUNNINGHAM ELECTRIC CORPGeneral Wiring
08/14/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
1 project · most recent 08/14/2026
FiledStatusContractorScope
08/14/2026Permit IssuedSUNRUN INSTALLATION SVC32 panels, 14.4 kw, 336 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/14/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/14/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/12/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/12/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/12/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01445113-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026Q01445113-I1Open ↗
08/24/2026Q01445113-I1Open ↗
08/24/2026Q01445113-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q01445113-I1Open ↗
08/24/2026Q01445113-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01445113-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01445113-I1Open ↗