← Back
Two stories - detached, small or mid-size
178-39 137 AVENUE
QUEENS · St. Albans · BIN 4279844
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3AZoning
1,989 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC211/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272211/13/2024
Building Lifecycle
All (17)Filed (2)Permit Issued (1)Violation (4)Special Inspection (10)
11/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/14/2024
Special inspection requirement — Final
Walid Abdulla
11/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/14/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/13/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01117463-P1
10/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/23/2024
Special inspection requirement — Final
Walid Abdulla
10/23/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/17/2024
Permit issued — Solar
Q01117463-I1-SL
10/03/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01117463-I1
04/16/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/16/2008
Violation issued (ECB, closed)
Construction
04/16/2008
Violation issued (ECB, closed)
Construction
12/21/1996
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/17/2024
BISOTISSUED1ST LIGHT ENERGY INC09/09/2016
BISPLISSUEDAJIT ONE MECH&GEN'L CONTR03/01/2007
BISOTISSUEDJG ONE ENT04/23/1998
1 project · most recent 11/21/2024
General Wiring
FiledStatusContractorScope
11/21/2024CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 11/13/2024
FiledStatusContractorScope
11/13/2024Signed-offSUNRUN INSTALLATION SVC22 panels, 8.8 kw, 233 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/14/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/14/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/14/2024FinalWalid Abdullaprogress
11/14/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/14/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
10/23/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/23/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/23/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/23/2024FinalWalid Abdullaprogress
10/23/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026Q01117463-I1Request digital key ↗
08/21/2026Q01117463-P1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
06/02/2025440339803Open ↗
09/09/2024440339803Open ↗
08/30/2024440339803Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
09/07/2016440339803Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q01117463-I1Open ↗
09/02/2026Q01117463-I1Open ↗
09/02/2026Q01117463-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026Q01117463-I1Open ↗
09/02/2026Q01117463-I1Open ↗
08/27/2026Q01117463-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026Q01117463-I1Open ↗
08/21/2026Q01117463-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/07/2016440339803Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/07/2016440339803Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/07/2016440339803Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
09/07/2016440339803Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q01117463-I1Open ↗
08/21/2026Q01117463-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/07/2016440339803Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/20/2024440339803Open ↗
09/13/2024440339803Open ↗
09/13/2024440339803Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/07/2016440339803Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/13/2024440339803Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/20/2024440339803Open ↗
09/13/2024440339803Open ↗
09/13/2024440339803Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/24/2024440339803Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/24/2024440339803Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01117463-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/07/2016440339803Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/13/2024440339803Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/07/2016440339803Open ↗
▸BISADDITIONAL INFORMATION1
09/09/2024440339803Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/24/2024440339803Open ↗