← Back
One story - permanent living quarter
178-41 146 TERRACE
QUEENS · BIN 4285965
💬 Discuss this project
1945Year Built
1.5Stories
A2Building Class
R3-2Zoning
1,031 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: PDB EQUITY LLC · 3,896 sf lot · 0.26 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Floor 22p · 2 filings · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/19/2024$575K—— → —$558/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN502/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor204/09/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519402/16/2026
Building Lifecycle
All (59)Filed (5)Permit Issued (3)Signed Off (3)Inspection (12)Objection (6)Special Inspection (30)
07/02/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
06/16/2026
Signed off — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS. NEW DRYWALLS PARTITIONS AND PLUMBIMNG FIXTURES AS PER PLANS.
Q01155479-I1
05/12/2026
Signed off — Alteration
Q01213857-I1
03/30/2026
Signed off — Alteration
Q01180612-I1
03/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/18/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
02/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
02/17/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
02/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
02/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
02/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/17/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Younes Abouyaala
02/16/2026
Filed — Alteration
Q01213857-P1
02/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
02/05/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
02/05/2026
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
02/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
02/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
02/05/2026
Special inspection requirement — Metering
Younes Abouyaala
02/05/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
02/05/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
02/05/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
02/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
02/05/2026
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
02/05/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
02/05/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
02/05/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
02/05/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
02/05/2026
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
02/05/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
02/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/05/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
02/05/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
02/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/07/2026
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS. NEW DRYWALLS PARTITIONS AND PLUMBIMNG FIXTURES AS PER PLANS.
Q01155479-P1
05/13/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/12/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/12/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/12/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/06/2025
Permit issued — Plumbing
Q01213857-I1-PL
04/25/2025
Filed — Alteration
Q01213857-I1
02/25/2025
Permit issued — Foundation
Q01155479-I1-GC-CX
02/25/2025
Permit issued — Construction Fence
Q01180612-I1-FN
02/20/2025
Objection resolved — Addressed
02/19/2025
Objection raised — Zoning
02/17/2025
Filed — Alteration
Q01180612-I1
02/13/2025
Objection resolved — Addressed
01/17/2025
Objection raised — Other
01/11/2025
Objection resolved — Addressed
01/08/2025
Objection raised — Other
12/29/2024
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS. NEW DRYWALLS PARTITIONS AND PLUMBIMNG FIXTURES AS PER PLANS.
Q01155479-I1
12/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/22/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR05/06/2025
DOB NOWFoundationPermit IssuedJ&J DESIGNS INC02/25/2025
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC02/25/2025
1 project · most recent 08/04/2025
General Wiring
FiledStatusContractorScope
08/04/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 01/07/2026
Concrete Wood
FiledStatusContractorScope
01/07/2026Permit IssuedJ&J DESIGNS INCConcrete, Wood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/02/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
03/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2026Fail-Final CND-Occupancy InspectionFailView ↗
02/18/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/13/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/12/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/12/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/12/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/22/2024Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
02/17/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
02/17/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
02/17/2026Maintenance informationYounes Abouyaalaenergy_progress
02/17/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
02/17/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
02/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
02/17/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/17/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesYounes Abouyaalaspecial
02/05/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
02/05/2026Footing and FoundationYounes Abouyaalaprogress
02/05/2026Structural Wood FrameYounes Abouyaalaprogress
02/05/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
02/05/2026Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
02/05/2026MeteringYounes Abouyaalaenergy_progress
02/05/2026Permanent certificateYounes Abouyaalaenergy_progress
02/05/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
02/05/2026Interior lighting powerYounes Abouyaalaenergy_progress
02/05/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
02/05/2026Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
02/05/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
02/05/2026Maintenance informationYounes Abouyaalaenergy_progress
02/05/2026Fenestration areasYounes Abouyaalaenergy_progress
02/05/2026Fenestration air leakageYounes Abouyaalaenergy_progress
02/05/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
02/05/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
Latest 25 of 54.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q01180612-I1Request digital key ↗
08/17/2026Q01155479-P1Request digital key ↗
08/17/2026Q01155479-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01155479-I1Open ↗
08/13/2026Q01155479-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01155479-P1Open ↗
08/13/2026Q01155479-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026Q01155479-P1Open ↗
08/28/2026Q01155479-P1Open ↗
08/28/2026Q01155479-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026Q01155479-P1Open ↗
08/28/2026Q01155479-P1Open ↗
08/26/2026Q01155479-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01180612-I1Open ↗
08/17/2026Q01155479-I1Open ↗
08/17/2026Q01155479-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01155479-I1Open ↗
08/13/2026Q01155479-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026Q01155479-P1Open ↗
08/17/2026Q01155479-I1Open ↗
08/17/2026Q01213857-P1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q01155479-I1Open ↗
08/13/2026Q01155479-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01155479-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q01155479-I1Open ↗
08/13/2026Q01155479-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01155479-I1Open ↗
08/13/2026Q01155479-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01155479-I1Open ↗
08/13/2026Q01155479-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01155479-I1Open ↗
08/17/2026Q01155479-P1Open ↗
▸DOB NOWFinal Survey1
08/17/2026Q01155479-I1Open ↗