← Back
Two family converted from one family
178-44 146 TERRACE
QUEENS · BIN 4624291
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3-2Zoning
1,614 sfGross Floor Area
2Units
Two family converted from one family · 6,500 sf lot · 0.25 FAR built · Flood zone X500
Locations of Work
Architecture
Cellar1p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OOA111/07/2022
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OOA7015111/07/2022
Building Lifecycle
All (37)Filed (1)Objection (15)Special Inspection (21)
06/27/2025
Objection resolved — Addressed
06/27/2025
Objection resolved — Resolved
06/06/2025
Objection resolved — Addressed
05/05/2025
Objection raised — Structural
05/05/2025
Objection raised — Fire_Protection
04/15/2025
Objection resolved — Addressed
04/14/2025
Objection raised — Other
04/10/2025
Objection resolved — Resolved
04/10/2025
Special inspection requirement — Permanent certificate
04/10/2025
Special inspection requirement — Air barrier — testing
04/10/2025
Special inspection requirement — Air barrier - visual inspection
12/22/2022
Objection resolved — Addressed
11/17/2022
Objection raised — Zoning
11/17/2022
Objection raised — Zoning
11/17/2022
Objection raised — Accessibility
11/17/2022
Objection raised — Admin
11/17/2022
Objection raised — Fire_Protection
11/17/2022
Objection raised — Energy
11/07/2022
Filed — New Building
Curb Cut is being filed as per the latest NYCDOT requirements and Standards, located at approximately 157'-9" distance to the Easterly corner of 181st Street and 146th Terrace, 10' in width including 1.5' splay on each side.
Q00776154-I1
07/16/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Okey Oraedu
07/16/2022
Special inspection requirement — Subgrade Inspections
Okey Oraedu
07/16/2022
Special inspection requirement — Energy Code Compliance Inspections
Okey Oraedu
07/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
Okey Oraedu
07/16/2022
Special inspection requirement — Structural Wood Frame
Okey Oraedu
07/16/2022
Special inspection requirement — Final
Okey Oraedu
07/16/2022
Special inspection requirement — Footing and Foundation
Okey Oraedu
07/16/2022
Special inspection requirement — Concrete - Cast-In-Place
Okey Oraedu
07/16/2022
Special inspection requirement — Lighting in dwelling units
Okey Oraedu
07/16/2022
Special inspection requirement — Fenestration air leakage
Okey Oraedu
07/16/2022
Special inspection requirement — Fenestration areas
Okey Oraedu
07/16/2022
Special inspection requirement — Metering
Okey Oraedu
07/16/2022
Special inspection requirement — Maintenance information
Okey Oraedu
07/16/2022
Special inspection requirement — Insulation placement and R values
Okey Oraedu
07/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Okey Oraedu
07/16/2022
Special inspection requirement — Interior lighting power
Okey Oraedu
07/16/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Okey Oraedu
07/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Okey Oraedu
Nothing on file for this building.
1 project · most recent 11/07/2022
Gas Storm
FiledStatusContractorScope
11/07/2022——Gas, Storm
1 project · most recent 11/07/2022
Concrete Wood
FiledStatusContractorScope
11/07/2022——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/10/2025Permanent certificate—energy_progress
04/10/2025Air barrier — testing —energy_progress
04/10/2025Air barrier - visual inspection—energy_progress
07/16/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationOkey Oraeduspecial
07/16/2022Subgrade InspectionsOkey Oraeduspecial
07/16/2022Energy Code Compliance InspectionsOkey Oraeduprogress
07/16/2022Fire-Resistance Rated ConstructionOkey Oraeduprogress
07/16/2022Structural Wood FrameOkey Oraeduprogress
07/16/2022FinalOkey Oraeduprogress
07/16/2022Footing and FoundationOkey Oraeduprogress
07/16/2022Concrete - Cast-In-PlaceOkey Oraeduspecial
07/16/2022Lighting in dwelling unitsOkey Oraeduenergy_progress
07/16/2022Fenestration air leakageOkey Oraeduenergy_progress
07/16/2022Fenestration areasOkey Oraeduenergy_progress
07/16/2022MeteringOkey Oraeduenergy_progress
07/16/2022Maintenance informationOkey Oraeduenergy_progress
07/16/2022Insulation placement and R valuesOkey Oraeduenergy_progress
07/16/2022Fenestration and door U-factor and product ratingsOkey Oraeduenergy_progress
07/16/2022Interior lighting powerOkey Oraeduenergy_progress
07/16/2022Excavations - Sheeting, Shoring, and BracingOkey Oraeduspecial
07/16/2022Fire-Resistant Penetrations and JointsOkey Oraeduspecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q00776154-S2Request digital key ↗
08/15/2026Q00776154-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00776154-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026Q00776154-S2Open ↗
08/25/2026Q00776154-S1Open ↗
08/25/2026Q00776154-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026Q00776154-I1Open ↗
09/02/2026Q00776154-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026Q00776154-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026Q00776154-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/15/2026Q00776154-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00776154-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00776154-I1Open ↗