← Back
BuildNYC
Walk-up apt, over six families with stores
Williamsburg Houses
178 MAUJER STREET · BIN 3327889
💬 Discuss this project
1938Year Built
4Stories
C7Building Class
R6Zoning
345,248 sfGross Floor Area
486Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: Williamsburg Pact · 283,200 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWilliamsburg Houses46p · 2 filings · 20 docs
BulkheadWilliamsburg Houses1p · 1 filing · 20 docs
Floor 4Williamsburg Houses48p · 3 filings · 20 docs
Floor 3Williamsburg Houses48p · 3 filings · 20 docs
Floor 2Williamsburg Houses, Unit 23548p · 3 filings · 20 docs
Floor 1Williamsburg Houses49p · 3 filings · 20 docs
CellarWilliamsburg Pact LLC20p · 2 filings · 18 docs
BasementWilliamsburg Houses1p · 1 filing · 20 docs
Sub-BasementWilliamsburg Houses30p · 1 filing · 20 docs
Site & exteriorWilliamsburg Houses13p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Williamsburg Pact2607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Newman Design Architects412/18/2023
Dibari Engineering312/06/2023
Joel Phagoo P.E106/09/2023
Cityscape101/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Charis Consulting803/21/2026
William Vitacco Associates603/21/2026
A1 Expediting Service203/21/2026
DVA Advisors103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MDG Design & ConstructionGeneral Contractor507/08/2026
Delco ElectricalElectrical403/21/2026
KTB ElectricElectrical303/21/2026
Zone Plumbing & HeatingPlumbing207/08/2026
5 Boros PlumbingGeneral Contractor103/22/2026
SNS OrgnizationGeneral Contractor107/08/2026
Yarks NYCScaffold107/08/2026
Jemco Electric ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lorjan Agalliu Architect6104712/18/2023
Domani Inspection Service843201/12/2023
Building Lifecycle
All (74)Filed (9)Permit Issued (6)Signed Off (6)Violation (14)Inspection (1)Objection (8)Special Inspection (30)
08/20/2025
Violation issued (HPD, closed)
B
08/20/2025
Violation issued (HPD, closed)
C
08/20/2025
Violation issued (HPD, closed)
C
08/20/2025
Violation issued (HPD, closed)
C
08/20/2025
Violation issued (HPD, closed)
B
08/20/2025
Violation issued (HPD, closed)
C
08/20/2025
Violation issued (HPD, closed)
C
08/20/2025
Violation issued (HPD, closed)
B
08/20/2025
Violation issued (HPD, closed)
C
08/20/2025
Violation issued (HPD, closed)
A
08/20/2025
Violation issued (HPD, closed)
C
08/26/2024
Signed off — Alteration
INSTALLATION OF ACCESSIBLE RAMPS ON EXTERIOR OF BUILDING. THE STRUCTURAL DESIGN WORK DOES NOT CONSTITUTE ADDITION TO THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00764264-I1
08/06/2024
Signed off — Alteration
B00492684-I1
08/02/2024
Signed off — Alteration
B00493450-I1
03/22/2024
Signed off — Alteration
Interior renovation of partitions, ceilings and doors ; stair repair; repair to facade and window replacement. Filed in conjunction with MS #B00492684-I1 & PL #B00493450-I1. No change in use, egress or occupancy.
B00491939-I1
03/10/2024
Violation issued (HPD, closed)
B
02/15/2024
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00849770-I1
12/19/2023
Special inspection requirement — Masonry
lorjan agalliu
12/19/2023
Special inspection requirement — Exterior lighting power
lorjan agalliu
12/19/2023
Special inspection requirement — Interior lighting power
lorjan agalliu
12/19/2023
Special inspection requirement — Lighting in dwelling units
lorjan agalliu
12/19/2023
Special inspection requirement — Lighting controls
lorjan agalliu
12/19/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
lorjan agalliu
12/19/2023
Special inspection requirement — Final
lorjan agalliu
12/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
lorjan agalliu
12/19/2023
Special inspection requirement — Energy Code Compliance Inspections
lorjan agalliu
12/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
12/18/2023
Filed — Alteration
Interior renovation of partitions, ceilings and doors ; stair repair; repair to facade and window replacement. Filed in conjunction with MS #B00492684-I1 & PL #B00493450-I1. No change in use, egress or occupancy.
B00491939-P2
12/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
12/06/2023
Filed — Alteration
B00493450-P1
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
11/21/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
lorjan agalliu
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
11/21/2023
Special inspection requirement — Masonry
lorjan agalliu
11/21/2023
Special inspection requirement — Energy Code Compliance Inspections
lorjan agalliu
11/21/2023
Special inspection requirement — Final
lorjan agalliu
11/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
lorjan agalliu
11/21/2023
Special inspection requirement — Lighting controls
lorjan agalliu
11/21/2023
Special inspection requirement — Lighting in dwelling units
lorjan agalliu
11/21/2023
Special inspection requirement — Exterior lighting power
lorjan agalliu
11/21/2023
Special inspection requirement — Interior lighting power
lorjan agalliu
10/30/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/27/2023
Permit issued — Plumbing
B00493450-I1-PL
09/12/2023
Permit issued — Mechanical Systems
B00492684-I1-MS
07/21/2023
Permit issued — General Construction
B00491939-I1-GC
07/05/2023
Permit issued — Foundation
B00764264-I1-GC-CX
06/15/2023
Objection raised — Other
06/15/2023
Objection resolved — Addressed
06/09/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00849770-I1
06/09/2023
Permit issued — Sidewalk Shed
B00849770-I1-SH
05/09/2023
Filed — Alteration
Interior renovation of partitions, ceilings and doors ; stair repair; repair to facade and window replacement. Filed in conjunction with MS #B00492684-I1 & PL #B00493450-I1. No change in use, egress or occupancy.
B00491939-P1
04/28/2023
Special inspection requirement — Interior lighting power
lorjan agalliu
04/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
lorjan agalliu
04/28/2023
Special inspection requirement — Lighting in dwelling units
lorjan agalliu
04/28/2023
Special inspection requirement — Lighting controls
lorjan agalliu
04/28/2023
Special inspection requirement — Final
lorjan agalliu
04/28/2023
Special inspection requirement — Energy Code Compliance Inspections
lorjan agalliu
04/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
lorjan agalliu
04/28/2023
Special inspection requirement — Masonry
lorjan agalliu
04/26/2023
Objection raised — Inspections
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZone Plumbing & Heating09/27/2023
DOB NOWMechanical SystemsSigned-offSNS Orgnization09/12/2023
DOB NOWGeneral ConstructionSigned-offMDG Design & Construction07/21/2023
DOB NOWFoundationSigned-offMDG Design & Construction07/05/2023
DOB NOWSidewalk ShedSigned-offYarks NYC06/09/2023
DOB NOWGeneral ConstructionSigned-offMDG Design & Construction09/02/2022
11 projects · most recent 07/17/2026
General Wiring
FiledStatusContractorScope
07/17/2026CompleteDelco ElectricalGeneral Wiring
07/17/2026CompleteDelco ElectricalGeneral Wiring
07/17/2026CompleteDelco ElectricalGeneral Wiring
07/17/2026CompleteDelco ElectricalGeneral Wiring
02/06/2026CompleteKTB ElectricGeneral Wiring
11/19/2025CompleteKTB ElectricGeneral Wiring
11/19/2025CompleteKTB ElectricGeneral Wiring
07/18/2025Permit IssuedKTB ElectricGeneral Wiring
01/10/2022Permit IssuedElectl Contg Solutions Co—
10/09/2020CompleteJemco Electric ContractorsGeneral Wiring
10/03/2018Permit IssuedJoseph Weinstein ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/30/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
12/19/2023Masonrylorjan agalliuspecial
12/19/2023Exterior lighting powerlorjan agalliuenergy_progress
12/19/2023Interior lighting powerlorjan agalliuenergy_progress
12/19/2023Lighting in dwelling unitslorjan agalliuenergy_progress
12/19/2023Lighting controlslorjan agalliuenergy_progress
12/19/2023Fenestration and door U-factor and product ratingslorjan agalliuenergy_progress
12/19/2023Finallorjan agalliuprogress
12/19/2023Fire-Resistance Rated Constructionlorjan agalliuprogress
12/19/2023Energy Code Compliance Inspectionslorjan agalliuprogress
12/19/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
12/08/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
12/04/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
11/21/2023Fenestration and door U-factor and product ratingslorjan agalliuenergy_progress
11/21/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
11/21/2023Masonrylorjan agalliuspecial
11/21/2023Energy Code Compliance Inspectionslorjan agalliuprogress
11/21/2023Finallorjan agalliuprogress
11/21/2023Fire-Resistance Rated Constructionlorjan agalliuprogress
11/21/2023Lighting controlslorjan agalliuenergy_progress
11/21/2023Lighting in dwelling unitslorjan agalliuenergy_progress
11/21/2023Exterior lighting powerlorjan agalliuenergy_progress
11/21/2023Interior lighting powerlorjan agalliuenergy_progress
04/28/2023Interior lighting powerlorjan agalliuenergy_progress
04/28/2023Fenestration and door U-factor and product ratingslorjan agalliuenergy_progress
04/28/2023Lighting in dwelling unitslorjan agalliuenergy_progress
Latest 25 of 32.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Williamsburg HousesResidential—
Project B00648738 Alteration · LOC Issued · 12/23/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/31/2026B00492684-I1Request digital key ↗
08/31/2026B00493450-I1Request digital key ↗
08/31/2026B00493450-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/31/2026B00491939-P2Open ↗
08/31/2026B00491939-I1Open ↗
08/31/2026B00491939-P1Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/31/2026B00492684-I1Open ↗
08/31/2026B00493450-P1Open ↗
08/31/2026B00493450-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
10/07/2026B00491939-I1Open ↗
10/07/2026B00491939-I1Open ↗
09/23/2026B00491939-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/07/2026B00491939-I1Open ↗
09/23/2026B00491939-P2Open ↗
09/02/2026B00493450-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/31/2026B00492684-I1Open ↗
08/31/2026B00493450-I1Open ↗
08/31/2026B00491939-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/31/2026B00491939-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00764264-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00764264-I1Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/31/2026B00492684-I1Open ↗
08/31/2026B00493450-I1Open ↗
08/31/2026B00493450-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/31/2026B00492684-I1Open ↗
08/31/2026B00493450-I1Open ↗
08/31/2026B00491939-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00648738-I1Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026B00764264-I1Open ↗