Elevator apt, fireproof without stores
Monroe (NYCHA)
1785 STORY AVENUE · BIN 2092761
💬 Discuss this project
1958Year Built
14Stories
D3Building Class
R6Zoning
329,340 sfGross Floor Area
276Units
LL97 Covered5 Active Violations 4 unresolved · 1 paperwork only ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 175,014 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBoiler room demolition and constructionUnder Construction13p · 4 filings · 20 docs
BulkheadNYCHA Monroe Houses supported pipe scaffold2p · 1 filing · 14 docs
Floor 1Boiler room demolition and constructionUnder Construction2p · 1 filing · 20 docs
CellarBoiler room demolition and constructionUnder Construction131p · 2 filings · 20 docs
Sub-BasementBoiler room demolition and constructionUnder Construction10p · 1 filing · 20 docs
Site & exteriorTemporary chain link fence installationUnder Construction67p · 11 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority8909/12/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services2203/21/2026
Loring Consulting Engineers1203/21/2026
Dseny Engineering Services203/21/2026
KM Associates of New York703/21/2026
K & M Associates703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roma ScaffoldingScaffold2107/08/2026
MNK EnterprisesScaffold507/08/2026
Kordun ConstructionGeneral Contractor507/08/2026
Zoria HousingScaffold407/08/2026
Kordun ConstructionPlumbing307/08/2026
R.A. Phillips Electrical ContElectrical203/21/2026
Schlesinger Elect'l ContractingElectrical103/22/2026
Schlesinger Elect'l ContractingElectrical103/21/2026
Thorn ElectricElectrical103/21/2026
Kordun ConstructionScaffold107/08/2026
AA Reale ElectricElectrical103/21/2026
Metrocity GroupPlumbing103/22/2026
Csi Sec & ElectricElectrical103/22/2026
Gustave Dileo, JRElectrical103/21/2026
Hylan Datacom & ElectricalElectrical103/22/2026
Q.Y. ElectricElectrical103/22/2026
Raiden ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589903/19/2026
Socotec Engineering4983801/06/2026
AK Consulting Services, I6198305/10/2024
Bitopi Consultants7036407/09/2021
Building Lifecycle
All (162)Filed (30)Permit Issued (30)Signed Off (6)Facade (FISP) (12)Violation (42)Inspection (4)Objection (8)Special Inspection (30)
04/09/2026
Permit issued — Mechanical Systems
X01016572-S2-MS
03/31/2026
Special inspection requirement — Maintenance information
MARISA HARTE
03/31/2026
Special inspection requirement — Mechanical Systems
MARISA HARTE
03/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARISA HARTE
03/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
MARISA HARTE
03/31/2026
Special inspection requirement — Final
MARISA HARTE
03/31/2026
Special inspection requirement — Heating Systems
MARISA HARTE
03/31/2026
Special inspection requirement — Duct leakage testing, insulation and design
MARISA HARTE
03/31/2026
Special inspection requirement — Ventilation and air distribution system
MARISA HARTE
03/31/2026
Special inspection requirement — Chimneys and vents
MARISA HARTE
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
03/31/2026
Special inspection requirement — Shutoff dampers
MARISA HARTE
03/20/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
03/19/2026
Filed — Alteration
Replace existing floor drains with new drains. Install new gas service for the new boiler. Connect new boilers to city water supply as required.
X01016572-P7
03/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
03/19/2026
Special inspection requirement — Maintenance information
MARISA HARTE
03/19/2026
Special inspection requirement — Duct leakage testing, insulation and design
MARISA HARTE
03/19/2026
Special inspection requirement — Final
MARISA HARTE
03/19/2026
Special inspection requirement — Ventilation and air distribution system
MARISA HARTE
03/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/19/2026
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
03/19/2026
Special inspection requirement — Heating Systems
MARISA HARTE
03/19/2026
Special inspection requirement — Chimneys and vents
MARISA HARTE
03/19/2026
Special inspection requirement — Mechanical Systems
MARISA HARTE
03/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARISA HARTE
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
03/19/2026
Special inspection requirement — Shutoff dampers
MARISA HARTE
02/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/21/2026
Permit issued — Boiler Equipment
X01016572-S6-BE
01/20/2026
Permit issued — Construction Fence
X00989977-I1-FN
01/15/2026
Special inspection requirement — Heating Systems
MARISA HARTE
01/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARISA HARTE
01/15/2026
Special inspection requirement — Permanent certificate
MARISA HARTE
01/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARISA HARTE
01/14/2026
Permit issued — Supported Scaffold
X01339646-I1-SF
01/06/2026
Filed — Alteration
INSTALLATION OF SCAFFOLD AT BUILDING #1 CHIMNEY FOR WORK ACCESS.
X01339646-I1
01/05/2026
Permit issued — Sidewalk Shed
X00989964-I1-SH
12/15/2025
Filed — Alteration
Replace existing floor drains with new drains. Install new gas service for the new boiler. Connect new boilers to city water supply as required.
X01016572-P6
12/15/2025
Permit issued — Plumbing
X01016572-S1-PL
12/11/2025
Permit issued — Structural
X01016572-S3-ST
11/24/2025
Filed — Alteration
Replace existing floor drains with new drains. Install new gas service for the new boiler. Connect new boilers to city water supply as required.
X01016572-P5
11/17/2025
Permit issued — General Construction
X01016572-I1-GC
10/28/2025
Filed — Alteration
Replace existing floor drains with new drains. Install new gas service for the new boiler. Connect new boilers to city water supply as required.
X01016572-P4
10/28/2025
Filed — Alteration
Replace existing floor drains with new drains. Install new gas service for the new boiler. Connect new boilers to city water supply as required.
X01016572-P3
10/14/2025
Filed — Alteration
NYCHA MONROE HOUSES (BUILDING #1), INSTALLATION OF A 18233-GALLON OIL TANK CONNECTED TO MOBILE BOILER TRAILERS (QTY: 03) SUBMITTING ON BEHALF OF THE CONTRACTOR IN CONJUNCTION WITH DOB # X01016572. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01290492-P1
10/14/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Permit issued — Boiler Equipment
X01290492-I1-BE
09/28/2025
Filed — Alteration
NYCHA MONROE HOUSES (BUILDING #1), INSTALLATION OF A 18233-GALLON OIL TANK CONNECTED TO MOBILE BOILER TRAILERS (QTY: 03) SUBMITTING ON BEHALF OF THE CONTRACTOR IN CONJUNCTION WITH DOB # X01016572. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01290492-I1
09/17/2025
Permit issued — Plumbing
X01193504-S2-PL
09/12/2025
Permit issued — Mechanical Systems
X01193504-I1-MS
09/03/2025
Permit issued — Boiler Equipment
X01193504-S1-BE
04/08/2025
Objection resolved — Addressed
04/07/2025
Objection raised — Energy
03/31/2025
Filed — Alteration
Installation of new steam and condensate piping for the temp boilers located in the adjacent parking lot on grounds as per plans filed herewith
X01193504-S1
03/27/2025
Filed — Alteration
Installation of new steam and condensate piping for the temp boilers located in the adjacent parking lot on grounds as per plans filed herewith
X01193504-S2
03/27/2025
Filed — Alteration
Installation of new steam and condensate piping for the temp boilers located in the adjacent parking lot on grounds as per plans filed herewith
X01193504-I1
01/23/2025
Permit issued — Construction Fence
X00989977-I1-FN
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedKordun Construction04/09/2026
DOB NOWBoiler EquipmentPermit IssuedKordun Construction01/21/2026
DOB NOWConstruction FencePermit IssuedZoria Housing01/20/2026
DOB NOWSupported ScaffoldPermit IssuedKordun Construction01/14/2026
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises01/05/2026
DOB NOWPlumbingPermit IssuedKordun Construction12/15/2025
DOB NOWStructuralPermit IssuedKordun Construction12/11/2025
DOB NOWGeneral ConstructionPermit IssuedKordun Construction11/17/2025
DOB NOWBoiler EquipmentSigned-offChampion Combustion10/02/2025
DOB NOWPlumbingPermit IssuedKordun Construction09/17/2025
DOB NOWMechanical SystemsPermit IssuedKordun Construction09/12/2025
DOB NOWBoiler EquipmentPermit IssuedChampion Combustion09/03/2025
DOB NOWConstruction FencePermit IssuedZoria Housing01/23/2025
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises01/09/2025
DOB NOWSuspended ScaffoldPermit IssuedA.B.C.D. Construction05/22/2024
DOB NOWSuspended ScaffoldPermit IssuedA.B.C.D. Construction05/10/2024
DOB NOWConstruction FencePermit IssuedZoria Housing01/16/2024
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises01/16/2024
DOB NOWSuspended ScaffoldPermit IssuedA.B.C.D. Construction12/21/2023
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding04/05/2022
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/03/2022
DOB NOWSidewalk ShedSigned-offRoma Scaffolding02/03/2022
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding04/09/2021
DOB NOWSidewalk ShedSigned-offRoma Scaffolding02/09/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/04/2021
DOB NOWSidewalk ShedSigned-offRoma Scaffolding03/05/2020
DOB NOWConstruction FenceSigned-offRoma Scaffolding03/02/2020
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding07/23/2019
DOB NOWSidewalk ShedSigned-offRoma Scaffolding07/23/2019
DOB NOWConstruction FenceSigned-offRoma Scaffolding07/19/2019
BISOTISSUEDRoma Scaffolding02/23/2023
BISOTISSUEDRoma Scaffolding02/03/2022
BISOTISSUEDRoma Scaffolding02/11/2020
BISOTISSUEDRoma Scaffolding09/27/2019
BISEQISSUEDAkro General Contracting02/26/2013
BISEQISSUEDAMC United10/14/2011
BISEQISSUEDAMC United10/14/2011
BISEQISSUEDAMC United10/06/2011
BISEQISSUEDM.S.S. Construction03/10/2011
BISPLISSUEDDynamic Contracting03/10/2011
+ 14 more permits on file
2 projects · most recent 03/19/2026
Ventilation Systems Heating Systems
FiledStatusContractorScope
03/19/2026Permit IssuedKordun ConstructionVentilation Systems
03/31/2025Permit IssuedKordun ConstructionHeating Systems
2 projects · most recent 03/19/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/19/2026Permit IssuedKordun ConstructionGas, Water/Sanitary
03/31/2025Permit IssuedKordun ConstructionGas, Water/Sanitary
10 projects · most recent 01/23/2026
General Wiring
FiledStatusContractorScope
01/23/2026Permit IssuedSchlesinger Elect'l Contracting—
09/08/2025Permit IssuedMac Fhionnghaile & Sons—
07/08/2025Permit IssuedMac Fhionnghaile & SonsGeneral Wiring
01/03/2024Permit IssuedQ.Y. Electric—
01/02/2024CompleteTri-State Electrical & Mechanical IGeneral Wiring
09/08/2021CompleteCsi Sec & ElectricGeneral Wiring
08/11/2021CompleteHylan Datacom & Electrical—
01/28/2021Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
11/05/2019Permit IssuedRaiden Electric—
07/10/2019Permit IssuedRaiden Electric—
1 project · most recent 03/19/2026
Steel Concrete
FiledStatusContractorScope
03/19/2026Permit IssuedKordun ConstructionSteel, Concrete
2 projects · most recent 05/10/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
05/10/2024Permit Issued—Suspended Scaffold (SC)
11/28/2023Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/20/2026Fail-Final Boiler Equipment InspectionFailView ↗
02/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 112
DateRequirementInspectorRole
03/31/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
03/31/2026Duct leakage testing, insulation and designMARISA HARTEenergy_progress
03/31/2026Ventilation and air distribution systemMARISA HARTEenergy_progress
03/31/2026HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
03/31/2026Maintenance informationMARISA HARTEenergy_progress
03/31/2026Shutoff dampersMARISA HARTEenergy_progress
03/31/2026HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
03/31/2026Energy Code Compliance InspectionsMARISA HARTEprogress
03/31/2026FinalMARISA HARTEprogress
03/31/2026Chimneys and ventsMARISA HARTEspecial
03/31/2026Mechanical SystemsMARISA HARTEspecial
03/31/2026Heating SystemsMARISA HARTEspecial
03/31/2026Tenant Protection Plan ComplianceMARISA HARTEspecial
03/19/2026Maintenance informationMARISA HARTEenergy_progress
03/19/2026FinalMARISA HARTEprogress
03/19/2026Energy Code Compliance InspectionsMARISA HARTEprogress
03/19/2026Tenant Protection Plan Compliance—special
03/19/2026Mechanical SystemsMARISA HARTEspecial
03/19/2026Heating SystemsMARISA HARTEspecial
03/19/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
03/19/2026Chimneys and ventsMARISA HARTEspecial
03/19/2026HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
03/19/2026Ventilation and air distribution systemMARISA HARTEenergy_progress
03/19/2026Duct leakage testing, insulation and designMARISA HARTEenergy_progress
03/19/2026HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
Latest 25 of 112.
▾Documents — 372 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch24
08/25/2026X00495685-I1Request digital key ↗
08/25/2026X00495685-P1Request digital key ↗
08/22/2026X00968754-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/26/2026X00194637-I1Request digital key ↗
08/26/2026X00323295-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00194642-I1Request digital key ↗
08/26/2026X00323248-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/26/2026X00194643-I1Request digital key ↗
08/15/2026X00194643-P1Request digital key ↗
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION18
05/18/2021240261060Open ↗
09/18/2019240260123Open ↗
09/17/2019240262158Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION17
05/27/2021240261060Open ↗
02/12/2020240260123Open ↗
09/27/2019240260123Open ↗
Showing 3 of 17 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications8
02/19/2014220014124Open ↗
02/19/2014220014124Open ↗
04/21/2012220145554Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications125
▸DOB NOWSpecial Inspector Seal & Signature32
10/09/2026X01016572-P5Open ↗
09/23/2026X01290492-P1Open ↗
09/23/2026X01290492-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/26/2026X00194643-P1Open ↗
08/26/2026X00194643-I1Open ↗
08/26/2026X00194637-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
10/09/2026X01016572-P5Open ↗
10/09/2026X01016572-P5Open ↗
09/05/2026X01016572-S3Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
02/19/2014220014124Open ↗
02/12/2014220014124Open ↗
04/21/2012220103607Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
02/12/2014220014124Open ↗
02/26/2013220254383Open ↗
10/17/2011220145554Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
02/26/2013220254383Open ↗
10/17/2011220145554Open ↗
10/14/2011220145563Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/17/2019240262158Open ↗
09/14/2019240261060Open ↗
08/22/2019240260123Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/17/2019240262158Open ↗
09/14/2019240261060Open ↗
08/22/2019240260123Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/17/2019240262158Open ↗
09/14/2019240261060Open ↗
08/22/2019240260123Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
06/03/2011220040881Open ↗
▸BISSCHEDULE B - PLUMBING1
01/04/2010220040881Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan6
08/13/2026X00194642-I1Open ↗
08/13/2026X00194637-I1Open ↗
08/13/2026X00194643-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
09/17/2019240262158Open ↗
09/14/2019240261060Open ↗
08/22/2019240260123Open ↗
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/17/2026X01016572-S1Open ↗
08/17/2026X01016572-S2Open ↗
08/17/2026X01016572-P6Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
02/26/2013220254383Open ↗
02/07/2011220103607Open ↗
06/23/2009220014124Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/17/2011220145554Open ↗
12/30/2009220040881Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)2
05/27/2021240261060Open ↗
08/22/2019240260123Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
09/27/2019240260123Open ↗
09/14/2019240261060Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0335BX211
12/05/2023240261060Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/15/2020240260123Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
11/30/2023240261060Open ↗
05/27/2021240261060Open ↗
06/15/2020240260123Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
11/30/2023240261060Open ↗
06/15/2020240260123Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/14/2019240261060Open ↗
08/22/2019240260123Open ↗
▸BISNYCECC ANALYSIS2
09/14/2019240261060Open ↗
08/22/2019240260123Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
12/04/2023240261060Open ↗
12/04/2023240261060Open ↗
05/27/2021240261060Open ↗
Showing 3 of 8 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
05/27/2021240261060Open ↗
08/22/2019240260123Open ↗
▸Approvals, Objections & Sign-offs89
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter30
08/26/2026X00194643-I1Open ↗
08/26/2026X00194643-P1Open ↗
08/21/2026X01041436-P1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)20
08/17/2026X01016572-P7Open ↗
08/13/2026X00194642-I1Open ↗
08/13/2026X00194637-I1Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
12/05/2023240261060Open ↗
06/15/2020240260123Open ↗
02/19/2014220014124Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
02/19/2014220014124Open ↗
04/21/2012220103607Open ↗
04/21/2012220145554Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
02/26/2013220254383Open ↗
10/17/2011220145554Open ↗
10/14/2011220145563Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
08/13/2026X00194642-I1Open ↗
08/13/2026X00194637-I1Open ↗
08/13/2026X00194643-I1Open ↗
Showing 3 of 6 on file for this type
▸BISBSA-CPC APPROVAL2
10/17/2011220145554Open ↗
10/12/2011220144109Open ↗
▸BISSHED LETTER1
02/15/2011220103607Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
11/30/2023240261060Open ↗
06/15/2020240260123Open ↗
09/17/2019240262158Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET10
02/26/2013220254383Open ↗
10/17/2011220145554Open ↗
10/14/2011220145563Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/17/2019240262158Open ↗
09/14/2019240261060Open ↗
08/22/2019240260123Open ↗
▸BISADDITIONAL INFORMATION2
02/12/2014220014124Open ↗
11/14/2011220144109Open ↗
▸Other Documents6
▸DOB NOWCalculations3
08/13/2026X01041436-I1Open ↗
08/13/2026X01041436-P1Open ↗
08/13/2026X00968754-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026X01041436-I1Open ↗
08/13/2026X01041436-P1Open ↗
08/13/2026X00968754-I1Open ↗