← Back
Primarily 2 family with 1 store or office
1788 BROADWAY
BROOKLYN · BIN 3041191
💬 Discuss this project
1925Year Built
3Stories
S2Building Class
R6Zoning
3,300 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: BRISTOL 21 LLC · 1,637 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 4 docs
Floor 11p · 1 filing · 12 docs
Cellar7p · 1 filing · 16 docs
1 job · most recent 08/12/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2021——Ventilation Systems
Ventilation
Econ-Air EABDU18 3,600 CFM · Exhaust Fan ×1
1 job · most recent 12/07/2025
Gas
FiledStatusContractorScope
12/07/2025Signed-offALL PRO PLBG & HTG INCGas
Building Lifecycle
All (62)Filed (7)Permit Issued (4)Signed Off (1)Violation (25)Inspection (10)Special Inspection (15)
05/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/24/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAZAL BANGASH
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAZAL BANGASH
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Foster
12/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAZAL BANGASH
12/07/2025
Filed — Alteration
1. INSTALL NEW BOILER (01) AND HWH (01) IN THE CELLAR FOR (3RD FLOOR,APT#3).2. REPLACE EXISTING BOILER (01) AND HWH (01) FOR (2ND FLOOR ,APT#2)
B01182485-P2
12/05/2025
Filed — Alteration
1. INSTALL NEW BOILER (01) AND HWH (01) IN THE CELLAR FOR (3RD FLOOR,APT#3).2. REPLACE EXISTING BOILER (01) AND HWH (01) FOR (2ND FLOOR ,APT#2)
B01182485-P1
12/05/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAZAL BANGASH
12/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAZAL BANGASH
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Foster
12/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAZAL BANGASH
11/21/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
11/14/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/07/2025
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
06/09/2025
Permit issued — Plumbing
B01182485-S1-PL
06/09/2025
Permit issued — Boiler Equipment
B01182485-I1-BE
03/25/2025
Filed — Alteration
1. INSTALL NEW BOILER (01) AND HWH (01) IN THE CELLAR FOR (3RD FLOOR,APT#3).2. REPLACE EXISTING BOILER (01) AND HWH (01) FOR (2ND FLOOR ,APT#2)
B01182485-I1
03/25/2025
Filed — Alteration
1. INSTALL NEW BOILER (01) AND HWH (01) IN THE CELLAR FOR (3RD FLOOR,APT#3).2. REPLACE EXISTING BOILER (01) AND HWH (01) FOR (2ND FLOOR ,APT#2)
B01182485-S1
07/15/2024
Violation issued (FDNY_ORDER, closed)
07/15/2024
Violation issued (FDNY_ORDER, closed)
07/15/2024
Violation issued (FDNY_ORDER, closed)
07/15/2024
Violation issued (FDNY_ORDER, closed)
07/15/2024
Violation issued (FDNY_ORDER, closed)
10/10/2023
Signed off — Alteration
B00418678-I1
10/03/2023
Filed — Alteration
B00418678-P1
10/03/2023
Special inspection requirement — Energy Code Compliance Inspections
Yahaira Volquez Colombo
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
11/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
11/15/2022
Special inspection requirement — Energy Code Compliance Inspections
Yahaira Volquez Colombo
10/11/2022
Permit issued — Plumbing
B00418678-I1-PL
08/12/2021
Filed — Alteration
INSTALL A NEW KITCHEN HOOD, EXHAUST FAN AND ASSOCIATED DUCT WORK AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00569096-I1
08/02/2021
Special inspection requirement — Final
Jay Kavi
08/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM HOQUE
08/02/2021
Special inspection requirement — Mechanical Systems
AKM HOQUE
02/26/2021
Permit issued — Plumbing
B00418678-I1-PL
02/12/2021
Filed — Alteration
B00418678-I1
07/26/2004
Violation issued (HPD, closed)
B
07/26/2004
Violation issued (HPD, closed)
A
07/26/2004
Violation issued (HPD, closed)
B
07/26/2004
Violation issued (HPD, closed)
B
07/26/2004
Violation issued (HPD, closed)
B
07/26/2004
Violation issued (HPD, closed)
A
07/26/2004
Violation issued (HPD, closed)
B
07/26/2004
Violation issued (HPD, closed)
A
07/26/2004
Violation issued (HPD, closed)
C
07/26/2004
Violation issued (HPD, closed)
A
07/26/2004
Violation issued (HPD, closed)
A
07/26/2004
Violation issued (HPD, closed)
A
07/26/2004
Violation issued (HPD, closed)
A
07/26/2004
Violation issued (HPD, closed)
A
07/26/2004
Violation issued (HPD, closed)
A
07/26/2004
Violation issued (HPD, closed)
C
07/26/2004
Violation issued (HPD, closed)
A
07/26/2004
Violation issued (HPD, closed)
B
Latest 60 of 62 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NETDT1104/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/16/2023$1.1M—1788 BROADWAY LLC → BRISTOL 21 LLC$324/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.212/07/2025
ASHRAF CORP312/05/2025
COLOMBO ARCHITECTURAL STUDIO PC210/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AN TONG FAN203/21/2026
LLOYD NOEL BUILDING CONSULTANT203/21/2026
NETDT803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL PRO PLBG & HTG INCPlumbing207/08/2026
ARANDA PLBG & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLOMBO ARCHITECTURAL STU4930210/03/2023
ASHRAF CORPORATION1973108/12/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC06/09/2025
DOB NOWBoiler EquipmentSigned-offALL PRO PLBG & HTG INC06/09/2025
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP10/11/2022
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP02/26/2021
BISOTISSUEDR & SS GENERAL CONSTRUCTI01/15/2021
BISOTISSUEDNEST BUILDERS CORP11/18/2020
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/24/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/21/2025Fail-Final Boiler Equipment InspectionFailView ↗
11/14/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/07/2025No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
12/08/2025HVAC-R and service water heating system controlsFAZAL BANGASHenergy_progress
12/08/2025HVAC-R and service water heating equipmentFAZAL BANGASHenergy_progress
12/08/2025Energy Code Compliance InspectionsEric Fosterprogress
12/08/2025HVAC-R and service water piping design and insulationFAZAL BANGASHenergy_progress
12/05/2025HVAC-R and service water heating equipmentFAZAL BANGASHenergy_progress
12/05/2025HVAC-R and service water heating system controlsFAZAL BANGASHenergy_progress
12/05/2025Energy Code Compliance InspectionsEric Fosterprogress
12/05/2025HVAC-R and service water piping design and insulationFAZAL BANGASHenergy_progress
10/03/2023Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
10/03/2023Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
11/15/2022Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
11/15/2022Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
08/02/2021FinalJay Kaviprogress
08/02/2021Fire-Resistant Penetrations and JointsAKM HOQUEspecial
08/02/2021Mechanical SystemsAKM HOQUEspecial
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
09/01/2026B00569096-I1Request digital key ↗
08/19/2026B01182485-P1Request digital key ↗
08/19/2026B01182485-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00418678-P1Request digital key ↗
09/01/2026B00418678-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
01/19/2021340784422Open ↗
12/23/2020340784422Open ↗
11/18/2020340784422Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/18/2023340784422Open ↗
11/06/2020340784422Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B01182485-I1Open ↗
09/19/2026B00418678-I1Open ↗
08/26/2026B01182485-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00418678-I1Open ↗
09/01/2026B00418678-P1Open ↗
08/19/2026B01182485-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/19/2026B00418678-I1Open ↗
08/22/2026B00418678-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/06/2020340784422Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/06/2020340784422Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/06/2020340784422Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
09/01/2026B00418678-P1Open ↗
09/01/2026B00418678-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
11/06/2020340784422Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00418678-I1Open ↗
09/01/2026B00418678-P1Open ↗
08/19/2026B01182485-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/06/2020340784422Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/18/2020340784422Open ↗
11/06/2020340784422Open ↗
▸BISINTERIOR LIGHTING POWER1
09/27/2023340784422Open ↗
▸BISNYCECC ANALYSIS1
11/06/2020340784422Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/27/2023340784422Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/27/2023340784422Open ↗
▸BISLIGHTING CONTROLS1
09/27/2023340784422Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/06/2020340784422Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/18/2020340784422Open ↗
11/06/2020340784422Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/27/2023340784422Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSUPERSEDING LETTER2
01/19/2021340784422Open ↗
12/23/2020340784422Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/17/2023340784422Open ↗
▸BISFINAL1
09/27/2023340784422Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
11/06/2020340784422Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/16/2023340784422Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM2
01/19/2021340784422Open ↗
12/23/2020340784422Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/06/2020340784422Open ↗