← Back
BuildNYC
One family attached or semi-detached
1788 EAST 93RD STREET
BROOKLYN · Canarsie · BIN 3235146
💬 Discuss this project
1965Year Built
2Stories
A5Building Class
R5Zoning
1,216 sfGross Floor Area
1Units
One family attached or semi-detached · 2,100 sf lot · 0.58 FAR built · Flood zone AE
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering104/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation ServiceGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272104/25/2025
Building Lifecycle
08/26/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214988-I1
04/30/2025
Permit issued — Solar
B01214988-I1-SL
04/25/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214988-I1
04/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service04/30/2025
2 projects · most recent 06/02/2025
General Wiring
FiledStatusContractorScope
06/02/2025Permit IssuedSunrun Solar ElectlGeneral Wiring
07/26/2018CompleteDynamo ElectricalGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/23/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/23/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/23/2025Energy Code Compliance InspectionsWalid Abdullaprogress
04/23/2025FinalWalid Abdullaprogress
04/23/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account