← Back
Three families
1789 WEST 9 STREET
BROOKLYN · BIN 3176715
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
R5BZoning
1,296 sfGross Floor Area
3Units
Three families · 1,700 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
Architecture
Floor 12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T C DESIGN704/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/12/2025$420K—Private party → Private party$324/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VKW DESIGN INC307/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor104/09/2026
TRI CITY MECHANICAL GROUP CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC DESIGN INC9758307/01/2026
Building Lifecycle
All (10)Filed (3)Permit Issued (2)Signed Off (1)Inspection (4)
08/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2026
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF CELLAR AND 1FL OF EXISTING 2 STORY BUILDING. TO REPLACE FLOORING, CEILING, NEW PAINTING THROUGHOUT. CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01354504-I1
07/01/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF CELLAR AND 1FL OF EXISTING 2 STORY BUILDING. TO REPLACE FLOORING, CEILING, NEW PAINTING THROUGHOUT. CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01354504-P1
06/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/09/2026
Permit issued — Plumbing
B01354504-S1-PL
02/20/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF CELLAR AND 1FL OF EXISTING 2 STORY BUILDING. TO REPLACE FLOORING, CEILING, NEW PAINTING THROUGHOUT. CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01354504-S1
02/05/2026
Permit issued — General Construction
B01354504-I1-GC
02/04/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF CELLAR AND 1FL OF EXISTING 2 STORY BUILDING. TO REPLACE FLOORING, CEILING, NEW PAINTING THROUGHOUT. CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01354504-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP03/09/2026
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY02/05/2026
1 project · most recent 07/01/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/01/2026Signed-offTRI CITY MECHANICAL GROUPGas, Water/Sanitary
1 project · most recent 03/14/2026
General Wiring
FiledStatusContractorScope
03/14/2026CompleteY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/02/2026HVAC-R and service water heating system controlsEric Sunenergy_progress
07/02/2026HVAC-R and service water piping design and insulationEric Sunenergy_progress
07/02/2026HVAC-R and service water heating equipmentEric Sunenergy_progress
07/02/2026Fire-Resistant Penetrations and JointsEric Sunspecial
07/02/2026Energy Code Compliance InspectionsEric Sunprogress
06/30/2026HVAC-R and service water heating equipmentEric Sunenergy_progress
06/30/2026HVAC-R and service water piping design and insulationEric Sunenergy_progress
06/30/2026HVAC-R and service water heating system controlsEric Sunenergy_progress
06/30/2026Fire-Resistant Penetrations and JointsEric Sunspecial
06/30/2026Energy Code Compliance InspectionsEric Sunprogress
02/02/2026FinalEric Sunprogress
02/02/2026Fire-Resistant Penetrations and JointsEric Sunspecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026B01354504-I1Request digital key ↗
08/18/2026B01354504-P1Request digital key ↗
08/18/2026B01354504-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/18/2026B01354504-P1Open ↗
08/13/2026B01354504-S1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026B01354504-P1Open ↗
08/18/2026B01354504-S1Open ↗
08/18/2026B01354504-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026B01354504-S1Open ↗
08/25/2026B01354504-S1Open ↗
08/24/2026B01354504-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026B01354504-S1Open ↗
08/24/2026B01354504-I1Open ↗
08/23/2026B01354504-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026B01354504-P1Open ↗
08/13/2026B01354504-S1Open ↗
08/13/2026B01354504-I1Open ↗