P.S. 95 Eastwood
179-01 90TH AVENUE · Jamaica · BIN 4446042
💬 Discuss this project
1932Year Built
4Stories
W1Building Class
R4-1Zoning
109,400 sfGross Floor Area
0Units
LL97 Covered15 Active Violations 4 unresolved · 11 paperwork only 1 likely answered ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 62,339 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 095 EastwoodUnder Construction2p · 1 filing · 17 docs
Floor 4P.S. 095 Eastwood14p · 3 filings · 18 docs
Floor 3P.S. 095 Eastwood15p · 4 filings · 18 docs
Floor 2P.S. 095 Eastwood17p · 3 filings · 18 docs
Floor 1P.S. 095 EastwoodUnder Construction84p · 7 filings · 17 docs
CellarP.S. 095 Eastwood5p · 1 filing · 17 docs
Site & exteriorP.S. 095 Eastwood, P.S. 95 Queens41p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority11609/13/2026
NYC Department of Education303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STV612/15/2025
Jacob Feinberg Katz & Michaeli Cons1512/10/2025
David Ziskind2212/04/2024
Dseny Engineering Services107/17/2024
AK Consulting Services107/11/2023
Greenman-Pedersen401/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates8603/21/2026
AK Consulting Services203/21/2026
Greenman-Pedersen803/21/2026
Dseny Engineering Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Urban EcospacesGeneral Contractor1007/08/2026
Navillus TileGeneral Contractor608/16/2026
Sai JI Plumbingspecialty_contractor504/09/2026
Varsity Plumbing and HeatingPlumbing407/08/2026
Urban EcospacesScaffold403/21/2026
Sai JI PlumbingPlumbing407/08/2026
ABC Construction ContGeneral Contractor307/08/2026
North Shore Climate ContractingGeneral Contractor107/08/2026
Charan Electrical Enterp'sElectrical103/22/2026
Prince ElectricElectrical103/21/2026
ABC Construction ContScaffold104/09/2026
Sortino JosephElectrical103/21/2026
Olympic Plumbing & Heating ServicePlumbing107/08/2026
Par Plumbing CoPlumbing108/25/2026
Urban ElectricalElectrical103/22/2026
E.N.E.L. ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons1061412/15/2025
Universal Testing and Ins4001204/01/2025
MP Engineers & Architects1438103/27/2023
Building Lifecycle
All (208)Filed (49)Permit Issued (32)Signed Off (3)Violation (60)Inspection (2)Objection (32)Special Inspection (30)
08/24/2026
Permit issued — Plumbing
Q00817599-S2-PL
08/14/2026
Permit issued — General Construction
Q00817599-I1-GC
08/03/2026
Signed off — Alteration
P.S. 095-Q: PROPOSED MODIFICATION OF EXTERIOR WALL BUILDING IN EXISTING BUILDING TO INDICATE CONNECTION BETWEEN NEW AND EXISTING BUILDINGS. EXTERIOR WINDOWS AT NORTH WALL. FILED IN CONJUNCTION WITH NB APPLICATION No. Q08023576-I1.
Q00815319-I1
06/26/2026
Permit issued — General Construction
Q00823318-S1-GC
06/26/2026
Permit issued — General Construction
Q00823318-I1-GC
06/09/2026
Violation issued (ECB, open)
Construction
06/09/2026
Violation issued (ECB, open)
Construction
06/09/2026
Violation issued (ECB, open)
Construction
02/20/2026
Violation issued (FDNY_ORDER, closed)
12/23/2025
Objection resolved — Addressed
12/17/2025
Permit issued — Structural
Q00815319-I1-GC-CX
12/17/2025
Objection raised — Other
12/17/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
GEORGE GHEBRYAL
12/17/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/17/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
12/17/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
12/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
12/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
12/15/2025
Filed — Alteration
P.S. 095-Q: PROPOSED MODIFICATION OF EXTERIOR WALL BUILDING IN EXISTING BUILDING TO INDICATE CONNECTION BETWEEN NEW AND EXISTING BUILDINGS. EXTERIOR WINDOWS AT NORTH WALL. FILED IN CONJUNCTION WITH NB APPLICATION No. Q08023576-I1.
Q00815319-P1
12/12/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
12/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/12/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
GEORGE GHEBRYAL
12/12/2025
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
12/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
12/12/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
12/10/2025
Filed — Alteration
PS95Q-Existing Building. New tamper and flow switches added to existing sprinkler system. No change in use, occupancy, egress. All as per plans filed herewith
Q01327801-I1
12/04/2025
Violation issued (FDNY_ORDER, closed)
12/04/2025
Violation issued (FDNY_ORDER, closed)
12/04/2025
Violation issued (FDNY_ORDER, closed)
12/04/2025
Violation issued (FDNY_ORDER, closed)
12/03/2025
Special inspection requirement — Sprinkler Systems
11/12/2025
Permit issued — Plumbing
Q00772534-S1-PL
10/21/2025
Permit issued — Plumbing
Q00584751-I1-PL
10/21/2025
Permit issued — Mechanical Systems
Q00584751-S1-MS
10/20/2025
Violation issued (ECB, open)
Boilers
10/16/2025
Signed off — Alteration
FN/PS95Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB # Q01004766 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01077840-I1
09/25/2025
Violation issued (ECB, open)
Construction
09/25/2025
Violation issued (ECB, open)
Construction
09/25/2025
Violation issued (ECB, closed)
Construction
09/25/2025
Violation issued (ECB, open)
Construction
07/21/2025
Violation issued (FDNY_ORDER, closed)
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
04/24/2025
Permit issued — General Construction
Q00823318-S1-GC
04/24/2025
Permit issued — Mechanical Systems
Q00823318-S1-MS
04/01/2025
Filed — Alteration
P.S95Q:Shutoff, removal and capping of existing service gas line, from existing valve at property line along 179th Place, down to north facade of existing building on block 9914, Lot 1.No change in use, egress or occupancy. All as per plans filed herewith
Q01004766-P5
03/24/2025
Permit issued — General Construction
Q00823318-I1-GC
12/04/2024
Filed — Alteration
P.S. 095-Q: PROPOSED INTERIOR RENOVATION DUE TO INSTALLATION OF NEW FIRE ALARM SYSTEM AND REMOVAL OF EXISTING FIRE ALARM SYSTEM.
Q00823318-P3
12/04/2024
Filed — Alteration
P.S. 095-Q: PROPOSED INTERIOR RENOVATION DUE TO INSTALLATION OF NEW FIRE ALARM SYSTEM AND REMOVAL OF EXISTING FIRE ALARM SYSTEM.
Q00823318-P4
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/04/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/04/2024
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/26/2024
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
11/26/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
11/04/2024
Permit issued — Plumbing
Q00772534-S1-PL
09/27/2024
Permit issued — Plumbing
Q00584751-I1-PL
09/23/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 95Q AT 179-01 90 AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00901739-I1
Latest 60 of 208 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPar Plumbing Co08/24/2026
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile08/14/2026
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile06/26/2026
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile06/26/2026
DOB NOWStructuralSigned-offNavillus Tile12/17/2025
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating11/12/2025
DOB NOWPlumbingPermit IssuedSai JI Plumbing10/21/2025
DOB NOWMechanical SystemsPermit IssuedSai JI Plumbing10/21/2025
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile04/24/2025
DOB NOWMechanical SystemsPermit IssuedNorth Shore Climate Contracting04/24/2025
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile03/24/2025
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating11/04/2024
DOB NOWPlumbingPermit IssuedSai JI Plumbing09/27/2024
DOB NOWGeneral ConstructionPermit IssuedABC Construction Cont09/10/2024
DOB NOWGeneral ConstructionPermit IssuedABC Construction Cont09/10/2024
DOB NOWPlumbingPermit IssuedOlympic Plumbing & Heating Service09/06/2024
DOB NOWConstruction FenceSigned-offABC Construction Cont09/06/2024
DOB NOWConstruction FenceSigned-offUrban Ecospaces08/22/2024
DOB NOWGeneral ConstructionPermit IssuedUrban Ecospaces07/31/2024
DOB NOWGeneral ConstructionPermit IssuedUrban Ecospaces07/30/2024
DOB NOWGeneral ConstructionPermit IssuedUrban Ecospaces07/30/2024
DOB NOWGeneral ConstructionPermit IssuedUrban Ecospaces11/07/2023
DOB NOWStructuralPermit IssuedUrban Ecospaces11/07/2023
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating10/31/2023
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating10/31/2023
DOB NOWGeneral ConstructionSigned-offUrban Ecospaces10/27/2023
DOB NOWGeneral ConstructionPermit IssuedUrban Ecospaces10/27/2023
DOB NOWConstruction FenceSigned-offUrban Ecospaces08/17/2023
DOB NOWMechanical SystemsPermit IssuedSai JI Plumbing04/14/2023
DOB NOWPlumbingPermit IssuedSai JI Plumbing04/14/2023
DOB NOWMechanical SystemsPermit IssuedSai JI Plumbing02/28/2022
DOB NOWPlumbingPermit IssuedSai JI Plumbing02/03/2022
BISOTISSUEDMilad Contracting01/09/2014
BISOTISSUEDMilad Contracting12/18/2012
BISOTISSUEDIannelli Construction Co09/29/2008
BISEQISSUEDIannelli Construction Co01/22/2004
BISEQISSUEDYork Scaffold Equipment01/08/2004
BISOTRE-ISSUEDIanelli Construction Co11/21/2003
BISPLISSUEDForsythe P&H08/21/2003
BISMHISSUEDForysthe Plumbing & Heating08/21/2003
+ 21 more permits on file
3 projects · most recent 12/04/2024
Ventilation Systems Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/04/2024Permit IssuedNavillus TileVentilation Systems
Ventilation
Greenheck CSP-A390VG 75 CFM · Exhaust Fan ×3
Ducts & Piping
Greenheck CSP-A390VG 75 CFM · Exhaust Fan ×3
03/27/2023Permit IssuedNavillus TileAssociated Ducts and Piping, Ventilation Systems
Ventilation
Mitsubishi Electric PKFY-P24NHMU-TH 920 CFM · Vrf Indoor ×2
PUY-A24NHA7 920 CFM · Condensing Unit ×1
Greenheck QEI-15 1,500 CFM · Exhaust Fan ×1
USF-16 2,520 CFM · Exhaust Fan ×1
Ducts & Piping
Greenheck USF-16 2,520 CFM · Exhaust Fan ×1
01/24/2022Permit IssuedSai JI PlumbingHeating Systems—
1 project · most recent 12/10/2025
FiledStatusContractorScope
12/10/2025——3 heads
6 projects · most recent 12/10/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
12/10/2025———
04/01/2025Permit IssuedOlympic Plumbing & Heating ServiceGas
08/30/2024Permit IssuedVarsity Plumbing and HeatingGas, Storm, Water/Sanitary
08/07/2024Permit IssuedVarsity Plumbing and HeatingWater/Sanitary
03/27/2023Permit IssuedPar Plumbing CoWater/Sanitary
01/24/2022Permit IssuedSai JI PlumbingGas, Water/Sanitary
11 projects · most recent 01/22/2026
General Wiring
FiledStatusContractorScope
01/22/2026CompleteCharan Electrical Enterp's—
05/20/2025Permit IssuedRMD ElectricGeneral Wiring
01/19/2024CompleteGemini Electric Co—
09/28/2023CompleteUrban ElectricalGeneral Wiring
10/11/2022Permit IssuedLiu ElectricGeneral Wiring
04/26/2022CompleteCharan Electrical Enterp's—
10/14/2021CompleteKLK ElectricGeneral Wiring
07/16/2021CompleteAbm Electric—
06/03/2019Permit IssuedCharan Electrical Enterp'sGeneral Wiring
05/14/2018CompleteCharan Electrical Enterp's—
02/08/2018CompleteCharan Electrical Enterp'sGeneral Wiring
2 projects · most recent 12/15/2025
Masonry Concrete
FiledStatusContractorScope
12/15/2025Signed-offNavillus TileMasonry
08/07/2024Permit IssuedUrban EcospacesConcrete
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/21/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
12/17/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/17/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/17/2025Mastic and Intumescent Fire-resistant CoatingsGEORGE GHEBRYALspecial
12/17/2025Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
12/17/2025Structural Steel - DetailsGEORGE GHEBRYALspecial
12/17/2025MasonryGEORGE GHEBRYALspecial
12/17/2025FinalGEORGE GHEBRYALprogress
12/12/2025Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
12/12/2025FinalGEORGE GHEBRYALprogress
12/12/2025MasonryGEORGE GHEBRYALspecial
12/12/2025Mastic and Intumescent Fire-resistant CoatingsGEORGE GHEBRYALspecial
12/12/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/12/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/12/2025Structural Steel - DetailsGEORGE GHEBRYALspecial
12/03/2025Sprinkler Systems—special
05/16/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
12/04/2024FinalGEORGE GHEBRYALprogress
12/04/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/04/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/04/2024Mechanical SystemsGEORGE GHEBRYALspecial
11/26/2024Fire-Resistant Penetrations and Joints—special
11/26/2024FinalGEORGE GHEBRYALprogress
11/26/2024Mechanical SystemsGEORGE GHEBRYALspecial
08/16/2024FinalGEORGE GHEBRYALprogress
07/22/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
Latest 25 of 70.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 095 EastwoodEducationCellar, Floors 1–4
Project Q01327801 Alteration · Approved · 12/10/2025
Project Q01077840 Alteration · LOC Issued · 07/17/2024
Project Q01004766 Alteration · Permit Entire · 02/21/2024
Project Q00943688 Alteration · Objections · 10/05/2023
Project Q00817599 Alteration · Permit Entire · 02/09/2023
Project Q00823318 Alteration · Permit Entire · 02/08/2023
Project Q00815319 Alteration · LOC Issued · 02/07/2023
Project Q00784071 Alteration · Permit Entire · 08/12/2022
Project Q00772534 Alteration · Permit Entire · 07/28/2022
Project Q00584751 Alteration · Permit Entire · 08/30/2021
P.S. 95 QueensEducation—
Project Q00901739 Alteration · LOC Issued · 07/11/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 363 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch51
08/26/2026Q00584751-I1Request digital key ↗
08/26/2026Q00584751-S1Request digital key ↗
08/26/2026Q00584751-P1Request digital key ↗
Showing 3 of 51 on file for this type
▸Seals & Professional Certifications103
▸DOB NOWDPL-1: Design Professional Seal & Signature51
08/25/2026Q00815319-I1Open ↗
08/25/2026Q00815319-P1Open ↗
08/25/2026Q00817599-S2Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/25/2026Q00817599-S1Open ↗
09/25/2026Q00817599-S1Open ↗
09/24/2026Q00823318-S1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/25/2026Q00817599-S1Open ↗
09/24/2026Q00823318-S1Open ↗
09/23/2026Q00823318-P2Open ↗
Showing 3 of 19 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWNYCSCA - Approved Site Safety Plans2
08/13/2026Q00901739-I1Open ↗
08/13/2026Q01077840-I1Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/25/2026Q00815319-I1Open ↗
08/25/2026Q00815319-P1Open ↗
08/23/2026Q00772534-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/25/2026Q00817599-S1Open ↗
08/25/2026Q00817599-S2Open ↗
08/14/2026Q00817599-I1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs113
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter51
08/24/2026Q00943688-S1Open ↗
08/24/2026Q00943688-S2Open ↗
08/24/2026Q00943688-I1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)51
08/24/2026Q00943688-S1Open ↗
08/23/2026Q00772534-S2Open ↗
08/23/2026Q00772534-P2Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDEP Variance (V5) letter7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/25/2026Q00815319-I1Open ↗
Showing 1 of 4 on file for this type
▸Filing & Intake Forms7
▸DOB NOWAI1 Form7
08/13/2026Q00817599-I1Open ↗
08/13/2026Q00815319-P1Open ↗
08/13/2026Q01004766-S2Open ↗
Showing 3 of 7 on file for this type
▸Other Documents66
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal51
08/24/2026Q00943688-S1Open ↗
08/23/2026Q00772534-P1Open ↗
08/23/2026Q00772534-S2Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWProof of Historic Building12
08/21/2026Q00823318-P1Open ↗
08/14/2026Q00823318-I1Open ↗
08/13/2026Q00784071-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/25/2026Q00815319-I1Open ↗
08/13/2026Q01077840-I1Open ↗
08/13/2026Q00901739-I1Open ↗