← Back
Two stories - detached, small or mid-size
179-29 KILDARE ROAD
QUEENS · BIN 4155658
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R1-2Zoning
1,518 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,037 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar2p · 2 filings · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/23/2024$1.2M—— → —$781/sf building
04/17/2015$883K—— → —$582/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIKE TECH ASSOCIATES LLC609/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREGORY PAPANTONIOUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965309/13/2021
Building Lifecycle
All (33)Filed (5)Violation (1)Special Inspection (27)
09/13/2021
Filed — Alteration
AIR COMRESSORS AT OSP; BLOWERS FOR EACH FLOOR
Q00447755-I1
09/13/2021
Special inspection requirement — Ventilation and air distribution system
SYED RIZVI
05/10/2021
Filed — Alteration
APPLICATION FILED HEREWITH FOR NEW PLUMBING WORK THRU OUT CELLAR,001,002.
Q00447734-I1
05/06/2021
Filed — Alteration
Q00448739-I1
05/06/2021
Filed — Alteration
Q00454157-I1
05/06/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
SYED RIZVI
05/06/2021
Special inspection requirement — HVAC-R and service water heating system controls
SYED RIZVI
05/06/2021
Special inspection requirement — HVAC-R and service water heating equipment
SYED RIZVI
03/30/2021
Filed — Alteration CO
APPLICATION FILED HEREWITH FOR GENERAL CONSTRUCTION, ALTERATION TO EXISTING 1 FAMILY DWELLING. ENLARGE BEHIND GARAGE AND BELOW & ABOVE GARAGE. RELOCATE KITCHEN AND RELOCATE BATHROOMS
Q00489040-I1
03/24/2021
Special inspection requirement — Subgrade Inspections
SYED RIZVI
03/24/2021
Special inspection requirement — Concrete - Cast-In-Place
SYED RIZVI
03/24/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SYED RIZVI
03/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
03/24/2021
Special inspection requirement — Masonry
SYED RIZVI
03/24/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SYED RIZVI
03/24/2021
Special inspection requirement — Structural Steel - Details
SYED RIZVI
03/24/2021
Special inspection requirement — Structural Steel - High Strength Bolting
SYED RIZVI
03/18/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
SYED RIZVI
03/18/2021
Special inspection requirement — Lighting controls
SYED RIZVI
03/18/2021
Special inspection requirement — Interior lighting power
SYED RIZVI
03/18/2021
Special inspection requirement — Final
HAYM GROSS
03/18/2021
Special inspection requirement — Footing and Foundation
SYED RIZVI
03/18/2021
Special inspection requirement — Fenestration areas
SYED RIZVI
03/18/2021
Special inspection requirement — Insulation placement and R values
SYED RIZVI
03/18/2021
Special inspection requirement — Fenestration air leakage
SYED RIZVI
03/18/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/18/2021
Special inspection requirement — Air barrier - visual inspection
SYED RIZVI
01/05/2021
Special inspection requirement — Final
HAYM GROSS
01/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
01/05/2021
Special inspection requirement — Energy Code Compliance Inspections
SYED RIZVI
01/05/2021
Special inspection requirement — Mechanical Systems
SYED RIZVI
01/05/2021
Special inspection requirement — Energy Code Compliance
SYED RIZVI
10/17/2002
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 09/13/2021
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/13/2021——Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric 4MXS36RMVJUA 84,000 BTU · Heat Pump Outdoor ×7
Ventilation
1 project · most recent 05/10/2021
Gas Water/Sanitary
FiledStatusContractorScope
05/10/2021——Gas, Water/Sanitary
1 project
Fence
FiledStatusContractorScope
———Fence
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
09/13/2021Ventilation and air distribution systemSYED RIZVIenergy_progress
05/06/2021HVAC-R and service water piping design and insulationSYED RIZVIenergy_progress
05/06/2021HVAC-R and service water heating system controlsSYED RIZVIenergy_progress
05/06/2021HVAC-R and service water heating equipmentSYED RIZVIenergy_progress
03/24/2021Subgrade InspectionsSYED RIZVIspecial
03/24/2021Concrete - Cast-In-PlaceSYED RIZVIspecial
03/24/2021Excavations - Sheeting, Shoring, and BracingSYED RIZVIspecial
03/24/2021Fire-Resistant Penetrations and JointsSYED RIZVIspecial
03/24/2021MasonrySYED RIZVIspecial
03/24/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSYED RIZVIspecial
03/24/2021Structural Steel - DetailsSYED RIZVIspecial
03/24/2021Structural Steel - High Strength BoltingSYED RIZVIspecial
03/18/2021Fenestration and door U-factor and product ratingsSYED RIZVIenergy_progress
03/18/2021Lighting controlsSYED RIZVIenergy_progress
03/18/2021Interior lighting powerSYED RIZVIenergy_progress
03/18/2021FinalHAYM GROSSprogress
03/18/2021Footing and FoundationSYED RIZVIprogress
03/18/2021Fenestration areasSYED RIZVIenergy_progress
03/18/2021Insulation placement and R valuesSYED RIZVIenergy_progress
03/18/2021Fenestration air leakageSYED RIZVIenergy_progress
03/18/2021Structural Stability – Alterations of existing buildings—special
03/18/2021Air barrier - visual inspectionSYED RIZVIenergy_progress
01/05/2021FinalHAYM GROSSprogress
01/05/2021Fire-Resistant Penetrations and JointsSYED RIZVIspecial
01/05/2021Energy Code Compliance InspectionsSYED RIZVIprogress
Latest 25 of 27.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00447755-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/27/2026Q00448739-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00447734-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00454157-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/27/2026Q00489040-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
08/01/2022440684396Open ↗
08/01/2022440610377Open ↗
08/07/2021440684396Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/27/2026Q00489040-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/27/2026Q00489040-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00489040-I1Open ↗
08/27/2026Q00448739-I1Open ↗
08/27/2026Q00447734-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/07/2021440684396Open ↗
12/30/2020440610377Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/07/2021440684396Open ↗
12/30/2020440610377Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/27/2026Q00489040-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00489040-I1Open ↗
08/27/2026Q00447734-I1Open ↗
08/27/2026Q00447755-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/30/2020440610377Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
01/13/2021440610377Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
08/07/2021440684396Open ↗
12/18/2020440610377Open ↗
▸Other Documents4
▸BISSUSTAINABLE ROOF ZONE FORM1
12/30/2020440610377Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/15/2021440610377Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/27/2026Q00489040-I1Open ↗
▸DOB NOWPlot Diagram1
08/27/2026Q00489040-I1Open ↗