179-55 80 ROAD
QUEENS · BIN 4155500
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R1-2Zoning
2,150 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: 17955 80TH RD LLC · 4,510 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 212p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
1 job · most recent 05/28/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/28/2025Signed-offFOUR POINTS P & H CORPGas, Storm, Water/Sanitary
1 job · most recent 05/21/2025
General Wiring
FiledStatusContractorScope
05/21/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
Building Lifecycle
All (68)Filed (9)Permit Issued (6)Signed Off (3)Inspection (6)Objection (14)Special Inspection (30)
06/20/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
06/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
06/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
06/20/2025
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
06/20/2025
Special inspection requirement — Air barrier continuity plan testing
Younes Abouyaala
06/20/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
06/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
06/20/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
06/20/2025
Special inspection requirement — Lighting controls
Younes Abouyaala
06/20/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
06/20/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
06/20/2025
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
06/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
06/20/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
06/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/20/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
06/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/20/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
06/20/2025
Special inspection requirement — Exterior lighting power
Younes Abouyaala
06/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
06/20/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
06/20/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
06/20/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Younes Abouyaala
06/20/2025
Special inspection requirement — Air barrier — testing
Younes Abouyaala
06/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
05/28/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK FILED SUBSEQUENTLY, AND TO OBTAIN A NEW C OF O
Q00847530-P6
05/28/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
05/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/28/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
05/28/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
02/20/2025
Signed off — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK FILED SUBSEQUENTLY, AND TO OBTAIN A NEW C OF O
Q00847530-S2
01/08/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK FILED SUBSEQUENTLY, AND TO OBTAIN A NEW C OF O
Q00847530-P5
01/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/05/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/19/2024
Signed off — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK FILED SUBSEQUENTLY, AND TO OBTAIN A NEW C OF O
Q00847530-S1
05/21/2024
Permit issued — General Construction
Q00847530-I1-GC
05/20/2024
Signed off — Alteration
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE
Q00847115-I1
05/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/25/2024
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK FILED SUBSEQUENTLY, AND TO OBTAIN A NEW C OF O
Q00847530-P4
04/25/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/19/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
04/04/2024
Objection resolved — Addressed
04/01/2024
Objection raised — Other
03/27/2024
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK FILED SUBSEQUENTLY, AND TO OBTAIN A NEW C OF O
Q00847530-P2
03/21/2024
Objection resolved — Addressed
03/20/2024
Objection raised — Scope
03/07/2024
Objection raised — Scope
03/07/2024
Objection resolved — Addressed
02/20/2024
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK FILED SUBSEQUENTLY, AND TO OBTAIN A NEW C OF O
Q00847530-P1
10/03/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/11/2023
Permit issued — Plumbing
Q00847530-S2-PL
06/09/2023
Permit issued — General Construction
Q00847530-I1-GC
06/09/2023
Permit issued — Structural
Q00847530-S1-GC-CX
05/31/2023
Permit issued — Construction Fence
Q00847115-I1-FN
05/30/2023
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK FILED SUBSEQUENTLY, AND TO OBTAIN A NEW C OF O
Q00847530-S2
05/30/2023
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK FILED SUBSEQUENTLY, AND TO OBTAIN A NEW C OF O
Q00847530-S1
05/06/2023
Permit issued — Construction Fence
Q00847115-I1-FN
04/18/2023
Objection raised — Scope
04/18/2023
Objection resolved — Addressed
Latest 60 of 68 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/16/2025$1.9M—17955 80TH ROAD LLC → 179-55 LLC$884/sf building
05/02/2023$1000K—Private party → 17955 80TH RD LLC$465/sf building
10/07/2022$999K—Private party → Private party$465/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA BLDG & INSP SVC LLC905/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DMCONSULTING68601603/21/2026
Mdl consulting services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SB RENOVATION & MODELINGGeneral Contractor507/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
JOHN EVAN CONTRACTING CORGeneral Contractor107/08/2026
FOUR POINTS P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519805/28/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSB RENOVATION & MODELING05/21/2024
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP09/11/2023
DOB NOWGeneral ConstructionPermit IssuedSB RENOVATION & MODELING06/09/2023
DOB NOWStructuralSigned-offSB RENOVATION & MODELING06/09/2023
DOB NOWConstruction FenceSigned-offSB RENOVATION & MODELING05/31/2023
DOB NOWConstruction FenceSigned-offJOHN EVAN CONTRACTING COR05/06/2023
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/05/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/19/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
10/03/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
06/20/2025Air barrier continuity plan testingYounes Abouyaalaenergy_progress
06/20/2025Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
06/20/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
06/20/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
06/20/2025Fenestration areasYounes Abouyaalaenergy_progress
06/20/2025Air barrier — testing Younes Abouyaalaenergy_progress
06/20/2025Permanent certificateYounes Abouyaalaenergy_progress
06/20/2025Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
06/20/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
06/20/2025Fenestration air leakageYounes Abouyaalaenergy_progress
06/20/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
06/20/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
06/20/2025Lighting controlsYounes Abouyaalaenergy_progress
06/20/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
06/20/2025Exterior lighting powerYounes Abouyaalaenergy_progress
06/20/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
06/20/2025Interior lighting powerYounes Abouyaalaenergy_progress
06/20/2025Maintenance informationYounes Abouyaalaenergy_progress
06/20/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/20/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
06/20/2025Construction Operations Influencing Adjacent StructuresYounes Abouyaalaspecial
06/20/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/20/2025Wall Panels, Curtain Walls, and VeneersYounes Abouyaalaspecial
06/20/2025Subgrade InspectionsYounes Abouyaalaspecial
06/20/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
Latest 25 of 88.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026Q00847530-P6Request digital key ↗
08/21/2026Q00847530-P5Request digital key ↗
08/21/2026Q00847530-P4Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00847530-P6Open ↗
08/13/2026Q00847530-P5Open ↗
08/13/2026Q00847530-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00847530-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature10
09/26/2026Q00847530-P1Open ↗
09/26/2026Q00847530-P1Open ↗
09/01/2026Q00847530-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026Q00847115-I1Open ↗
08/21/2026Q00847530-P6Open ↗
08/21/2026Q00847530-P5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/26/2026Q00847530-P1Open ↗
09/01/2026Q00847530-S1Open ↗
09/01/2026Q00847530-S1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00847530-P6Open ↗
08/13/2026Q00847530-S1Open ↗
08/13/2026Q00847530-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026Q00847530-S2Open ↗
08/21/2026Q00847530-P6Open ↗
08/21/2026Q00847530-P5Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00847530-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00847530-S1Open ↗
▸Other Documents20
▸DOB NOWSite Survey: Initial5
08/13/2026Q00847530-P5Open ↗
08/13/2026Q00847530-P6Open ↗
08/13/2026Q00847530-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q00847530-P6Open ↗
08/13/2026Q00847530-P1Open ↗
08/13/2026Q00847530-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/13/2026Q00847530-P6Open ↗
08/13/2026Q00847530-S1Open ↗
08/13/2026Q00847530-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026Q00847530-I1Open ↗
08/21/2026Q00847530-P6Open ↗
08/21/2026Q00847530-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00847530-I1Open ↗