← Back
BuildNYC
One family attached or semi-detached
179-57 ANDERSON ROAD
QUEENS · St. Albans · BIN 4269592
💬 Discuss this project
1935Year Built
2Stories
A5Building Class
R4BZoning
1,600 sfGross Floor Area
1Units
One family attached or semi-detached · 2,000 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation1p · 2 filings · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Building Associates109/26/2024
Tom Petersen Architect105/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R Solar Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Harvest Powerspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244109/26/2024
Thomas Petersen Architect7854105/06/2024
Building Lifecycle
04/04/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01080119-I1
11/15/2024
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
Q01046307-I1-SL
10/31/2024
Permit issued — Solar
Q01080119-I1-SL
09/26/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01080119-I1
07/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
11 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offHarvest Power10/31/2024
DOB NOWSolarPermit IssuedTom Petersen Architect05/08/2024
2 projects · most recent 09/25/2024
FiledStatusContractorScope
09/25/2024CompleteCmac Electric—
05/03/2024CancelledVenture Home Solar—
1 project · most recent 05/06/2024
FiledStatusContractorScope
05/06/2024Permit IssuedTom Petersen Architect—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/12/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
07/12/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
07/12/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
07/12/2024FinalNARESH MAHANGUprogress
07/12/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
10 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account