Primarily 1 family with 1 store or office
179 ATLANTIC AVENUE
BROOKLYN · BIN 3002772
💬 Discuss this project
1920Year Built
2Stories
S1Building Class
R6Zoning
1,830 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · 2,125 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Floor 21p · 1 filing · 19 docs
Floor 1Under Construction6p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ ENGINEERING, P.C110/28/2025
URBAN ENGINEERING, PC403/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
URBAN ENGINEERING, PC803/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WERNER ZLOKLIKOVITSGeneral Contractor507/08/2026
3 J'S RESTORATION INCGeneral Contractor207/30/2026
ARSENAL SCAFFOLD INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
URBAN ENGINEERING, PC2575303/14/2025
Building Lifecycle
All (35)Filed (5)Permit Issued (6)Signed Off (2)Violation (7)Inspection (2)Special Inspection (13)
07/29/2026
Permit issued — General Construction
B01108389-I1-GC-CX
02/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/28/2025
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01303051-I1
10/28/2025
Permit issued — Sidewalk Shed
B01303051-I1-SH
07/03/2025
Permit issued — General Construction
B01108389-I1-GC-CX
03/26/2025
Permit issued — Structural
B01108389-I1-GC-CX
03/14/2025
Filed — Alteration
EXISTING BUILDING BRICK WALL REHABILITATION WORK INCLUDING TEMPORARY SHORING, PARTIAL DEMOLITION, AND RETROFIT WORK.
B01108389-I1
08/29/2024
Signed off — Alteration
EXISTING BUILDING WOOD FRAME WALL RETROFIT WORK INCLUDING TEMPORARY SHORING AND WOOD FRAMING, TO COMPLY WITH EMERGENCY WORK ORDER OF TEMPORARY SHORING AS A RESULT OF FAULTY DEMOLITION WORK ON THE ADJACENT SIDE, 181 ATLANTIC AVENUE.
B00977040-I1
08/29/2024
Signed off — Alteration
EXISTING BUILDING WOOD FRAME WALL RETROFIT WORK INCLUDING TEMPORARY SHORING AND WOOD FRAMING, TO COMPLY WITH EMERGENCY WORK ORDER OF TEMPORARY SHORING AS A RESULT OF FAULTY DEMOLITION WORK ON THE ADJACENT SIDE, 181 ATLANTIC AVENUE.
B00977040-S1
04/16/2024
Permit issued — Foundation
B00977040-S1-FO-EA
04/11/2024
Filed — Alteration
EXISTING BUILDING WOOD FRAME WALL RETROFIT WORK INCLUDING TEMPORARY SHORING AND WOOD FRAMING, TO COMPLY WITH EMERGENCY WORK ORDER OF TEMPORARY SHORING AS A RESULT OF FAULTY DEMOLITION WORK ON THE ADJACENT SIDE, 181 ATLANTIC AVENUE.
B00977040-S1
04/11/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Nizar Khoury
04/11/2024
Special inspection requirement — Masonry
Nizar Khoury
04/10/2024
Special inspection requirement — Final
Nizar Khoury
04/10/2024
Special inspection requirement — Concrete - Cast-In-Place
Nizar Khoury
04/10/2024
Special inspection requirement — Footing and Foundation
Nizar Khoury
02/23/2024
Permit issued — Structural
B00977040-I1-GC-CX
02/13/2024
Special inspection requirement — Post-installed Anchors
Nizar Khoury
02/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nizar Khoury
02/13/2024
Special inspection requirement — Structural Wood Frame
Nizar Khoury
02/13/2024
Special inspection requirement — Final
Nizar Khoury
02/12/2024
Filed — Alteration
EXISTING BUILDING WOOD FRAME WALL RETROFIT WORK INCLUDING TEMPORARY SHORING AND WOOD FRAMING, TO COMPLY WITH EMERGENCY WORK ORDER OF TEMPORARY SHORING AS A RESULT OF FAULTY DEMOLITION WORK ON THE ADJACENT SIDE, 181 ATLANTIC AVENUE.
B00977040-P1
02/12/2024
Special inspection requirement — Structural Wood Frame
02/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/12/2024
Special inspection requirement — Post-installed Anchors
02/12/2024
Special inspection requirement — Final
01/29/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/20/2023
Filed — Alteration
EXISTING BUILDING WOOD FRAME WALL RETROFIT WORK INCLUDING TEMPORARY SHORING AND WOOD FRAMING, TO COMPLY WITH EMERGENCY WORK ORDER OF TEMPORARY SHORING AS A RESULT OF FAULTY DEMOLITION WORK ON THE ADJACENT SIDE, 181 ATLANTIC AVENUE.
B00977040-I1
06/19/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/19/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit Issued3 J'S RESTORATION INC07/29/2026
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC10/28/2025
DOB NOWGeneral ConstructionPermit Issued3 JS RESTORATION07/03/2025
DOB NOWStructuralPermit IssuedWERNER ZLOKLIKOVITS03/26/2025
DOB NOWFoundationSigned-offWERNER ZLOKLIKOVITS04/16/2024
DOB NOWStructuralSigned-offWERNER ZLOKLIKOVITS02/23/2024
BISEQISSUEDINTERIOR ALTERATIONS INC.04/07/1997
BISOTISSUEDINTERIOR ALTERATIONS INC.04/07/1997
1 project · most recent 10/14/2025
FiledStatusContractorScope
10/14/2025Permit IssuedNASH ELECTRIC SERVICES IN—
1 project · most recent 03/14/2025
Steel Masonry
FiledStatusContractorScope
03/14/2025Permit Issued3 J'S RESTORATION INCSteel, Masonry
1 project · most recent 10/28/2025
Sidewalk Shed
FiledStatusContractorScope
10/28/2025Permit IssuedARSENAL SCAFFOLD INCSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/11/2024Excavations - Sheeting, Shoring, and BracingNizar Khouryspecial
04/11/2024MasonryNizar Khouryspecial
04/10/2024FinalNizar Khouryprogress
04/10/2024Concrete - Cast-In-PlaceNizar Khouryspecial
04/10/2024Footing and FoundationNizar Khouryprogress
02/13/2024Post-installed AnchorsNizar Khouryspecial
02/13/2024Structural Stability – Alterations of existing buildingsNizar Khouryspecial
02/13/2024Structural Wood FrameNizar Khouryprogress
02/13/2024FinalNizar Khouryprogress
02/12/2024Structural Wood Frame—progress
02/12/2024Structural Stability – Alterations of existing buildings—special
02/12/2024Post-installed Anchors—special
02/12/2024Final—progress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026B00977040-S1Request digital key ↗
08/26/2026B00977040-I1Request digital key ↗
08/26/2026B00977040-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/26/2026B00977040-S1Open ↗
08/26/2026B00977040-P1Open ↗
08/22/2026B01108389-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00977040-I1Open ↗
08/29/2026B00977040-S1Open ↗
08/29/2026B00977040-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00977040-P1Open ↗
08/26/2026B00977040-S1Open ↗
08/26/2026B00977040-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00977040-I1Open ↗
08/29/2026B00977040-S1Open ↗
08/29/2026B00977040-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026B00977040-S1Open ↗
08/26/2026B00977040-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWLandmark Approval1
08/13/2026B01108389-P1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/26/2026B00977040-S1Open ↗