Two family converted from one family
179 EAST 80 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1047519
💬 Discuss this project
1899Year Built
4Stories
B3Building Class
R8BZoning
4,600 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: FOUR OAKS HOLDINGS, LLC · 1,667 sf lot · 2.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof21p · 2 filings · 20 docs
Penthouse30p · 4 filings · 20 docs
Floor 331p · 4 filings · 20 docs
Floor 231p · 4 filings · 20 docs
Floor 131p · 4 filings · 20 docs
Cellar36p · 4 filings · 20 docs
Sub-Basement30p · 4 filings · 20 docs
Site & exterior2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REBER203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/12/2021$7.0M—Private party → FOUR OAKS HOLDINGS, LLC$1,522/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARPAD BAKSA ARCHITECT, P.C.603/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREGG NY PLUMBING, INCPlumbing307/08/2026
AIR DEPOT COMM. REFR. CORGeneral Contractor203/21/2026
CS BRIDGE CORPGeneral Contractor203/21/2026
MEG II DESIGN LLCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8431105/11/2026
Building Lifecycle
All (62)Filed (12)Permit Issued (7)Signed Off (5)Inspection (4)Objection (4)Special Inspection (30)
07/07/2026
Signed off — Alteration
PLUMBING WORK THROUGHOUT CELLAR, BASEMENT, 001-004 FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00592886-I1
05/11/2026
Filed — Alteration
PLUMBING WORK THROUGHOUT CELLAR, BASEMENT, 001-004 FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00592886-P4
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
04/30/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
04/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
04/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
04/14/2026
Signed off — Alteration
MECHANICAL WORK THROUGHOUT CELLAR, BASEMENT, 001-004 FLOORS AND ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00592854-I1
01/06/2026
Signed off — Alteration
STRUCTURAL FRAMING WORK IN CELLAR, BASEMENT, 1ST - 3RD FLOORS AND PENTHOUSE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00592569-I1
12/15/2025
Filed — Alteration
PLUMBING WORK THROUGHOUT CELLAR, BASEMENT, 001-004 FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00592886-P3
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
12/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
12/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
06/13/2025
Objection resolved — Addressed
05/29/2025
Objection resolved — Addressed
05/23/2025
Permit issued — Plumbing
M00592886-I1-PL
10/03/2024
Objection raised — Scope
10/03/2024
Objection raised — Scope
09/25/2024
Filed — Alteration
PLUMBING WORK THROUGHOUT CELLAR, BASEMENT, 001-004 FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00592886-P2
07/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
07/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
07/12/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
07/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
07/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/05/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/07/2024
Filed — Alteration
PLUMBING WORK THROUGHOUT CELLAR, BASEMENT, 001-004 FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00592886-P1
03/04/2024
Filed — Alteration
MECHANICAL WORK THROUGHOUT CELLAR, BASEMENT, 001-004 FLOORS AND ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00592854-P2
03/04/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
03/04/2024
Special inspection requirement — Final
JOHN MCMONAGLE
03/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
03/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
03/04/2024
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
03/04/2024
Special inspection requirement — Duct leakage testing, insulation and design
JOHN MCMONAGLE
03/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
03/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
12/07/2023
Signed off — Alteration
INTERIOR RENOVATION WORK THROUGHOUT CELLAR, BASEMENT, 001-004 FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00547653-I1
12/05/2023
Permit issued — Plumbing
M00592886-I1-PL
07/14/2023
Special inspection requirement — Structural Steel - Welding
JOHN MCMONAGLE
07/14/2023
Special inspection requirement — Masonry
JOHN MCMONAGLE
07/14/2023
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
07/14/2023
Special inspection requirement — Structural Cold-Formed Steel
JOHN MCMONAGLE
07/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN MCMONAGLE
07/14/2023
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
07/14/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JOHN MCMONAGLE
07/13/2023
Filed — Alteration
STRUCTURAL FRAMING WORK IN CELLAR, BASEMENT, 1ST - 3RD FLOORS AND PENTHOUSE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00592569-P1
10/27/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/05/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/07/2022
Signed off — Alteration
M00710902-I1
05/12/2022
Filed — Alteration
MECHANICAL WORK THROUGHOUT CELLAR, BASEMENT, 001-004 FLOORS AND ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00592854-P1
04/04/2022
Filed — Alteration
M00710902-I1
04/04/2022
Permit issued — Supported Scaffold
M00710902-I1-SF
04/04/2022
Permit issued — Mechanical Systems
M00592854-I1-MS
04/01/2022
Permit issued — Plumbing
M00592886-I1-PL
04/01/2022
Permit issued — Structural
M00592569-I1-ST
03/23/2022
Permit issued — General Construction
M00547653-I1-GC
10/03/2021
Filed — Alteration
PLUMBING WORK THROUGHOUT CELLAR, BASEMENT, 001-004 FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00592886-I1
10/03/2021
Filed — Alteration
MECHANICAL WORK THROUGHOUT CELLAR, BASEMENT, 001-004 FLOORS AND ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00592854-I1
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC05/23/2025
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC12/05/2023
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP04/04/2022
DOB NOWMechanical SystemsSigned-offAIR DEPOT COMM REFR COR04/04/2022
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC04/01/2022
DOB NOWStructuralSigned-offMEG II DESIGN LLC04/01/2022
DOB NOWGeneral ConstructionSigned-offMEG II DESIGN LLC03/23/2022
BISPLISSUEDZ.W. PLBG & HTG CORP06/10/2005
BISOTISSUEDMZZ CONSTR. CORP04/21/2005
BIS—ISSUEDMZZ CONSTRUCTION04/20/2005
BISMHISSUEDMZZ CONSTR. CORP04/20/2005
BIS—ISSUEDMZZ CONSTRUCTION06/14/2004
BISOTISSUEDMZZ CONSTR. CORP04/14/2004
BISOTISSUEDMZZ CONSTRUCTION CORP03/20/2004
BISMHISSUEDMZZ CONSTR. CORP03/08/2004
BISOTISSUEDMZZ CONSTR. CORP12/24/2003
BISPLRE-ISSUEDRICHARD LYNNES PLG & HTG CORP07/17/1997
BISMHISSUEDMASSARET LTD07/16/1997
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/05/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
10/27/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
04/30/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
04/30/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
04/30/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/30/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
04/30/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
12/15/2025HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
12/15/2025HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
12/15/2025HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
12/15/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/15/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
07/12/2024HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
07/12/2024HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
07/12/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/12/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
07/12/2024HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
03/04/2024Mechanical SystemsJOHN MCMONAGLEspecial
03/04/2024FinalJOHN MCMONAGLEprogress
03/04/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
03/04/2024HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
03/04/2024HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
03/04/2024HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
03/04/2024Duct leakage testing, insulation and designJOHN MCMONAGLEenergy_progress
03/04/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/14/2023FinalJosh Greggprogress
07/14/2023Structural Steel - DetailsJOHN MCMONAGLEspecial
Latest 25 of 63.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/03/2026M00547653-I1Request digital key ↗
09/02/2026M00710902-I1Request digital key ↗
09/02/2026M00592854-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature17
09/29/2026M00592886-P4Open ↗
09/01/2026M00592886-P4Open ↗
09/01/2026M00547653-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026M00710902-I1Open ↗
09/02/2026M00592854-P2Open ↗
09/02/2026M00592854-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M00592886-P4Open ↗
09/01/2026M00592854-P2Open ↗
08/28/2026M00592569-P1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/02/2026M00592854-P1Open ↗
09/02/2026M00592854-P2Open ↗
09/02/2026M00592854-I1Open ↗
Showing 3 of 11 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/02/2026M00592854-I1Open ↗
08/17/2026M00592886-I1Open ↗