← Back
Elevator apt, fireproof without stores
Gowanus (NYCHA)
179 HOYT STREET · Carroll Gardens-Cobble Hill-Gowanus-Red Hook · BIN 3323297
💬 Discuss this project
1960Year Built
6Stories
D3Building Class
R6Zoning
448,000 sfGross Floor Area
392Units
LL97 Covered7 Open Violations 3 unresolved · 4 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 228,118 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar
Site & exteriorUnder Construction2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3209/24/2026
NYCHA A CM CAPITAL PROGRAMS603/21/2026
NEW YORK CITY HOUSING AUTHORITY303/21/2026
OFFICE OF EXECUTIVE VP CAPITAL P203/21/2026
NYC Housing Authority203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RKTB ARCHITECTS, P.C.206/16/2026
LAKHANI & JORDAN208/13/2025
JOEL PHAGOO P.E. PLLC206/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES LLC303/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
TAREK M ZEID P E303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & N CONSTRUCTION GROUPGeneral Contractor908/14/2026
ALVARADO, JUANElectrical203/21/2026
HALPERN, SElectrical203/21/2026
MEGA TECHNICO, JV INCGeneral Contractor209/24/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUDSON PEAKS CONSULTING L8381308/13/2025
Building Lifecycle
All (57)Filed (7)Permit Issued (9)Signed Off (1)Facade (FISP) (12)Violation (22)Objection (2)Special Inspection (4)
09/23/2026
Permit issued — Mechanical Systems
B01229548-S3-MS
09/22/2026
Permit issued — General Construction
B01229548-I1-GC
08/13/2026
Permit issued — Sidewalk Shed
B01244399-I1-SH
06/22/2026
Permit issued — Construction Fence
B01244495-I1-FN
06/22/2026
Permit issued — Sidewalk Shed
B01244399-I1-SH
06/16/2026
Filed — Alteration
NYCHA/Gowanus/B6- (195 Hoyt /413 Baltic) Repl. apt. toilet exh. grilles w/new grilles w/OBDs. Install recirc. kitch. hoods. Repl. radiator valves, vents &traps w/self-cont. therms. valves, iso valves &traps. Clean &leak test dctwrk. Balance heat&exhaust
B01229548-P1
05/14/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01143776-I1
05/12/2026
Permit issued — Suspended Scaffold
B01143776-I1-SC
08/25/2025
Objection resolved — Addressed
08/22/2025
Objection raised — Admin
08/13/2025
Filed — Alteration
NYCHA/Gowanus/B6- (195 Hoyt /413 Baltic) Repl. apt. toilet exh. grilles w/new grilles w/OBDs. Install recirc. kitch. hoods. Repl. radiator valves, vents &traps w/self-cont. therms. valves, iso valves &traps. Clean &leak test dctwrk. Balance heat&exhaust
B01229548-S2
08/12/2025
Filed — Alteration
NYCHA/Gowanus/B6- (195 Hoyt /413 Baltic) Repl. apt. toilet exh. grilles w/new grilles w/OBDs. Install recirc. kitch. hoods. Repl. radiator valves, vents &traps w/self-cont. therms. valves, iso valves &traps. Clean &leak test dctwrk. Balance heat&exhaust
B01229548-S3
08/08/2025
Special inspection requirement — Maintenance information
GIORGI KHARDZEISHVILI
08/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GIORGI KHARDZEISHVILI
08/07/2025
Filed — Alteration
NYCHA/Gowanus/B6- (195 Hoyt /413 Baltic) Repl. apt. toilet exh. grilles w/new grilles w/OBDs. Install recirc. kitch. hoods. Repl. radiator valves, vents &traps w/self-cont. therms. valves, iso valves &traps. Clean &leak test dctwrk. Balance heat&exhaust
B01229548-I1
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
GIORGI KHARDZEISHVILI
07/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
GIORGI KHARDZEISHVILI
06/24/2025
Permit issued — Construction Fence
B01244495-I1-FN
06/24/2025
Permit issued — Sidewalk Shed
B01244399-I1-SH
06/23/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01244495-I1
06/23/2025
Filed — Alteration
B01244399-I1
05/15/2025
Cycle 10 facade report submitted
05/15/2025
Cycle 10 facade report signed — UNSAFE
03/25/2025
Cycle 10 facade inspection completed
12/06/2024
Permit issued — Suspended Scaffold
B01143776-I1-SC
11/22/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01143776-I1
02/27/2024
Violation issued (FDNY_NOV, closed)
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/04/2020
Cycle 8 facade report signed — SAFE
02/12/2020
Cycle 8 facade inspection completed
02/08/2020
Violation issued (ECB, open)
Construction
01/29/2020
Cycle 8 facade report submitted
09/24/2019
Violation issued (ECB, closed)
Construction
08/12/2019
Violation issued (ECB, open)
Construction
06/27/2019
Cycle 8 facade report submitted
06/27/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/24/2019
Cycle 8 facade report signed — UNSAFE
06/17/2019
Cycle 8 facade inspection completed
05/24/2019
Violation issued (ECB, closed)
Construction
05/24/2019
Violation issued (ECB, closed)
Construction
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/07/2018
Violation issued (ECB, closed)
Local Law
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/19/2006
Violation issued (ECB, closed)
Local Law
02/15/2006
Cycle 6 facade report submitted
02/10/2006
Cycle 6 facade report signed — SWARMP
01/17/2006
Cycle 6 facade inspection completed
11/25/2005
Violation issued (ECB, closed)
Local Law
06/03/2005
Violation issued (ECB, closed)
Local Law
03/18/2005
Violation issued (ECB, closed)
Local Law
08/20/2004
Violation issued (ECB, closed)
Local Law
05/29/2003
Violation issued (ECB, closed)
Local Law
08/08/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/01/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMEGA TECHNICO, JV INC09/23/2026
DOB NOWGeneral ConstructionPermit IssuedMEGA TECHNICO, JV INC09/22/2026
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP08/13/2026
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP06/22/2026
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP06/22/2026
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM05/12/2026
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP06/24/2025
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP06/24/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM12/06/2024
BISPLISSUEDMAR-SAL PLBG & HTG, INC05/21/2020
BISOTISSUEDADAM'S EUROPEAN CONTRACTING01/02/2020
BISOTISSUEDADAM'S EUROPEAN CONTRACTING01/02/2020
BISEQISSUEDRAVEN CONSTRUCTION SERVIC09/11/2019
BISPLISSUEDMAR-SAL PLBG & HTG, INC05/14/2019
BISMHISSUEDMOLTEN MECHANIAL & METAL03/25/2019
BISOTISSUEDADAM'S EUROPEAN CONTRACTING12/27/2018
BISEQISSUEDRAVEN CONSTRUCTION SERVIC09/25/2018
BISEQISSUEDRAVEN CONSTRUCTION SERVIC07/26/2018
BISEQISSUEDADAM'S EUROPEAN CONTRACTING07/23/2018
BISPLISSUEDMAR-SAL PLBG & HTG, INC05/22/2018
BISMHISSUEDMOLTEN MECHANIAL & METAL05/04/2018
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/20/2018
BISOTISSUEDADAM'S EUROPEAN CONTRACTING03/20/2018
BISMHISSUEDMOLTEN MECHANIAL & METAL01/26/2018
BISOTISSUEDADAM'S EUROPEAN CONTRACTING11/29/2017
BISOTISSUEDADAM'S EUROPEAN CONTRACTING11/29/2017
BISEQISSUEDRAVEN CONSTRUCTION SERVIC10/04/2017
BISEQISSUEDRAVEN CONSTRUCTION SERVIC07/24/2017
BISEQISSUEDADAM'S EUROPEAN CONTRACTING07/17/2017
BISEQISSUEDZORIA HOUSING, LLC11/02/2016
BISEQISSUEDZORIA HOUSING, LLC10/31/2016
BISEQISSUEDD'ONOFRIO GENERAL CONTRACTORS11/03/2014
BISEQISSUEDMETRO. BRIDGE & SCAF. COR04/20/2010
BISEQISSUEDPARADISE CONSTRUCTION11/09/2004
BISSDISSUEDV. C. VITANZA SONS INC05/05/2004
BISEQISSUEDPARADISE CONSTRUCTION02/26/2004
BISOTISSUEDLEHRER MCGOVERN BOVIS08/02/1996
BISOTISSUEDLEHR MCGOVERN - BORIS08/02/1996
BISMHISSUEDLEHR MCGOVERN- BORIS08/02/1996
BISMHISSUEDLEHRER MCGOVERN BOVIS05/22/1995
+ 3 more permits on file
1 project · most recent 06/16/2026
Water/Sanitary
FiledStatusContractorScope
06/16/2026——Water/Sanitary
9 projects · most recent 05/30/2025
General Wiring
FiledStatusContractorScope
05/30/2025Permit IssuedAUJLA ELECTRIC CORP—
03/27/2025CompletePOLARIS ELEC'L CONST CORP—
03/24/2025CompletePOLARIS ELEC'L CONST CORP—
04/23/2021Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
04/23/2021Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
04/01/2020CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
12/17/2019CompleteTHORN ELECTRIC INC.General Wiring
05/01/2019CompleteTHORN ELECTRIC INC.General Wiring
05/09/2018CompleteKLK ELECTRIC, INC—
1 project · most recent 06/23/2025
Fence
FiledStatusContractorScope
06/23/2025Permit IssuedJ & N CONSTRUCTION GROUPFence
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/08/2025Maintenance informationGIORGI KHARDZEISHVILIenergy_progress
08/08/2025HVAC-R and service water piping design and insulationGIORGI KHARDZEISHVILIenergy_progress
08/04/2025Energy Code Compliance InspectionsGIORGI KHARDZEISHVILIprogress
07/07/2025Tenant Protection Plan ComplianceGIORGI KHARDZEISHVILIspecial
▾Documents — 211 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026B01143776-I1Request digital key ↗
08/21/2026B01244399-I1Request digital key ↗
08/21/2026B01244495-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION25
02/02/2024321304539Open ↗
02/02/2024321304539Open ↗
09/15/2023321304539Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION15
08/02/2019340525060Open ↗
03/26/2019321304539Open ↗
05/23/2018321304539Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
07/17/2017321304539Open ↗
05/06/2017321304539Open ↗
▸Seals & Professional Certifications40
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
12/13/2018340436969Open ↗
12/13/2018340437502Open ↗
10/04/2017340537510Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
08/23/2017340537510Open ↗
07/18/2017340525060Open ↗
07/13/2017340522795Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
08/23/2017340537510Open ↗
07/18/2017340525060Open ↗
07/13/2017340522795Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
08/23/2017340537510Open ↗
07/18/2017340525060Open ↗
07/13/2017340522795Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01244399-I1Open ↗
08/21/2026B01229548-P1Open ↗
08/21/2026B01229548-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01229548-S2Open ↗
09/01/2026B01229548-S2Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/20/2010320149479Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/20/2010320149479Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B01229548-S2Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING2
12/03/2021321304539Open ↗
06/10/2020321304539Open ↗
▸BISHEATING SYSTEMS1
01/09/2024321304539Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/09/2024321304539Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/09/2024321304539Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/29/2016321304539Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
10/27/2016340437502Open ↗
10/26/2016340436969Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/20/2010320149479Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/23/2017340537510Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU5515BK171
01/24/2024321304539Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/31/2023321304539Open ↗
07/24/2023321304539Open ↗
05/30/2023321304539Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/29/2016321304539Open ↗
01/29/2016321304539Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/09/2024321304539Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/09/2024321304539Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/15/2023321304539Open ↗
▸BISELECTRIC MOTORS1
01/09/2024321304539Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/09/2024321304539Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/26/2016340436969Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY12
05/30/2023321304539Open ↗
05/30/2023321304539Open ↗
05/30/2023321304539Open ↗
Showing 3 of 12 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
01/09/2024321304539Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/09/2024321304539Open ↗
▸BISMECHANICAL SYSTEMS1
01/09/2024321304539Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
01/09/2024321304539Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/09/2024321304539Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
01/09/2024321304539Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/09/2024321304539Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/09/2024321304539Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/09/2024321304539Open ↗
▸BISMASONRY1
01/09/2024321304539Open ↗
▸BISPOST-INSTALLED ANCHORS1
01/09/2024321304539Open ↗
▸BISFUEL-GAS PIPING (WELDING)1
01/09/2024321304539Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/09/2024321304539Open ↗
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
02/07/2024321304539Open ↗
11/09/2020340537510Open ↗
08/20/2020340522795Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/21/2026B01244399-I1Open ↗
08/21/2026B01229548-P1Open ↗
08/13/2026B01229548-S2Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
11/09/2020340537510Open ↗
08/20/2020340522795Open ↗
08/02/2019340525060Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/21/2026B01229548-P1Open ↗
08/13/2026B01229548-I1Open ↗
08/13/2026B01229548-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026B01229548-S3Open ↗
08/13/2026B01229548-I1Open ↗
08/13/2026B01229548-S2Open ↗
▸BISFINAL1
01/09/2024321304539Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/20/2010320149479Open ↗
▸BISSHED LETTER1
07/26/2018340525060Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT15
02/06/2024321304539Open ↗
02/06/2024321304539Open ↗
02/06/2024321304539Open ↗
Showing 3 of 15 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/22/2023321304539Open ↗
▸Filing & Intake Forms20
▸BISEFILING JOB APPLICATION COVER SHEET6
08/23/2017340537510Open ↗
07/18/2017340525060Open ↗
07/13/2017340522795Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION6
08/28/2023321304539Open ↗
08/28/2023321304539Open ↗
09/28/2020321304539Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
01/29/2016321304539Open ↗
01/29/2016321304539Open ↗
01/29/2016321304539Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
01/30/2023321304539Open ↗
12/13/2018340436969Open ↗
12/13/2018340437502Open ↗
▸Other Documents9
▸BISFEE EXEMPTION DOCUMENTATION2
10/27/2016340437502Open ↗
10/26/2016340436969Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/30/2017321304539Open ↗
07/18/2017340525060Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
03/30/2018321304539Open ↗
10/31/2014340198342Open ↗
▸BISMAINTENANCE INFORMATION1
01/09/2024321304539Open ↗
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
01/09/2024321304539Open ↗
▸DOB NOWIRA Certification1
08/13/2026B01143776-I1Open ↗