179 JEFFERSON AVENUE
STATEN ISLAND · BIN 5051118
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R3XZoning
2,856 sfGross Floor Area
1Units
2 Active Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,750 sf lot · 0.5 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof4p · 2 filings · 20 docs
Floor 213p · 2 filings · 20 docs
Floor 115p · 3 filings · 20 docs
Cellar15p · 3 filings · 20 docs
Site & exteriorProposed construction fence for public protection1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adl Engineering605/05/2026
Dimo Engineering301/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dimo Design503/21/2026
Dimo Engineering403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
N Tech Design of AmericaGeneral Contractor603/21/2026
Nino General ContractingScaffold603/21/2026
Nino General ContractingGeneral Contractor404/09/2026
N Tech Design of AmericaScaffold303/21/2026
Aqueduct MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Dimo Engineering4121201/02/2025
M. International Engineering3129201/02/2025
Building Lifecycle
06/20/2026
Permit expired, never signed off — Construction Fence
The city's record still shows this permit as issued, with no sign-off on its filing
S00795379-I1-FN
06/20/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S00882138-I1-GC
05/05/2026
Filed — Alteration
PROPOSING NEW PLUMBING FIXTURES, NEW HEATING SYSTEM AND NEW GAS FIXTURES AS PER PLANS FILED NO CHANGE IN USE EGRESS OR OCCUPANCY
S00906844-P3
12/17/2025
As per section 28-207.2 stop all work under permit S08000003-I1 on 12-25-2025 due to intent to revoke approval & permit. Stop all work immediately…
DOB violation · open
10/28/2025
Filed — Alteration
PROPOSING NEW PLUMBING FIXTURES, NEW HEATING SYSTEM AND NEW GAS FIXTURES AS PER PLANS FILED NO CHANGE IN USE EGRESS OR OCCUPANCY
S00906844-P2
76 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNino General Contracting06/20/2025
DOB NOWConstruction FencePermit IssuedNino General Contracting06/20/2025
DOB NOWPlumbingSigned-offAqueduct Mechanical07/02/2024
DOB NOWGeneral ConstructionPermit IssuedNino General Contracting05/31/2024
DOB NOWConstruction FencePermit IssuedNino General Contracting05/31/2024
DOB NOWMechanical SystemsPermit IssuedN Tech Design of America12/28/2023
DOB NOWGeneral ConstructionPermit IssuedN Tech Design of America06/07/2023
DOB NOWConstruction FencePermit IssuedN Tech Design of America03/15/2023
1 project · most recent 01/02/2025
Ventilation Systems
FiledStatusContractorScope
01/02/2025Permit IssuedN Tech Design of AmericaVentilation Systems
1 project · most recent 05/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/05/2026Signed-offAqueduct MechanicalGas, Water/Sanitary
1 project · most recent 12/28/2023
General Wiring
FiledStatusContractorScope
12/28/2023Permit IssuedDream Team ElectricalGeneral Wiring
1 project · most recent 01/02/2025
Steel Concrete Masonry Wood
FiledStatusContractorScope
01/02/2025Permit IssuedN Tech Design of AmericaSteel, Concrete, Masonry, Wood
1 project · most recent 08/17/2022
Fence
FiledStatusContractorScope
08/17/2022Permit IssuedNino General ContractingFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
01/02/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)GEORGE GUTTMANNspecial
01/02/2025HVAC-R and service water heating equipment—energy_progress
01/02/2025HVAC-R and service water piping design and insulation—energy_progress
01/02/2025HVAC-R and service water heating system controls—energy_progress
01/02/2025Lowest Floor ElevationGEORGE GUTTMANNprogress
01/02/2025FinalGEORGE GUTTMANNprogress
01/02/2025Structural Steel - DetailsNANIK MASSANDspecial
01/02/2025Structural Stability – Alterations of existing buildingsGEORGE GUTTMANNspecial
01/02/2025Structural Cold-Formed SteelGEORGE GUTTMANNspecial
01/02/2025Mechanical SystemsGEORGE GUTTMANNspecial
01/02/2025MasonryGEORGE GUTTMANNspecial
04/25/2023Structural Stability – Alterations of existing buildings—special
04/24/2023Lowest Floor Elevation—progress
04/24/2023Footing and Foundation—progress
04/24/2023Final—progress
09/07/2022Structural Stability – Alterations of existing buildingsGEORGE GUTTMANNspecial
09/07/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)GEORGE GUTTMANNspecial
09/07/2022FinalGEORGE GUTTMANNprogress
09/07/2022Structural Cold-Formed SteelGEORGE GUTTMANNspecial
09/07/2022MasonryGEORGE GUTTMANNspecial
09/07/2022Structural Steel - DetailsNANIK MASSANDspecial
09/07/2022Lowest Floor ElevationGEORGE GUTTMANNprogress
09/07/2022Mechanical SystemsGEORGE GUTTMANNspecial
69 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account