← Back
BuildNYC
Two stories - detached, small or mid-size
179 LEXINGTON AVENUE
STATEN ISLAND · BIN 5024906
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3AZoning
792 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,314 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Oil to gas conversion, new gas meter, stove, boiler, water h2p · 1 filing · 7 docs
CellarOil to gas conversion, new gas meter, stove, boiler, water h2p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Steven R. Savino Architect209/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cam Energy Heating & MechanicalPlumbing108/14/2026
Building Lifecycle
10/07/2026
Signed off — Alteration
OIL TO GAS CONVERSION, AND ADD A NEW GAS METER, INSTALL NEW GAS STOVE, BOILER AND HOT WATER HEATER
S01438947-I1
09/16/2026
Filed — Alteration
OIL TO GAS CONVERSION, AND ADD A NEW GAS METER, INSTALL NEW GAS STOVE, BOILER AND HOT WATER HEATER
S01438947-P1
09/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
09/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
09/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
13 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCam Energy Heating & Mechanical08/13/2026
1 project · most recent 09/16/2026
Gas
FiledStatusContractorScope
09/16/2026Signed-offCam Energy Heating & MechanicalGas
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/03/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/14/2026HVAC-R and service water heating equipmentSteven Savinoenergy_progress
09/14/2026Energy Code Compliance InspectionsSteven Savinoprogress
09/14/2026HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
09/14/2026HVAC-R and service water heating system controlsSteven Savinoenergy_progress
08/04/2026Energy Code Compliance InspectionsSteven Savinoprogress
08/04/2026HVAC-R and service water heating system controlsSteven Savinoenergy_progress
08/04/2026HVAC-R and service water heating equipmentSteven Savinoenergy_progress
08/04/2026HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account