← Back
Elevator apt, semi-fireproof with stores
179 NORTH 7 STREET
BROOKLYN · BIN 3335676
💬 Discuss this project
2019Year Built
4Stories
D7Building Class
R6BZoning
12,020 sfGross Floor Area
10Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 179 NORTH 7 LLC · 5,000 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 1Under Construction13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
G S INSTALLATIONS 1113007/08/2026
HKS CONSTRUCTION707/08/2026
179 NORTH 72503/22/2026
CNS BUILDERS LLC1503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/27/2015$5.7M—Private party → 179 NORTH 7 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB404/10/2026
VASILIOS ARTEMIOU PE512/29/2025
HAIDER ENGINEERING, P.E.107/13/2019
DOOLING & COMPANY ARCHITECTS204/03/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G S INSTALLATIONS 111803/21/2026
SNR EXPEDITING DESIGN203/21/2026
AE DESIGN SOLUTION403/21/2026
EXPRESS FILING INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor307/08/2026
PRIME PIPING HEATING INPlumbing303/22/2026
ORION CONTRACTING SERVICEGeneral Contractor204/09/2026
JETWORK SERVICES LLCPlumbing207/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
HKS CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161004/10/2026
Building Lifecycle
All (83)Filed (12)Permit Issued (7)Signed Off (7)Violation (28)Inspection (5)Objection (4)Special Inspection (20)
04/30/2026
Signed off — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-I1
04/28/2026
Objection resolved — Addressed
04/23/2026
Objection raised — Scope
04/10/2026
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-P5
02/01/2026
Signed off — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-S2
02/01/2026
Signed off — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-S3
01/09/2026
Signed off — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-S1
01/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/31/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/29/2025
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-P4
12/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/28/2025
Special inspection requirement — Final
SHAHRIAR QUAYYUM
12/28/2025
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
12/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/28/2025
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
12/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
12/28/2025
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
12/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
12/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
12/11/2025
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
12/11/2025
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
12/04/2025
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-P3
11/20/2025
Permit issued — Sprinklers
B01240711-S2-EW-SP
11/19/2025
Permit issued — Mechanical Systems
B01240711-S1-MS
11/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/13/2025
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-P2
10/23/2025
Permit issued — General Construction
B01240711-I1-GC
10/22/2025
Permit issued — Plumbing
B01240711-S3-PL
09/09/2025
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-S3
09/04/2025
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-S2
09/04/2025
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-S1
07/31/2025
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-P1
07/22/2025
Special inspection requirement — Metering
07/22/2025
Special inspection requirement — Lighting controls
07/22/2025
Special inspection requirement — Maintenance information
07/22/2025
Special inspection requirement — Lighting in dwelling units
07/22/2025
Special inspection requirement — Interior lighting power
07/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
07/22/2025
Special inspection requirement — Energy Code Compliance Inspections
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/01/2025
Objection resolved — Addressed
06/27/2025
Objection raised — Scope
06/18/2025
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01240711-I1
B01240711-I1
04/20/2021
Violation issued (HPD, closed)
A
02/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/16/2020
Signed off — Alteration
B00149582-I1
03/16/2020
Signed off — Alteration
B00143666-I1
12/31/2019
Signed off — Alteration
B00188616-I1
11/25/2019
Violation issued (ECB, closed)
Construction
11/23/2019
Violation issued (ECB, closed)
Construction
11/23/2019
Violation issued (ECB, closed)
Construction
07/25/2019
Violation issued (ECB, closed)
Construction
07/24/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/15/2019
Permit issued — Supported Scaffold
B00188616-I1-SF
07/13/2019
Filed — Alteration
B00188616-I1
05/07/2019
Violation issued (ECB, closed)
Construction
05/07/2019
Violation issued (ECB, closed)
Construction
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offA M B MECHANICAL INC11/20/2025
DOB NOWMechanical SystemsSigned-offORION CONTRACTING SERVICE11/19/2025
DOB NOWGeneral ConstructionPermit IssuedORION CONTRACTING SERVICE10/23/2025
DOB NOWPlumbingSigned-offJETWORK SERVICES LLC10/22/2025
DOB NOWSupported ScaffoldSigned-offHKS CONSTRUCTION CORP07/15/2019
DOB NOWSupported ScaffoldSigned-offPOWERS BRIDGING & SCAFFOL04/03/2019
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL03/26/2019
BIS—ISSUEDC N S BUILDERS LLC11/28/2019
BISEQISSUEDC N S BUILDERS LLC11/28/2019
BISPLISSUEDPRECISION PLBG SVCS., INC03/07/2019
BISEQISSUEDC N S BUILDERS LLC12/26/2018
BIS—ISSUEDC N S BUILDERS LLC12/21/2018
BIS—ISSUEDC N S BUILDERS LLC08/30/2018
BIS—ISSUEDC N S BUILDERS LLC08/30/2018
BIS—ISSUEDYATZIV CORP06/13/2018
BIS—ISSUEDC N S BUILDERS LLC12/28/2017
BISEQISSUEDC N S BUILDERS LLC12/28/2017
BIS—ISSUEDC N S BUILDERS LLC12/28/2017
BISEQISSUEDPILKU CONSTRUCTION SERVIC03/02/2017
BIS—ISSUEDYATZIV CORP02/23/2017
BISEQISSUEDYATZIV CORP02/22/2017
BISEQISSUEDHKS CONSTRUCTION CORP02/29/2016
1 project · most recent 04/10/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/10/2026Signed-offORION CONTRACTING SERVICEHeating and Air Conditioning Systems
Heat / Cool
Samsung AJ024DXJ3CG 22,000 BTU · Vrf Outdoor ×4
AJ036DXJ4CG 36,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 04/10/2026
Sprinkler System
FiledStatusContractorScope
04/10/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 04/10/2026
Water/Sanitary
FiledStatusContractorScope
04/10/2026Signed-offJETWORK SERVICES LLCWater/Sanitary
5 projects · most recent 08/26/2025
General Wiring
FiledStatusContractorScope
08/26/2025CompleteNATIONAL POWER ELECTRIC LGeneral Wiring
05/01/2020CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
06/24/2019CompleteTUXEDO ELEC'L CONTR'G INC—
03/14/2019CompleteHIVOLTS ELECTRICAL INC—
03/14/2019CompleteOPTIMAL ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/31/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
12/28/2025FinalSHAHRIAR QUAYYUMprogress
12/28/2025Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
12/28/2025Tenant Protection Plan Compliance—special
12/28/2025Mechanical SystemsSHAHRIAR QUAYYUMspecial
12/28/2025HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
12/28/2025Maintenance informationSHAHRIAR QUAYYUMenergy_progress
12/28/2025HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
12/28/2025HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
12/11/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
12/11/2025Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
12/11/2025Post-installed AnchorsSHAHRIAR QUAYYUMspecial
12/11/2025Sprinkler SystemsSHAHRIAR QUAYYUMspecial
07/22/2025Metering—energy_progress
07/22/2025Lighting controls—energy_progress
07/22/2025Maintenance information—energy_progress
07/22/2025Lighting in dwelling units—energy_progress
07/22/2025Interior lighting power—energy_progress
07/22/2025Fire-Resistance Rated Construction—progress
07/22/2025Energy Code Compliance Inspections—progress
07/22/2025Fire-Resistant Penetrations and Joints—special
▾Documents — 233 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch9
08/20/2026B01240711-P4Request digital key ↗
08/20/2026B01240711-P3Request digital key ↗
08/20/2026B01240711-S3Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/02/2026B00149582-I1Request digital key ↗
09/02/2026B00188616-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00143666-I1Request digital key ↗
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION16
05/01/2020340346995Open ↗
02/01/2020321482757Open ↗
01/23/2020321482757Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION15
07/15/2019321482757Open ↗
03/08/2019321482757Open ↗
12/26/2018321482757Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
12/31/2019321482757Open ↗
11/25/2019321533364Open ↗
09/09/2019321482757Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/01/2018321533364Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/09/2018321482757Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM4
02/10/2020321482757Open ↗
10/26/2019321482757Open ↗
10/26/2019321482757Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
10/24/2017321482757Open ↗
▸BISZONING RESOLUTION DETERMINATION1
10/24/2017321482757Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/24/2017321482757Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/29/2017321482757Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026B00143666-I1Open ↗
09/02/2026B00149582-I1Open ↗
08/20/2026B01240711-P5Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
03/28/2020340346995Open ↗
03/09/2020321482757Open ↗
03/09/2020321482757Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B01240711-P4Open ↗
08/24/2026B01240711-S2Open ↗
08/24/2026B01240711-S2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/28/2017340476470Open ↗
01/28/2016340346995Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/28/2017340476470Open ↗
01/28/2016340346995Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/28/2017340476470Open ↗
01/28/2016340346995Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026B01240711-P4Open ↗
08/29/2026B01240711-P4Open ↗
▸Trade Schedules & Equipment25
▸BISEQUIPMENT USE PERMITS14
01/05/2021321482757Open ↗
01/05/2021321482757Open ↗
01/05/2021321482757Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
02/01/2020321482757Open ↗
01/23/2020321482757Open ↗
01/21/2020321482757Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/05/2021321482757Open ↗
10/31/2020321482757Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
08/13/2019321482757Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
10/24/2017321482757Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/16/2020321527059Open ↗
▸BISSEWER CUT-OFF1
02/24/2017321276668Open ↗
▸Safety & Tenant Protection22
▸DOB NOWHPD-1: Anti-Harassment Area Checklist11
08/15/2026B01240711-P5Open ↗
08/13/2026B01240711-S3Open ↗
08/13/2026B01240711-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWStreet Tree Checklist4
08/20/2026B01240711-P2Open ↗
08/20/2026B01240711-P1Open ↗
08/15/2026B01240711-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
05/01/2018321533364Open ↗
10/24/2017321482757Open ↗
11/30/2016321482757Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
05/01/2018321533364Open ↗
▸BISSTREET TREE SIGNOFF1
10/31/2020321482757Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
10/24/2017321482757Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/27/2015321276668Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/24/2017321276668Open ↗
11/27/2015321276668Open ↗
▸BISRODENT CONTROL1
02/24/2017321276668Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/09/2020321482757Open ↗
03/09/2020321482757Open ↗
12/29/2017321482757Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/18/2020321482757Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/31/2020321482757Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/28/2017340476470Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B01240711-S3Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
12/29/2017321482757Open ↗
12/29/2017321482757Open ↗
12/29/2017321482757Open ↗
Showing 3 of 6 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT5
05/16/2019321482757Open ↗
05/16/2019321482757Open ↗
04/17/2018321482757Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
05/07/2020321482757Open ↗
05/07/2020321482757Open ↗
12/29/2017321482757Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/28/2017340476470Open ↗
01/28/2016340346995Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
11/06/2017321482757Open ↗
▸BISHYDRO FLOW TEST LETTER1
10/24/2017321482757Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/24/2017321482757Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/18/2020321482757Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
11/30/2020321482757Open ↗
11/18/2020321482757Open ↗
11/16/2020321527059Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
03/24/2017321482757Open ↗
02/28/2017321482757Open ↗
01/27/2017321482757Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/20/2020321533364Open ↗
04/20/2016321276668Open ↗
04/20/2016321276668Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS APPROVAL1
02/24/2017321276668Open ↗
▸BISSUPERSEDING LETTER1
08/31/2018321482757Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
02/24/2017321276668Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE4
06/15/2018321276668Open ↗
06/15/2018321276668Open ↗
12/29/2017321482757Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
12/29/2017321482757Open ↗
▸BISCOST AFFIDAVIT1
11/30/2016321482757Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/16/2020321527059Open ↗
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION11
10/29/2020321527059Open ↗
04/20/2020321533364Open ↗
02/13/2020321482757Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET7
04/10/2017321482757Open ↗
03/30/2017321533364Open ↗
02/24/2017321527059Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
03/28/2020340346995Open ↗
02/20/2020340346995Open ↗
02/01/2020340476470Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/28/2017340476470Open ↗
01/28/2016340346995Open ↗
▸BISSRO INTAKE FORM(SRO1)1
02/24/2017321276668Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/01/2018321533364Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification4
08/20/2026B01240711-P2Open ↗
08/20/2026B01240711-P1Open ↗
08/15/2026B01240711-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/24/2017321482757Open ↗
10/24/2017321482757Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
08/13/2026B00149582-I1Open ↗
08/13/2026B00143666-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
08/13/2026B00143666-I1Open ↗
08/13/2026B00149582-I1Open ↗
▸BISSITE CONNECTION:DEP1
10/24/2017321482757Open ↗
▸BISPLOT DIAGRAM1
10/24/2017321482757Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
12/29/2017321482757Open ↗