← Back
BuildNYC
Two stories - detached, small or mid-size
179 WIMAN AVENUE
STATEN ISLAND · BIN 5068187
💬 Discuss this project
1944Year Built
2Stories
A1Building Class
C3AZoning
1,316 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,970 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation3p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Building Associates102/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R Solar Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Harvest PowerGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244102/05/2025
Building Lifecycle
06/11/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
S01149103-I1
02/27/2025
Permit issued — Solar
S01149103-I1-SL
02/05/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
S01149103-I1
11/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
11/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offHarvest Power02/27/2025
BIS—ISSUEDN/A02/03/1992
1 project · most recent 01/31/2025
FiledStatusContractorScope
01/31/2025CompleteIsland Electric—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/29/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
11/29/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
11/29/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
11/29/2024FinalNARESH MAHANGUprogress
11/29/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account