← Back
BuildNYC
One story - permanent living quarter
1791 ROCKAWAY PARKWAY
BROOKLYN · Canarsie · BIN 3232826
💬 Discuss this project
1920Year Built
1Stories
A2Building Class
R4AZoning
720 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One story - permanent living quarter · Owner of record: Forbes Mazal BH · 2,750 sf lot · 0.26 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Propose Horizontal and Vertical Enlargement and Convert One 31p · 1 filing · 20 docs
Floor 1Propose Horizontal and Vertical Enlargement and Convert One 22p · 1 filing · 20 docs
CellarPropose Horizontal and Vertical Enlargement and Convert One 25p · 1 filing · 20 docs
Site & exteriorPropose Horizontal and Vertical Enlargement and Convert One 20p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2024$309K—Private party → FORBES MAZAL BH LLC$429/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Hansa Building Engineering Services808/26/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alco BuildersGeneral Contractor204/09/2026
Alco BuildersScaffold104/09/2026
Watermark PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E Build Evergreen I9342308/26/2026
NKM Engineering6244108/05/2025
Triangle Inspection & Tes7495108/05/2025
Building Lifecycle
10/15/2026
Signed off — Alteration CO
PROPOSED PLUMBING WORK-TYPE FILED IN-CONJUNCTION WITH ALT-CO JOB#: B01066566
B01066566-I1
08/26/2026
Filed — Alteration CO
PROPOSED PLUMBING WORK-TYPE FILED IN-CONJUNCTION WITH ALT-CO JOB#: B01066566
B01066566-P5
08/26/2026
Special inspection requirement — Protection of exposed foundation insulation
umer shah
08/26/2026
Special inspection requirement — Air barrier - visual inspection
umer shah
08/26/2026
Special inspection requirement — Footing and Foundation
umer shah
71 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWatermark Plumbing08/11/2025
DOB NOWStructuralPermit IssuedAlco Builders06/03/2025
DOB NOWGeneral ConstructionSigned-offAlco Builders06/03/2025
DOB NOWConstruction FenceSigned-offAlco Builders05/29/2025
1 project · most recent 08/26/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/26/2026Signed-offWatermark PlumbingGas, Storm, Water/Sanitary
1 project · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026CompleteBR ElectricalGeneral Wiring
1 project · most recent 08/26/2026
Masonry
FiledStatusContractorScope
08/26/2026Signed-offWatermark PlumbingMasonry
1 project · most recent 08/26/2026
Fence
FiledStatusContractorScope
08/26/2026Signed-offWatermark PlumbingFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/05/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
08/26/2026Concrete - Cast-In-PlaceDanny Chenspecial
08/26/2026Meteringumer shahenergy_progress
08/26/2026Fenestration air leakageumer shahenergy_progress
08/26/2026Maintenance informationumer shahenergy_progress
08/26/2026Protection of exposed foundation insulationumer shahenergy_progress
08/26/2026Electric vehicle service equipment requirementsumer shahenergy_progress
08/26/2026Interior lighting powerumer shahenergy_progress
08/26/2026Air barrier - visual inspectionumer shahenergy_progress
08/26/2026Fenestration and door U-factor and product ratingsumer shahenergy_progress
08/26/2026Insulation placement and R valuesumer shahenergy_progress
08/26/2026Fenestration areasumer shahenergy_progress
08/26/2026Lowest Floor Elevationumer shahprogress
08/26/2026Footing and Foundationumer shahprogress
08/26/2026Fire-Resistance Rated Constructionumer shahprogress
08/26/2026Finalumer shahprogress
08/26/2026Energy Code Compliance Inspectionsumer shahprogress
08/26/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/26/2026Subgrade InspectionsDanny Chenspecial
08/26/2026Structural Stability – Alterations of existing buildingsDanny Chenspecial
08/26/2026MasonryDanny Chenspecial
08/26/2026Fire-Resistant Penetrations and JointsDanny Chenspecial
01/19/2026Meteringumer shahenergy_progress
01/19/2026Concrete - Cast-In-PlaceDanny Chenspecial
01/19/2026Fire-Resistant Penetrations and JointsDanny Chenspecial
01/19/2026MasonryDanny Chenspecial
Latest 25 of 84.
61 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account