← Back
Elevator apt, semi-fireproof with stores
1795 RIVERSIDE DRIVE
MANHATTAN · BIN 1065054
💬 Discuss this project
1925Year Built
6Stories
D7Building Class
R7-2Zoning
80,736 sfGross Floor Area
75Units
LL97 CoveredRent Stabilized117 Open Violations 109 unresolved · 8 paperwork only ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: RIVERSIDE 1795 ASSOCIATES, · 17,125 sf lot · 4.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 2 filings · 10 docs
Floor 12p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STELLAR MANAGEMENT4903/22/2026
PLATINUM SERVICES NY603/22/2026
RIVERSIDE 1795 ASSOC.3003/22/2026
RIVERSIDE 1795 ASSOCIA103/22/2026
SLELLAR MANAGEMENT103/22/2026
1795 RIVERSIDE DR ETA103/22/2026
NORWAX ASSOCIATES103/22/2026
S.S. CONSTRUCTION103/22/2026
PHOENIX103/21/2026
BILLY ENTERPRISES403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP109/23/2023
TARIQ M. BASHIR102/28/2023
COLOMBO ARCHITECTURAL STUDIO PC202/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LLOYD NOEL BUILDING CONSULTANT103/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor303/21/2026
UNIQUE CONSTRUCTION &General Contractor303/21/2026
SAMUEL & SONS P & H INCPlumbing307/08/2026
RAGEM CONSTRUCTION CORPGeneral Contractor203/21/2026
MUZAFER ZEKIROSKIElectrical103/21/2026
PARAMOUNT PLBG & HTG CO IElectrical103/21/2026
JESUS CORPORANElectrical103/21/2026
VALENTIS ELECTRIC, INC.Electrical103/22/2026
SOOKDEO, RICADOElectrical103/21/2026
KIRK, JOHNElectrical103/21/2026
MELVYN ZWEBNERElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TARIQ M. BASHIR, P.E.5915102/28/2023
JOSE A SANTOS PE, PC3292105/20/2021
Building Lifecycle
All (109)Filed (5)Permit Issued (5)Signed Off (4)Facade (FISP) (15)Violation (60)Inspection (2)Special Inspection (18)
04/15/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
M01235670-I1
02/11/2026
Violation issued (HPD, closed)
A
02/11/2026
Violation issued (HPD, closed)
A
02/11/2026
Violation issued (HPD, closed)
A
02/11/2026
Violation issued (HPD, closed)
A
02/11/2026
Violation issued (HPD, closed)
A
01/31/2026
Violation issued (HPD, closed)
C
01/31/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, open)
B
01/23/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, open)
C
01/23/2026
Violation issued (HPD, closed)
B
01/23/2026
Violation issued (HPD, open)
B
01/23/2026
Violation issued (HPD, open)
B
01/23/2026
Violation issued (HPD, open)
B
01/23/2026
Violation issued (HPD, open)
B
01/23/2026
Violation issued (HPD, open)
B
01/23/2026
Violation issued (HPD, open)
B
01/23/2026
Violation issued (HPD, closed)
A
10/27/2025
Violation issued (HPD, open)
C
10/27/2025
Violation issued (HPD, closed)
B
10/27/2025
Violation issued (HPD, closed)
B
10/27/2025
Violation issued (HPD, closed)
B
09/08/2025
Cycle 10 facade report signed — SWARMP
08/22/2025
Violation issued (HPD, open)
B
08/22/2025
Violation issued (HPD, open)
B
08/22/2025
Violation issued (HPD, open)
B
08/22/2025
Violation issued (HPD, closed)
B
08/22/2025
Violation issued (HPD, closed)
B
08/22/2025
Violation issued (HPD, closed)
B
08/22/2025
Violation issued (HPD, open)
B
08/11/2025
Cycle 10 facade report submitted
06/26/2025
Cycle 10 facade inspection completed
06/13/2025
Permit issued — Suspended Scaffold
M01235670-I1-SC
06/10/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
M01235670-I1
04/09/2025
Cycle 9 facade inspection completed
04/09/2025
Cycle 9 facade report signed — SAFE
01/14/2025
Signed off — Alteration
M00934976-I1
07/25/2024
Violation issued (ECB, closed)
Construction
07/17/2024
Violation issued (ECB, closed)
Construction
06/27/2024
Violation issued (HPD, closed)
B
06/27/2024
Violation issued (HPD, closed)
B
06/12/2024
Violation issued (HPD, closed)
C
06/08/2024
Violation issued (HPD, closed)
A
06/08/2024
Violation issued (HPD, closed)
C
06/08/2024
Violation issued (HPD, open)
B
05/18/2024
Violation issued (HPD, closed)
A
05/18/2024
Violation issued (HPD, closed)
C
05/18/2024
Violation issued (HPD, closed)
B
05/18/2024
Violation issued (HPD, closed)
B
05/18/2024
Violation issued (HPD, closed)
B
05/18/2024
Violation issued (HPD, closed)
B
04/02/2024
Violation issued (HPD, closed)
B
03/25/2024
Cycle 9 facade report submitted
11/06/2023
Permit issued — General Construction
M00805446-I1-GC-CX
10/21/2023
Violation issued (HPD, closed)
B
10/21/2023
Violation issued (HPD, closed)
A
10/21/2023
Violation issued (HPD, closed)
A
10/02/2023
Violation issued (HPD, closed)
C
09/25/2023
Permit issued — Sidewalk Shed
M00934976-I1-SH
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM06/13/2025
DOB NOWGeneral ConstructionPermit IssuedUNIQUE CONSTRUCTION &11/06/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/25/2023
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC03/10/2022
DOB NOWMechanical SystemsSigned-offRAGEM CONSTRUCTION09/22/2021
BISOTISSUEDACCURATE AND RELIABLE HOM06/23/2020
BISOTISSUEDYORK RESTORATION CORP02/28/2020
BISOTISSUEDACCURATE AND RELIABLE HOM04/19/2019
BISOTISSUEDDURABLIS SOLUTIONS, INC12/14/2018
BISOTISSUEDYORK RESTORATION CORP11/13/2018
BISOTISSUEDYORK RESTORATION CORP08/30/2018
BISPLISSUEDZONE PLUMBING & HEATING C08/07/2018
BISOTISSUEDTHE HARVEY GROUP LLC08/06/2018
BISPLISSUEDZONE PLUMBING & HEATING C07/31/2018
BISOTISSUEDTHE HARVEY GROUP LLC07/03/2018
BISEQISSUEDYORK RESTORATION CORP04/17/2018
BISOTISSUEDYORK RESTORATION CORP03/23/2018
BISEQISSUEDYORK RESTORATION CORP03/19/2018
BISOTISSUEDAKI RENOVATIONS GROUP INC01/11/2018
BISPLISSUEDZONE PLUMBING & HEATING C12/18/2017
BISOTISSUEDAKI RENOVATIONS GROUP INC10/27/2017
BISOTISSUEDYORK RESTORATION CORP06/28/2017
BISEQISSUEDYORK RESTORATION CORP04/07/2017
BISEQISSUEDYORK RESTORATION CORP03/24/2017
BISPLISSUEDZONE PLUMBING & HEATING C02/14/2017
BISOTISSUEDACCURATE AND RELIABLE HOM01/10/2017
BISPLISSUEDORION PLUMBING & HTG CORP10/14/2016
BISOTISSUEDACCURATE AND RELIABLE HOM10/12/2016
BISOTISSUEDACCURATE AND RELIABLE HOM08/15/2016
BISPLISSUEDGSB PLUMBING & HEATING CO06/22/2016
BISPLISSUEDTHE PLBG & HTG SPECIALIST04/26/2016
BISOTISSUEDACCURATE AND RELIABLE HOM11/16/2015
BISOTISSUEDAGO & ALAUDIN GENERAL CON11/12/2015
BISPLISSUEDORION PLUMBING & HTG CORP09/22/2015
BISOTISSUEDACCURATE AND RELIABLE HOM08/26/2015
BISOTISSUEDM.E.H CONTRACTORS INC04/22/2015
BISOTISSUEDM.E.H CONTRACTORS INC03/20/2015
BISOTISSUEDACCURATE AND RELIABLE HOM02/18/2015
BISOTISSUEDACCURATE AND RELIABLE HOM12/02/2014
BISOTISSUEDACCURATE AND RELIABLE HOM11/17/2014
+ 15 more permits on file
5 projects · most recent 11/17/2023
General Wiring
FiledStatusContractorScope
11/17/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
10/20/2021Permit IssuedL J ELEC'L SERV. INC.General Wiring
04/20/2020Complete247 ELECTRICAL CORP—
03/24/2020CompleteLEONE ELECTRIC CO. INCGeneral Wiring
05/28/2019CompleteVALENTIS ELECTRIC, INC.General Wiring
1 project · most recent 02/28/2023
Masonry
FiledStatusContractorScope
02/28/2023Permit IssuedUNIQUE CONSTRUCTION &Masonry
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
02/10/2023Tenant Protection Plan ComplianceTARIQ BASHIRspecial
12/28/2022Structural Stability – Alterations of existing buildingsTARIQ BASHIRspecial
12/28/2022FinalTARIQ BASHIRprogress
12/28/2022MasonryTARIQ BASHIRspecial
12/28/2022Construction Operations Influencing Adjacent StructuresTARIQ BASHIRspecial
06/07/2021HVAC-R and service water piping design and insulationJose Santosenergy_progress
06/07/2021Fenestration and door U-factor and product ratingsJose Santosenergy_progress
06/07/2021Fenestration areasJose Santosenergy_progress
06/07/2021HVAC-R and service water heating system controlsJose Santosenergy_progress
06/07/2021HVAC-R and service water heating equipmentJose Santosenergy_progress
06/07/2021Maintenance informationJose Santosenergy_progress
02/10/2021Lighting controlsJose Santosenergy_progress
02/10/2021Fire-Resistant Penetrations and JointsJose Santosspecial
02/10/2021Structural Stability – Alterations of existing buildingsJose Santosspecial
02/10/2021Mechanical SystemsJose Santosspecial
02/10/2021FinalYahaira Volquez Colomboprogress
02/10/2021Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
02/10/2021Interior lighting powerJose Santosenergy_progress
▾Documents — 578 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
09/03/2026M00468457-S1Request digital key ↗
08/31/2026M00805446-I1Request digital key ↗
08/29/2026M00934976-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/03/2026M00468457-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00468457-I1Request digital key ↗
▸Applications & Permits102
▸BISPLAN / WORK APPROVAL APPLICATION53
12/04/2019140599519Open ↗
11/19/2019123550692Open ↗
11/12/2019123550692Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION47
04/18/2019140844139Open ↗
12/17/2018123550692Open ↗
11/09/2018140813911Open ↗
Showing 3 of 47 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/28/2018140599519Open ↗
02/07/2017140599519Open ↗
▸Seals & Professional Certifications135
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
12/17/2019123550692Open ↗
07/24/2019140599519Open ↗
07/10/2018123550692Open ↗
Showing 3 of 43 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT19
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
08/03/2018140789715Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY17
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
08/03/2018140789715Open ↗
Showing 3 of 17 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION17
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
08/03/2018140789715Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
07/10/2018123550692Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/24/2026M00805446-I1Open ↗
09/20/2026M00468457-I1Open ↗
09/20/2026M00468457-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/24/2026M00805446-I1Open ↗
09/24/2026M00805446-I1Open ↗
09/24/2026M00805446-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00468457-S1Open ↗
09/03/2026M00468457-I1Open ↗
08/29/2026M00934976-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
01/31/2017140599519Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment20
▸BISSCHEDULE B - PLUMBING12
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
08/03/2018140789715Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
11/01/2017140709311Open ↗
10/26/2017140709311Open ↗
Showing 2 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection12
▸BISTENANT PROTECTION PLAN AND NOTES12
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
08/03/2018140789715Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos38
▸BISASBESTOS: CERTIFICATION (DEP ACP5)27
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
08/03/2018140789715Open ↗
Showing 3 of 27 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026M00468457-I1Open ↗
09/03/2026M00468457-S1Open ↗
08/13/2026M00805446-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
08/28/2018140599519Open ↗
06/28/2017140555780Open ↗
▸Energy Compliance80
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
12/17/2019123550692Open ↗
07/10/2018123550692Open ↗
04/25/2018140553318Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY16
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
08/28/2018140599519Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
08/13/2020140555780Open ↗
12/17/2019123550692Open ↗
07/24/2019140599519Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS14
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
08/03/2018140789715Open ↗
Showing 3 of 14 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/22/2017140615751Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00468457-I1Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY26
08/13/2020140555780Open ↗
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
Showing 3 of 26 on file for this type
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
12/17/2019123550692Open ↗
04/25/2018140553318Open ↗
04/10/2018140591651Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER2
04/23/2018140615751Open ↗
Showing 1 of 2 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership70
▸BISCOST AFFIDAVIT49
12/17/2019123550692Open ↗
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
Showing 3 of 49 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT16
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
08/03/2018140789715Open ↗
Showing 3 of 16 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST4
01/10/2017140591651Open ↗
Showing 1 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/21/2022140555780Open ↗
▸Filing & Intake Forms58
▸BISEFILING JOB APPLICATION COVER SHEET21
04/18/2019140844139Open ↗
10/25/2018140813911Open ↗
08/03/2018140789715Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION18
04/09/2018140553318Open ↗
03/28/2018140591651Open ↗
11/01/2017140709311Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM10
12/17/2019123550692Open ↗
11/12/2019123550692Open ↗
07/24/2019140599519Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET9
07/10/2018123550692Open ↗
Showing 1 of 9 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01235670-I1Open ↗