← Back
Single or multiple dwelling with stores or offices
1798 WEST 8 STREET
BROOKLYN · Gravesend (West) · BIN 3176710
💬 Discuss this project
1931Year Built
2Stories
S9Building Class
R5BZoning
4,000 sfGross Floor Area
7Units
1 Open Violation ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 1798 WEST 8TH STREET, LLC · 2,000 sf lot · 2 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 15p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1798 WEST 8TH STREET, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP205/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371205/23/2024
Building Lifecycle
All (18)Filed (2)Permit Issued (2)Violation (2)Inspection (1)Special Inspection (11)
07/22/2026
Violation issued (ECB, open)
Construction
01/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/03/2024
Permit issued — General Construction
B01051692-I1-GC
06/03/2024
Permit issued — Plumbing
B01051692-S1-PL
05/23/2024
Filed — Alteration
REPLACE EXIST. PLUMBING FIXTURES IN 1ST FL. OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01051692-I1
05/23/2024
Filed — Alteration
REPLACE EXIST. PLUMBING FIXTURES IN 1ST FL. OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01051692-S1
05/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
05/23/2024
Special inspection requirement — Air barrier - visual inspection
Eric Sun
05/23/2024
Special inspection requirement — Fenestration air leakage
Eric Sun
05/23/2024
Special inspection requirement — Interior lighting power
Eric Sun
05/23/2024
Special inspection requirement — Insulation placement and R values
Eric Sun
05/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
05/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
05/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
05/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
05/15/2024
Special inspection requirement — Final
Eric Sun
05/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
05/20/2002
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILDERS GROUP NY06/03/2024
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/03/2024
BISPLISSUEDSTARLITE PLUMBING AND HEATING11/17/1995
BISEQISSUEDPAUL GRAHAM CARPENTRY11/09/1995
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/23/2024Fenestration and door U-factor and product ratingsEric Sunenergy_progress
05/23/2024Air barrier - visual inspectionEric Sunenergy_progress
05/23/2024Fenestration air leakageEric Sunenergy_progress
05/23/2024Interior lighting powerEric Sunenergy_progress
05/23/2024Insulation placement and R valuesEric Sunenergy_progress
05/15/2024Fire-Resistant Penetrations and JointsEric Sunspecial
05/15/2024Tenant Protection Plan ComplianceEric Sunspecial
05/15/2024Tenant Protection Plan ComplianceEric Sunspecial
05/15/2024Fire-Resistance Rated ConstructionEric Sunprogress
05/15/2024FinalEric Sunprogress
05/15/2024Fire-Resistant Penetrations and JointsEric Sunspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026B01051692-S1Request digital key ↗
08/25/2026B01051692-I1Request digital key ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B01051692-I1Open ↗
09/01/2026B01051692-I1Open ↗
09/01/2026B01051692-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01051692-I1Open ↗
09/01/2026B01051692-I1Open ↗
08/28/2026B01051692-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026B01051692-S1Open ↗
08/25/2026B01051692-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026B01051692-S1Open ↗
08/25/2026B01051692-I1Open ↗