Office with commercial, 1-6 stories
18-02 PETRACCA PLACE
QUEENS · College Point · BIN 4314678
💬 Discuss this project
1991Year Built
2Stories
O5Building Class
M1-1Zoning
47,498 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 1802 Petracca Place · 169,345 sf lot · 0.28 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNYS Department of Law29p · 1 filing · 20 docs
Floor 2NYS Department of Law54p · 3 filings · 20 docs
Floor 1NYS Department of Law53p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Petracca & Sons3007/08/2026
18-02 Petracca Place503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSF Engineering606/02/2022
Werfel, Lopinto, and Associates, AR104/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
George E Berger Ass1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
154-21 CorpGeneral Contractor1507/08/2026
Go Greener PlumbingFire Protection107/08/2026
Go Greener PlumbingPlumbing107/08/2026
Peter Miceli PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSF Engineering1274706/02/2022
Building Lifecycle
All (73)Filed (7)Permit Issued (10)Signed Off (4)Violation (21)Inspection (1)Special Inspection (30)
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2024
Signed off — Alteration
installation of new HVAC Rooftop units and modification and/or replacement of existing ductwork as shown on plans. Application filed in conjunction with Q00502725 (General Construction)
Q00502787-I1
04/19/2024
Signed off — Alteration
it is proposed to modify plumbing and sprinkler systems as shown on plans. Application filed in conjunction with Q00502725
Q00502819-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/15/2022
Signed off — Alteration
Q00503070-I1
06/23/2022
Signed off — Alteration
Q00502725-I1
06/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
06/03/2022
Special inspection requirement — Maintenance information
Nicholas Tucci
06/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
06/03/2022
Special inspection requirement — Heating Systems
Nicholas Tucci
06/03/2022
Special inspection requirement — Mechanical Systems
Nicholas Tucci
06/03/2022
Special inspection requirement — Final
Nicholas Tucci
06/03/2022
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
06/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
06/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
06/02/2022
Filed — Alteration
installation of new HVAC Rooftop units and modification and/or replacement of existing ductwork as shown on plans. Application filed in conjunction with Q00502725 (General Construction)
Q00502787-P2
05/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
05/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
05/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
05/02/2022
Special inspection requirement — Heating Systems
Nicholas Tucci
05/02/2022
Special inspection requirement — Mechanical Systems
Nicholas Tucci
05/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
05/02/2022
Special inspection requirement — Final
Nicholas Tucci
05/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
05/02/2022
Special inspection requirement — Maintenance information
Nicholas Tucci
03/02/2022
Permit issued — General Construction
Q00502725-I1-GC
12/21/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/08/2021
Permit issued — Mechanical Systems
Q00502787-I1-MS
12/08/2021
Permit issued — General Construction
Q00502725-I1-GC
09/29/2021
Permit issued — Boiler Equipment
Q00503070-I1-BE
09/22/2021
Filed — Alteration
installation of new HVAC Rooftop units and modification and/or replacement of existing ductwork as shown on plans. Application filed in conjunction with Q00502725 (General Construction)
Q00502787-P1
09/16/2021
Special inspection requirement — Sprinkler Systems
Nicholas Tucci
09/16/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
09/13/2021
Filed — Alteration
it is proposed to modify plumbing and sprinkler systems as shown on plans. Application filed in conjunction with Q00502725
Q00502819-P1
08/25/2021
Permit issued — General Construction
Q00502725-I1-GC
08/25/2021
Permit issued — Mechanical Systems
Q00502787-I1-MS
08/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
08/09/2021
Special inspection requirement — Heating Systems
Nicholas Tucci
08/09/2021
Special inspection requirement — Mechanical Systems
Nicholas Tucci
08/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
08/09/2021
Special inspection requirement — Final
Nicholas Tucci
08/09/2021
Special inspection requirement — Maintenance information
Nicholas Tucci
08/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
08/09/2021
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
08/09/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
08/09/2021
Special inspection requirement — Sprinkler Systems
Nicholas Tucci
07/22/2021
Permit issued — Mechanical Systems
Q00502787-I1-MS
06/23/2021
Permit issued — Sprinklers
Q00502819-I1-EW-SP
06/23/2021
Permit issued — Plumbing
Q00502819-I1-PL
06/23/2021
Permit issued — General Construction
Q00502725-I1-GC
05/03/2021
Filed — Alteration
it is proposed to modify plumbing and sprinkler systems as shown on plans. Application filed in conjunction with Q00502725
Q00502819-I1
05/03/2021
Filed — Alteration
Q00503070-I1
04/30/2021
Filed — Alteration
installation of new HVAC Rooftop units and modification and/or replacement of existing ductwork as shown on plans. Application filed in conjunction with Q00502725 (General Construction)
Q00502787-I1
04/29/2021
Filed — Alteration
Q00502725-I1
01/07/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/07/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-off154-21 Corp03/02/2022
DOB NOWMechanical SystemsSigned-off154-21 Corp12/08/2021
DOB NOWGeneral ConstructionSigned-off154-21 Corp12/08/2021
DOB NOWBoiler EquipmentSigned-offPeter Miceli Plumbing09/29/2021
DOB NOWGeneral ConstructionSigned-off154-21 Corp08/25/2021
DOB NOWMechanical SystemsSigned-off154-21 Corp08/25/2021
DOB NOWMechanical SystemsSigned-off154-21 Corp07/22/2021
DOB NOWSprinklersSigned-offGo Greener Plumbing06/23/2021
DOB NOWPlumbingSigned-offGo Greener Plumbing06/23/2021
DOB NOWGeneral ConstructionSigned-off154-21 Corp06/23/2021
BISOTISSUEDBrookside Environmetal11/23/2020
BISPLISSUEDStellmar Plumbing & Mechanical10/06/2017
BISSPISSUEDStellmar Plumbing & Mechanical10/06/2017
BISOTISSUEDKayco Construction09/26/2017
BISMHISSUEDKayco Construction09/26/2017
BIS—ISSUEDPetracca & Soncs02/14/2002
BIS—ISSUEDPetracca & Soncs04/30/2001
BIS—ISSUEDRockaway Triangle Associates Lim06/25/1992
1 project · most recent 03/03/2023
General Wiring
FiledStatusContractorScope
03/03/2023CompleteT.M.T. ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/21/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
06/03/2022HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
06/03/2022Maintenance informationNicholas Tuccienergy_progress
06/03/2022Fire-Resistant Penetrations and JointsNicholas Tuccispecial
06/03/2022Heating SystemsNicholas Tuccispecial
06/03/2022Mechanical SystemsNicholas Tuccispecial
06/03/2022FinalNicholas Tucciprogress
06/03/2022Energy Code Compliance InspectionsNicholas Tucciprogress
06/03/2022HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
06/03/2022HVAC-R and service water heating system controlsNicholas Tuccienergy_progress
05/02/2022HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
05/02/2022HVAC-R and service water heating system controlsNicholas Tuccienergy_progress
05/02/2022Fire-Resistant Penetrations and JointsNicholas Tuccispecial
05/02/2022Heating SystemsNicholas Tuccispecial
05/02/2022Mechanical SystemsNicholas Tuccispecial
05/02/2022Energy Code Compliance InspectionsNicholas Tucciprogress
05/02/2022FinalNicholas Tucciprogress
05/02/2022HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
05/02/2022Maintenance informationNicholas Tuccienergy_progress
09/16/2021Sprinkler SystemsNicholas Tuccispecial
09/16/2021HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
08/09/2021Fire-Resistant Penetrations and JointsNicholas Tuccispecial
08/09/2021Heating SystemsNicholas Tuccispecial
08/09/2021Mechanical SystemsNicholas Tuccispecial
08/09/2021Energy Code Compliance InspectionsNicholas Tucciprogress
08/09/2021FinalNicholas Tucciprogress
Latest 25 of 35.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NYS Department of LawOfficeFloors 1, 2, Roof
Project Q00502819 Alteration · LOC Issued · 05/03/2021
Project Q00503070 Alteration · LOC Issued · 05/03/2021
Project Q00502787 Alteration · LOC Issued · 04/30/2021
Project Q00502725 Alteration · LOC Issued · 04/29/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00502725-I1Request digital key ↗
08/27/2026Q00503070-I1Request digital key ↗
08/27/2026Q00502819-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION26
02/09/2026401235588Open ↗
02/04/2026401235588Open ↗
01/08/2026401235588Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION2
06/05/2025401235588Open ↗
11/23/2020440648195Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE COMPLIANCE1
11/23/2020440648195Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/29/2021401235588Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
11/18/2020440648195Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026Q00503070-I1Open ↗
09/23/2026Q00503070-I1Open ↗
09/23/2026Q00503070-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026Q00503070-I1Open ↗
08/28/2026Q00502787-P2Open ↗
08/28/2026Q00502787-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00502725-I1Open ↗
08/27/2026Q00503070-I1Open ↗
08/27/2026Q00502819-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/18/2020440648195Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/18/2020440648195Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/18/2020440648195Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/01/2025401235588Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026Q00502725-I1Open ↗
08/27/2026Q00503070-I1Open ↗
08/27/2026Q00502819-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026Q00502787-I1Open ↗
08/13/2026Q00502819-I1Open ↗
08/13/2026Q00502725-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/13/2021440648195Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/18/2020440648195Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00503070-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/02/2024401235588Open ↗
04/28/2021440648195Open ↗
04/14/2021440648195Open ↗
Showing 3 of 4 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
11/23/2020440648195Open ↗
▸Approvals, Objections & Sign-offs15
▸BISSCHEDULE A - OCCUPANCY / USE11
02/04/2026401235588Open ↗
01/06/2026401235588Open ↗
12/18/2025401235588Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/06/2021440648195Open ↗
01/13/2021440648195Open ↗
▸BISFINAL1
11/23/2020440648195Open ↗
▸BISSUPERSEDING LETTER1
06/05/2025401235588Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT (FINAL): PW32
07/28/2025401235588Open ↗
01/13/2021440648195Open ↗
▸BISCOST AFFIDAVIT1
11/18/2020440648195Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION7
01/08/2026401235588Open ↗
09/09/2025401235588Open ↗
06/04/2024401235588Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/18/2020440648195Open ↗
▸BISBOROUGH INTAKE FORM1
06/05/2025401235588Open ↗
▸Other Documents1
▸BIS* FIRE STOPS 27-3451
07/25/2025401235588Open ↗