← Back
Over six families without stores
18-11 21 DRIVE
QUEENS · BIN 4623392
💬 Discuss this project
2022Year Built
—Stories
C1Building Class
R5BZoning
11,019 sfGross Floor Area
12Units
Rent Stabilized13 Open Violations ▸
Over six families without stores · Owner of record: TOSKANA LLC · 3,071 sf lot · 3.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof4p · 2 filings · 20 docs
Bulkhead2p · 2 filings · 20 docs
Floor 310p · 4 filings · 20 docs
Floor 210p · 4 filings · 20 docs
Floor 19p · 3 filings · 20 docs
Cellar5p · 3 filings · 20 docs
3 jobs · most recent 06/30/2025
General Wiring
FiledStatusContractorScope
06/30/2025CompleteVALENTIS ELECTRIC, INC.General Wiring
11/21/2022Permit IssuedTITAN ELEC'L & ELEV CONTR—
11/29/2021CompleteHIGH QUALITY ELECTRIC OF—
1 job · most recent 02/25/2025
Concrete Masonry
FiledStatusContractorScope
02/25/2025Signed-offAKI RENOVATIONS GROUP INCConcrete, Masonry
1 job · most recent 04/13/2021
Fence
FiledStatusContractorScope
04/13/2021Permit IssuedSDS LEONARD LLCFence
Building Lifecycle
All (131)Filed (23)Permit Issued (24)Signed Off (9)Violation (25)Inspection (8)Objection (12)Special Inspection (30)
06/03/2026
Signed off — Alteration
structural work in conjunction to NB 420666274
Q00369199-I1
01/20/2026
Permit issued — Structural
Q00369199-I1-ST
05/30/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH CONSTRUCTION OF NEW 3 STORY APARTMENT BUILDING.
Q00336160-I1
05/01/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/25/2025
Permit issued — Curb Cut
Q00349598-I1-CC
04/16/2025
Signed off — Alteration
Herewith filing for installation of wall hung boilers in three (3) separate boiler rooms. Filed in conjunction with new building #420666274.
Q01003697-S1
04/15/2025
Signed off — Alteration
Herewith filing for installation of wall hung boilers in three (3) separate boiler rooms. Filed in conjunction with new building #420666274.
Q01003697-I1
04/15/2025
Permit issued — Mechanical Systems
Q00336160-I1-MS
03/07/2025
Signed off — Alteration
HEREWITH FILING FOR HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 420666274.
Q00336159-I1
03/07/2025
Signed off — Alteration
plumbing in conjunction with NB
Q00335398-I1
02/28/2025
Permit issued — Plumbing
Q00335398-I1-PL
02/25/2025
Filed — Alteration
structural work in conjunction to NB 420666274
Q00369199-P3
02/25/2025
Special inspection requirement — Final
OLULADE ADEMOKUN
02/25/2025
Special inspection requirement — Masonry
OLULADE ADEMOKUN
02/25/2025
Special inspection requirement — Concrete - Cast-In-Place
OLULADE ADEMOKUN
02/20/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
02/20/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/13/2025
Filed — Alteration
structural work in conjunction to NB 420666274
Q00369199-P2
02/12/2025
Permit issued — Sprinklers
Q00336159-I1-EW-SP
01/31/2025
Special inspection requirement — Maintenance information
OLULADE ADEMOKUN
01/31/2025
Special inspection requirement — HVAC and service water heating system controls
OLULADE ADEMOKUN
01/31/2025
Special inspection requirement — HVAC insulation and sealing
OLULADE ADEMOKUN
01/31/2025
Special inspection requirement — HVAC and service water heating equipment
OLULADE ADEMOKUN
01/31/2025
Special inspection requirement — Mechanical Systems
OLULADE ADEMOKUN
01/31/2025
Special inspection requirement — Final
OLULADE ADEMOKUN
01/29/2025
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH CONSTRUCTION OF NEW 3 STORY APARTMENT BUILDING.
Q00336160-P1
01/29/2025
Special inspection requirement — Concrete - Cast-In-Place
OLULADE ADEMOKUN
01/29/2025
Special inspection requirement — Final
OLULADE ADEMOKUN
01/29/2025
Special inspection requirement — Masonry
OLULADE ADEMOKUN
01/21/2025
Special inspection requirement — Final
OLULADE ADEMOKUN
01/21/2025
Special inspection requirement — HVAC and service water heating system controls
OLULADE ADEMOKUN
01/21/2025
Special inspection requirement — HVAC insulation and sealing
OLULADE ADEMOKUN
01/21/2025
Special inspection requirement — HVAC and service water heating equipment
OLULADE ADEMOKUN
01/21/2025
Special inspection requirement — Mechanical Systems
OLULADE ADEMOKUN
01/21/2025
Special inspection requirement — Maintenance information
OLULADE ADEMOKUN
01/10/2025
Permit issued — Sprinklers
Q00336159-I1-EW-SP
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2024
Permit issued — Construction Fence
Q00408763-I1-FN
05/22/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/16/2024
Filed — Alteration
Herewith filing for installation of wall hung boilers in three (3) separate boiler rooms. Filed in conjunction with new building #420666274.
Q01003697-P4
05/16/2024
Filed — Alteration
Herewith filing for installation of wall hung boilers in three (3) separate boiler rooms. Filed in conjunction with new building #420666274.
Q01003697-P3
05/16/2024
Filed — Alteration
plumbing in conjunction with NB
Q00335398-P1
05/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
OLULADE ADEMOKUN
05/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
OLULADE ADEMOKUN
05/15/2024
Special inspection requirement — Maintenance information
OLULADE ADEMOKUN
05/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLULADE ADEMOKUN
05/15/2024
Special inspection requirement — Heating Systems
OLULADE ADEMOKUN
05/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
OLULADE ADEMOKUN
05/14/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/08/2024
Filed — Alteration
Herewith filing for installation of wall hung boilers in three (3) separate boiler rooms. Filed in conjunction with new building #420666274.
Q01003697-P2
05/08/2024
Filed — Alteration
Herewith filing for installation of wall hung boilers in three (3) separate boiler rooms. Filed in conjunction with new building #420666274.
Q01003697-P1
05/07/2024
Special inspection requirement — Heating Systems
OLULADE ADEMOKUN
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLULADE ADEMOKUN
05/07/2024
Special inspection requirement — Heating Systems
OLULADE ADEMOKUN
05/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
OLULADE ADEMOKUN
05/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
OLULADE ADEMOKUN
05/07/2024
Special inspection requirement — Maintenance information
OLULADE ADEMOKUN
03/26/2024
Permit issued — Boiler Equipment
Q01003697-S1-BE
03/26/2024
Permit issued — Boiler Equipment
Q01003697-I1-BE
02/28/2024
Permit issued — Construction Fence
Q00408763-I1-FN
Latest 60 of 131 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RENNON CONSTRUCTION1707/08/2026
GRAND N REALTY3407/08/2026
AKI RENOVATIONS GROUP3207/08/2026
TOSKANA1203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/15/2019$1.5M—Private party → TOSKANA LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
QUICK FILING OF NY INC903/21/2026
RENNON CONSTRUCTION503/21/2026
NDKAZALAS ARCHITECTURE103/21/2026
BSGNY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKI RENOVATIONS GROUP INCGeneral Contractor1707/08/2026
AP PLUMBING & HVAC LLCPlumbing707/08/2026
RENNON CONSTRUCTION CORPGeneral Contractor607/08/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection407/08/2026
SDS LEONARD LLCGeneral Contractor307/08/2026
VALENTIS ELECTRIC, INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOADEM CORPORATION43501302/25/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offAKI RENOVATIONS GROUP INC01/20/2026
DOB NOWCurb CutPermit IssuedAKI RENOVATIONS GROUP INC04/25/2025
DOB NOWMechanical SystemsSigned-offAKI RENOVATIONS GROUP INC04/15/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG02/28/2025
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP02/12/2025
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP01/10/2025
DOB NOWConstruction FencePermit IssuedSDS LEONARD LLC10/23/2024
DOB NOWBoiler EquipmentSigned-offCROSSFIELD PLBG.&HTG03/26/2024
DOB NOWBoiler EquipmentSigned-offCROSSFIELD PLBG.&HTG03/26/2024
DOB NOWConstruction FencePermit IssuedSDS LEONARD LLC02/28/2024
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG10/25/2023
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP07/14/2023
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP12/12/2022
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP12/05/2022
DOB NOWMechanical SystemsSigned-offAKI RENOVATIONS GROUP INC10/14/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG10/13/2022
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP07/09/2022
DOB NOWConstruction FencePermit IssuedAKI RENOVATIONS GROUP INC07/07/2022
DOB NOWConstruction FencePermit IssuedAKI RENOVATIONS GROUP INC05/17/2022
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP11/24/2021
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP11/22/2021
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG09/30/2021
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG05/11/2021
DOB NOWConstruction FencePermit IssuedAKI RENOVATIONS GROUP INC04/17/2021
BIS—ISSUEDAKI RENOVATIONS GROUP INC12/18/2024
BIS—ISSUEDAKI RENOVATIONS GROUP INC12/21/2023
BIS—ISSUEDAKI RENOVATIONS GROUP INC10/23/2023
BIS—ISSUEDAKI RENOVATIONS GROUP INC04/13/2023
BIS—ISSUEDAKI RENOVATIONS GROUP INC09/23/2022
BIS—ISSUEDAKI RENOVATIONS GROUP INC03/17/2022
BIS—ISSUEDAKI RENOVATIONS GROUP INC01/19/2022
BIS—ISSUEDAKI RENOVATIONS GROUP INC01/19/2022
BIS—ISSUEDAKI RENOVATIONS GROUP INC11/17/2021
BIS—ISSUEDAKI RENOVATIONS GROUP INC11/17/2021
BIS—ISSUEDAKI RENOVATIONS GROUP INC05/05/2021
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/01/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
02/20/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
02/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/14/2024Pass-Final Boiler Equipment InspectionPassView ↗
02/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/28/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/28/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
02/25/2025FinalOLULADE ADEMOKUNprogress
02/25/2025MasonryOLULADE ADEMOKUNspecial
02/25/2025Concrete - Cast-In-PlaceOLULADE ADEMOKUNspecial
01/31/2025Maintenance informationOLULADE ADEMOKUNenergy_progress
01/31/2025HVAC and service water heating system controls OLULADE ADEMOKUNenergy_progress
01/31/2025HVAC insulation and sealing OLULADE ADEMOKUNenergy_progress
01/31/2025HVAC and service water heating equipment OLULADE ADEMOKUNenergy_progress
01/31/2025Mechanical SystemsOLULADE ADEMOKUNspecial
01/31/2025FinalOLULADE ADEMOKUNprogress
01/29/2025Concrete - Cast-In-PlaceOLULADE ADEMOKUNspecial
01/29/2025FinalOLULADE ADEMOKUNprogress
01/29/2025MasonryOLULADE ADEMOKUNspecial
01/21/2025FinalOLULADE ADEMOKUNprogress
01/21/2025HVAC and service water heating system controls OLULADE ADEMOKUNenergy_progress
01/21/2025HVAC insulation and sealing OLULADE ADEMOKUNenergy_progress
01/21/2025HVAC and service water heating equipment OLULADE ADEMOKUNenergy_progress
01/21/2025Mechanical SystemsOLULADE ADEMOKUNspecial
01/21/2025Maintenance informationOLULADE ADEMOKUNenergy_progress
05/15/2024HVAC-R and service water piping design and insulationOLULADE ADEMOKUNenergy_progress
05/15/2024HVAC-R and service water heating equipmentOLULADE ADEMOKUNenergy_progress
05/15/2024Maintenance informationOLULADE ADEMOKUNenergy_progress
05/15/2024Fire-Resistant Penetrations and JointsOLULADE ADEMOKUNspecial
05/15/2024Heating SystemsOLULADE ADEMOKUNspecial
05/15/2024HVAC-R and service water heating system controlsOLULADE ADEMOKUNenergy_progress
05/07/2024Heating SystemsOLULADE ADEMOKUNspecial
Latest 25 of 33.
▾Documents — 214 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch11
08/26/2026Q00634703-P2Request digital key ↗
08/26/2026Q00634703-I1Request digital key ↗
08/26/2026Q00634703-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Structural4
08/27/2026Q00369199-P1Request digital key ↗
08/27/2026Q00369199-I1Request digital key ↗
08/15/2026Q00369199-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/28/2026Q00328734-I1Request digital key ↗
08/27/2026Q00408763-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/27/2026Q00336160-P1Request digital key ↗
08/15/2026Q00336160-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00335398-I1Request digital key ↗
08/15/2026Q00335398-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/27/2026Q00336159-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026Q00349598-I1Request digital key ↗
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION15
06/26/2025420666274Open ↗
05/06/2025420666274Open ↗
05/06/2025420666274Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
04/07/2025420666274Open ↗
02/10/2025420666274Open ↗
10/16/2023420666274Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
11/21/2022440593742Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/05/2025420666274Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
03/04/2025420666274Open ↗
02/26/2021420666274Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/19/2020420666274Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/19/2020420666274Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
11/19/2020420666274Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/19/2020420666274Open ↗
▸Seals & Professional Certifications60
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/28/2026Q00328734-I1Open ↗
08/27/2026Q00335398-I1Open ↗
08/27/2026Q00335398-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/02/2026Q00336160-P1Open ↗
09/02/2026Q00336160-P1Open ↗
09/02/2026Q00336160-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026Q00336160-P1Open ↗
09/01/2026Q01003697-P4Open ↗
09/01/2026Q01003697-P4Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/01/2021420666274Open ↗
07/01/2021420666274Open ↗
07/01/2021420666274Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/13/2020440593742Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/22/2025420666274Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
02/26/2021420666274Open ↗
▸BISHEATING SYSTEMS1
05/21/2025420666274Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
11/22/2022440593742Open ↗
11/19/2020420666274Open ↗
▸BISSTREET TREES SITE PLAN2
06/03/2025420666274Open ↗
11/22/2022440593742Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
05/21/2025420666274Open ↗
01/27/2025420666274Open ↗
▸BISSTREET TREE CHECKLIST1
11/19/2020420666274Open ↗
▸BISSTREET TREE SIGNOFF1
06/03/2025420666274Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/01/2021420666274Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/24/2025420666274Open ↗
11/19/2020420666274Open ↗
11/19/2020420666274Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/01/2021420666274Open ↗
07/01/2021420666274Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/22/2025420666274Open ↗
▸BISFENESTRATION AREAS1
05/22/2025420666274Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/22/2025420666274Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/03/2025420666274Open ↗
▸BIS* HVAC INSULATION AND SEALING1
05/22/2025420666274Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/03/2025420666274Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
06/20/2025420666274Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/22/2025420666274Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00336160-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00336160-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/24/2025420666274Open ↗
01/24/2025420666274Open ↗
01/24/2025420666274Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
07/01/2021420666274Open ↗
07/01/2021420666274Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY2
05/21/2025420666274Open ↗
01/27/2025420666274Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
05/22/2025420666274Open ↗
01/27/2025420666274Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/21/2025420666274Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/21/2025420666274Open ↗
▸BISMASONRY1
05/21/2025420666274Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
05/21/2025420666274Open ↗
▸BISSOIL REPORT1
11/19/2020420666274Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/01/2021420666274Open ↗
▸BISMECHANICAL SYSTEMS1
05/21/2025420666274Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
06/03/2025420666274Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/21/2025420666274Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE3
04/07/2025420666274Open ↗
02/23/2021420666274Open ↗
10/01/2020420666274Open ↗
▸BISSUPERSEDING LETTER3
05/26/2022420666274Open ↗
05/12/2022420666274Open ↗
03/08/2022420666274Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/14/2022420666274Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
05/06/2025420666274Open ↗
07/01/2021420666274Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
06/23/2023420666274Open ↗
▸Filing & Intake Forms27
▸BISADDITIONAL INFORMATION15
04/28/2025420666274Open ↗
03/04/2025420666274Open ↗
03/04/2025420666274Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM9
05/06/2025420666274Open ↗
05/06/2025420666274Open ↗
07/14/2023420666274Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET2
11/02/2020420666274Open ↗
11/02/2020420666274Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/13/2020440593742Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/22/2022440593742Open ↗
11/22/2022440593742Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
05/21/2025420666274Open ↗
▸BISUNDERPINNING (2014)1
05/21/2025420666274Open ↗
▸BISMAINTENANCE INFORMATION1
05/22/2025420666274Open ↗
▸BISPERMANENT CERTIFICATE1
05/22/2025420666274Open ↗
▸BISBPP-DOT: RELOCATE STREET LIGHT1
02/01/2023440593742Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
05/22/2025420666274Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
05/21/2025420666274Open ↗