← Back
BuildNYC
Five to six families
18-11 MENAHAN STREET
QUEENS · Ridgewood · BIN 4437709
💬 Discuss this project
2024Year Built
5Stories
C2Building Class
R6BZoning
4,559 sfGross Floor Area
6Units
0 Active ViolationsFDNY Report ↗
Five to six families · Owner of record: 1811 Menahan St · 2,003 sf lot · 2.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof92p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Penthouse68p · 1 filing · 20 docs
Floor 530p · 1 filing · 20 docs
Floor 491p · 1 filing · 20 docs
Floor 395p · 1 filing · 20 docs
Floor 291p · 1 filing · 20 docs
Floor 1Heavy duty sidewalk shed installation96p · 2 filings · 20 docs
Cellar92p · 1 filing · 20 docs
Site & exteriorTemporary pipe scaffold installation33p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BQM Real Estate2207/08/2026
565 LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/04/2024$850K—1811 MENAHAN LLC → 1811 MENAHAN ST LLC$186/sf building
05/20/2022$675K—565 SENECA LLC → 1811 MENAHAN LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Melamed Architect1005/04/2026
Mje Professional Services211/29/2024
AG Engineering109/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting1203/21/2026
YK Expediting403/21/2026
SNR Expediting Design403/21/2026
Advanced Builders Services103/21/2026
Kma Designs203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Decosta ConstructionGeneral Contractor1707/08/2026
B36 ServicesGeneral Contractor607/08/2026
Safeline GroupScaffold407/08/2026
Accurate ElectricalElectrical303/21/2026
Decosta ConstructionScaffold303/21/2026
Ness Mechanical P & HPlumbing107/08/2026
Quality PipingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering85241005/04/2026
Building Lifecycle
08/01/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q00701894-I1-GC
07/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2026
Apartment 4 sold
05/06/2026
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
101 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedB36 Services08/01/2025
DOB NOWFoundationSigned-offB36 Services08/01/2025
DOB NOWMechanical SystemsSigned-offB36 Services08/01/2025
DOB NOWStructuralSigned-offB36 Services08/01/2025
DOB NOWGeneral ConstructionPermit IssuedDecosta Construction03/12/2025
DOB NOWSupported ScaffoldSigned-offSafeline Group11/29/2024
DOB NOWSidewalk ShedSigned-offSafeline Group11/01/2024
DOB NOWGeneral ConstructionPermit IssuedDecosta Construction10/30/2024
DOB NOWPlumbingSigned-offNess Mechanical P & H10/17/2024
DOB NOWSprinklersSigned-offQuality Piping10/17/2024
DOB NOWStructuralSigned-offDecosta Construction10/17/2024
DOB NOWFoundationSigned-offDecosta Construction10/17/2024
DOB NOWSupport of ExcavationSigned-offDecosta Construction10/17/2024
DOB NOWSupport of ExcavationSigned-offDecosta Construction10/16/2024
DOB NOWFoundationSigned-offDecosta Construction10/15/2024
DOB NOWMechanical SystemsSigned-offDecosta Construction10/15/2024
DOB NOWConstruction FenceSigned-offDecosta Construction10/15/2024
DOB NOWStructuralSigned-offDecosta Construction10/15/2024
BIS—ISSUEDBuildingrite12/06/2021
BISEQISSUEDBuildingrite12/06/2021
BISEQISSUEDAngel Restoration08/08/2019
BISEQISSUEDAngel Restoration05/31/2018
BIS—ISSUEDAngel Restoration05/16/2017
BISEQISSUEDAngel Restoration06/13/2016
1 project · most recent 05/04/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
05/04/2026Signed-offB36 ServicesAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 05/04/2026
Sprinkler System
FiledStatusContractorScope
05/04/2026Signed-offQuality PipingSprinkler System
1 project · most recent 05/04/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/04/2026Signed-offNess Mechanical P & HStorm, Water/Sanitary
2 projects · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025CompleteAccurate ElectricalGeneral Wiring
11/01/2024CompleteRichard Neu—
1 project · most recent 05/04/2026
Steel Concrete Masonry
FiledStatusContractorScope
05/04/2026Permit IssuedB36 ServicesSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/16/2025Fail-Final CND-Occupancy InspectionFailView ↗
09/02/2025Fail-Final CND-Occupancy InspectionFailView ↗
08/27/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/11/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
03/24/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
05/06/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/06/2026PreliminaryShahrish Shuvoprogress
05/06/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
05/06/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
05/06/2026Air barrier - visual inspectionShahrish Shuvoenergy_progress
05/06/2026Interior lighting powerShahrish Shuvoenergy_progress
05/06/2026Fenestration air leakageShahrish Shuvoenergy_progress
05/06/2026Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
05/06/2026Fenestration areasShahrish Shuvoenergy_progress
05/06/2026Lighting in dwelling unitsShahrish Shuvoenergy_progress
05/06/2026MeteringShahrish Shuvoenergy_progress
05/06/2026Insulation placement and R valuesShahrish Shuvoenergy_progress
05/06/2026Maintenance informationShahrish Shuvoenergy_progress
05/06/2026Exterior lighting powerShahrish Shuvoenergy_progress
05/06/2026Protection of exposed foundation insulationShahrish Shuvoenergy_progress
05/06/2026Lighting controlsShahrish Shuvoenergy_progress
09/05/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesShahrish Shuvospecial
09/05/2025Sprinkler SystemsShahrish Shuvospecial
09/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationShahrish Shuvospecial
09/05/2025Post-installed AnchorsShahrish Shuvospecial
09/05/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
09/05/2025Seismic Isolation SystemsShahrish Shuvospecial
09/05/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
09/05/2025HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
09/05/2025Maintenance informationShahrish Shuvoenergy_progress
Latest 25 of 61.
150 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account