← Back
Two family frame
18-14 120 STREET
QUEENS · BIN 4098251
💬 Discuss this project
1910Year Built
2.5Stories
B2Building Class
R4AZoning
2,148 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar3p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/26/2024$765K—— → —$356/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SU ARCHITECT, P.C.512/22/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI STATE PLBG & HTG INCPlumbing307/08/2026
BUILDER BROTHER GROUP INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SU ARCHITECT PC6857512/22/2025
Building Lifecycle
All (76)Filed (5)Permit Issued (4)Signed Off (2)Inspection (5)Objection (30)Special Inspection (30)
03/13/2026
Signed off — Alteration
TO PROPOSE PLUMBING WORK AT CEL, 001 TO 002 FL FOR EXISTING 2-FAMILY DWELLING AND A DRYWELL AT REAR YARD IN CONJUNCTION WITH GC WORK TYPE Q01118443-I1 AS PER PLAN FILED HEREWITH. NOCHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01167399-I1
01/12/2026
Signed off — Alteration
TO PROPOSE HORIZONTAL EXTENSION AT REAR AND INTERIOR RENOVATION OF EXISTING TWO-FAMILY HOUSE AS PER PLAN FILED HEREWITH. NO CHANGE OF EGRESS, USE OR CERTIFICATE OF OCCUPANCY.
Q01118443-I1
01/09/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/31/2025
Special inspection requirement — Fenestration air leakage
QIANG SU
12/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
12/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
QIANG SU
12/31/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
QIANG SU
12/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
QIANG SU
12/31/2025
Special inspection requirement — Permanent certificate
QIANG SU
12/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
QIANG SU
12/31/2025
Special inspection requirement — Maintenance information
QIANG SU
12/31/2025
Special inspection requirement — Air barrier — testing
QIANG SU
12/31/2025
Special inspection requirement — Interior lighting power
QIANG SU
12/31/2025
Special inspection requirement — Air barrier - visual inspection
QIANG SU
12/31/2025
Special inspection requirement — Metering
QIANG SU
12/31/2025
Special inspection requirement — Insulation placement and R values
QIANG SU
12/31/2025
Special inspection requirement — Fenestration areas
QIANG SU
12/31/2025
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
12/31/2025
Special inspection requirement — Lowest Floor Elevation
QIANG SU
12/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
QIANG SU
12/31/2025
Special inspection requirement — Subgrade Inspections
QIANG SU
12/31/2025
Special inspection requirement — Masonry
QIANG SU
12/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
12/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIANG SU
12/31/2025
Special inspection requirement — Concrete - Cast-In-Place
QIANG SU
12/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
QIANG SU
12/31/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
QIANG SU
12/22/2025
Filed — Alteration
TO PROPOSE PLUMBING WORK AT CEL, 001 TO 002 FL FOR EXISTING 2-FAMILY DWELLING AND A DRYWELL AT REAR YARD IN CONJUNCTION WITH GC WORK TYPE Q01118443-I1 AS PER PLAN FILED HEREWITH. NOCHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01167399-P1
12/22/2025
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
12/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
QIANG SU
12/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
QIANG SU
12/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
12/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
QIANG SU
12/05/2025
Permit issued — Plumbing
Q01167399-I1-PL
10/15/2025
Filed — Alteration
TO PROPOSE HORIZONTAL EXTENSION AT REAR AND INTERIOR RENOVATION OF EXISTING TWO-FAMILY HOUSE AS PER PLAN FILED HEREWITH. NO CHANGE OF EGRESS, USE OR CERTIFICATE OF OCCUPANCY.
Q01118443-P1
08/29/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/29/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/25/2025
Permit issued — Plumbing
Q01167399-I1-PL
07/23/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/12/2025
Permit issued — Plumbing
Q01167399-I1-PL
01/31/2025
Objection resolved — Addressed
01/31/2025
Objection resolved — Addressed
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection resolved — Addressed
01/28/2025
Objection raised — Plumbing
01/28/2025
Objection raised — Plumbing
01/28/2025
Objection raised — Plumbing
01/28/2025
Objection raised — Plumbing
01/28/2025
Objection raised — Plumbing
01/16/2025
Filed — Alteration
TO PROPOSE PLUMBING WORK AT CEL, 001 TO 002 FL FOR EXISTING 2-FAMILY DWELLING AND A DRYWELL AT REAR YARD IN CONJUNCTION WITH GC WORK TYPE Q01118443-I1 AS PER PLAN FILED HEREWITH. NOCHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01167399-I1
01/13/2025
Permit issued — General Construction
Q01118443-I1-GC
12/18/2024
Objection resolved — Addressed
12/05/2024
Objection raised — Other
11/25/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/01/2024
Filed — Alteration
Q01134421-I1
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC12/05/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC08/25/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC03/12/2025
DOB NOWGeneral ConstructionSigned-offBUILDER BROTHER GROUP INC01/13/2025
1 project · most recent 04/26/2025
General Wiring
FiledStatusContractorScope
04/26/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/09/2026Pass-Final General Construction Non-Directive 14PassView ↗
08/29/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/29/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/23/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
12/31/2025Fenestration air leakageQIANG SUenergy_progress
12/31/2025HVAC-R and service water piping design and insulationQIANG SUenergy_progress
12/31/2025Fenestration and door U-factor and product ratingsQIANG SUenergy_progress
12/31/2025Exterior Insulation and Finish Systems (EIFS)QIANG SUspecial
12/31/2025HVAC-R and service water heating system controlsQIANG SUenergy_progress
12/31/2025Permanent certificateQIANG SUenergy_progress
12/31/2025HVAC-R and service water heating equipmentQIANG SUenergy_progress
12/31/2025Maintenance informationQIANG SUenergy_progress
12/31/2025Air barrier — testing QIANG SUenergy_progress
12/31/2025Interior lighting powerQIANG SUenergy_progress
12/31/2025Air barrier - visual inspectionQIANG SUenergy_progress
12/31/2025MeteringQIANG SUenergy_progress
12/31/2025Insulation placement and R valuesQIANG SUenergy_progress
12/31/2025Fenestration areasQIANG SUenergy_progress
12/31/2025Energy Code Compliance InspectionsQIANG SUprogress
12/31/2025Lowest Floor ElevationQIANG SUprogress
12/31/2025Fire-Resistance Rated ConstructionQIANG SUprogress
12/31/2025Subgrade InspectionsQIANG SUspecial
12/31/2025MasonryQIANG SUspecial
12/31/2025Fire-Resistant Penetrations and JointsQIANG SUspecial
12/31/2025Structural Stability – Alterations of existing buildingsQIANG SUspecial
12/31/2025Concrete - Cast-In-PlaceQIANG SUspecial
12/31/2025Tenant Protection Plan ComplianceQIANG SUspecial
12/31/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationQIANG SUspecial
12/22/2025Energy Code Compliance InspectionsQIANG SUprogress
Latest 25 of 55.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01118443-P1Request digital key ↗
08/21/2026Q01118443-I1Request digital key ↗
08/21/2026Q01134421-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026Q01167399-P1Open ↗
08/13/2026Q01167399-I1Open ↗
08/13/2026Q01118443-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q01118443-P1Open ↗
08/13/2026Q01134421-I1Open ↗
08/13/2026Q01118443-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026Q01118443-I1Open ↗
09/02/2026Q01118443-I1Open ↗
09/02/2026Q01118443-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q01118443-I1Open ↗
09/02/2026Q01118443-I1Open ↗
08/26/2026Q01118443-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01167399-I1Open ↗
08/21/2026Q01167399-P1Open ↗
08/13/2026Q01118443-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026Q01167399-P1Open ↗
08/21/2026Q01167399-I1Open ↗
08/13/2026Q01118443-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/13/2026Q01118443-I1Open ↗
08/13/2026Q01134421-I1Open ↗
08/13/2026Q01118443-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q01134421-I1Open ↗
08/13/2026Q01118443-P1Open ↗
08/13/2026Q01118443-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q01118443-P1Open ↗
08/13/2026Q01118443-I1Open ↗
08/13/2026Q01134421-I1Open ↗